United States Department of the Interior Bureau of Land Management
Gunnison Field Office
Cochetopa Canyon Toilet Building Replacements
SPECIFICATIONS
Site 6 Toilet Site 1 Toilet Site 7 Toilet
Cochetopa Canyon Toilet Replacements COCHETOPA
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 20 00 PRICE AND PAYMENT PROCEDURES
01 32 01 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00 DEMOLITION
DI VI SI ON 12 - FURNI SHI NGS
12 60 00 PRECAST CONCRETE TOILET BUILDING
DI VI SI ON 31 - EARTHWORK
31 00 00 EARTHWORK
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 PROJECT DESCRIPTION
The work includes, but is not limited to; demolition of existing toilet buildings, construction of new precast toilet buildings, and site work.
1.2 LOCATION
The project is located in Saguache County, Colorado, about 25 miles southeast of Gunnison, CO. Along highway 114, in the Cochetopa Canyon.
Site 1 Approximate Location:
Latitude 38.307393° Longitude -106.763762°
Site 6 Approximate Location:
Latitude 38.338206° Longitude -106.774089°
Site 7 Approximate Location:
Latitude 38.350317° Longitude -106.781169°
1.3 WORK SCHEDULE
Work shall be complete within 150 days of the Notice to Proceed. Work shall occur Monday - Friday, excluding federal holidays.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 11 00 Page 2
SECTION 01 20 00
PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
Payment items for the work of this contract for which contract payments will be made are listed in the SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job are included in the listed job item most closely associated with the work involved. The price and payment made for each item listed constitutes full compensation for furnishing all labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.1 MOBILIZATION AND DEMOBILIZATION
1.1.1 Payment
Payment will be made for costs associated with mobilization and demobilization.
When 5% of the original Contract amount is earned from other bid items, 50% of the amount bid for mobilization or 5% of the original Contract amount, whichever is lesser, will be paid.
When 15% of the original Contract amount is earned from other bid items, 100% of the amount bid for mobilization or 8% of the original Contract amount, whichever is lesser, will be paid.
Upon completion of work for the project, payment of the amount bid for mobilization in excess of 8% of the original Contract amount, will be paid.
1.1.2 Unit of Measure
Unit of measure: job.
1.2 SITE 1 - DEMOLITION
1.2.1 Payment
Payment will be made for all costs associated with demolition. Including removal of human waste from existing toilet building, transportation and disposal.
1.2.2 Unit of Measure
Unit of measure: job.
SECTION 01 20 00 Page 3
1.3 SITE 1 - PRECAST TOILET BUILDING
1.3.1 Payment
Payment will be made for all costs associated with providing a precast toilet building. Including preparation, excavation, transportation, bedding material, installation, backfill compaction, and site grading.
1.3.2 Unit of Measure
Unit of measure: job.
1.4 SITE 1 - AGGREGATE
1.4.1 Payment
Payment will be made for all costs associated with providing aggregate surfacing. Including preparation, transportation, placement, moisture conditioning, and compaction.
1.4.2 Unit of Measure
Unit of measure: ton
1.5 SITE 6 - DEMOLITION
1.5.1 Payment
Payment will be made for all costs associated with demolition. Including removal of human waste from existing toilet building, transportation and disposal.
1.5.2 Unit of Measure
Unit of measure: job.
1.6 SITE 6 - PRECAST TOILET BUILDING
1.6.1 Payment
Payment will be made for all costs associated with providing a precast toilet building. Including preparation, excavation, transportation, bedding material, installation, backfill compaction, and site grading.
1.6.2 Unit of Measure
SECTION 01 20 00 Page 4
1.7 SITE 6 - AGGREGATE
1.7.1 Payment
Payment will be made for all costs associated with providing aggregate surfacing. Including preparation, transportation, placement, moisture conditioning, and compaction.
1.7.2 Unit of Measure
Unit of measure: ton
1.8 SITE 6 - EXISTING BOULDER PLACEMENT
1.8.1 Payment
Payment will be made for all costs associated with relocating and placing existing boulders.
1.8.2 Unit of Measure
Unit of measure: job.
1.9 SITE 7 - DEMOLITION
1.9.1 Payment
Payment will be made for all costs associated with demolition. Including removal of human waste from existing toilet building, transportation and disposal.
1.9.2 Unit of Measure
Unit of measure: job.
1.10 SITE 7 - PRECAST TOILET BUILDING
1.10.1 Payment
Payment will be made for all costs associated with providing a precast toilet building. Including preparation, excavation, transportation, bedding material, installation, backfill compaction, and site grading.
1.10.2 Unit of Measure
SECTION 01 20 00 Page 5
1.11 SITE 7 - AGGREGATE
1.11.1 Payment
Payment will be made for all costs associated with providing aggregate surfacing. Including preparation, transportation, placement, moisture conditioning, and compaction.
1.11.2 Unit of Measure
Unit of measure: ton
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 20 00 Page 6
SECTION 01 32 01
PROJECT SCHEDULE
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Initial Project Schedule ; G
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
Prepare for approval a Project Schedule, as specified herein, and pursuant to FAR Clause 52.236-15 Schedules for Construction Contracts. Show in the schedule the proposed sequence to perform the work and dates contemplated for starting and completing all schedule activities. The scheduling of the entire project is required.
3.2 PROJECT SCHEDULE DETAILED REQUIREMENTS
3.2.1 Level of Detail Required
Develop the Project Schedule to the appropriate level of detail to address major milestones and to allow for satisfactory project planning and execution.
3.2.2 Mandatory Tasks
Include the following activities/tasks in the initial project schedule and all updates.
a. Submission, review and acceptance of submittals.
b. Long procurement activities
c. Contractor's pre-final inspection.
d. Government's pre-final inspection.
e. Final inspection.
SECTION 01 32 01 Page 7
3.2.3 Government Activities
Include Government activities that could impact progress. These activities include, but are not limited to: Government inspections of work, Government approval of submittals.
3.3 WEEKLY PROGRESS MEETINGS
Conduct a weekly meeting with the Government for the purpose of jointly reviewing the actual progress of the project as compared to the as planned progress and to review planned activities.
3.4 FAILURE TO ACHIEVE PROGRESS
Should the progress fall behind the approved project schedule, the Contracting Officer may require provision of a written recovery plan for approval. The plan must detail how progress will be made-up to include which activities will be accelerated by adding additional crews, longer work hours, extra work days, etc.
3.4.1 Failure to Perform
Failure to perform work and maintain progress in accordance with the supplemental recovery plan may result in an interim and final unsatisfactory performance rating and may result in corrective action directed by the Contracting Officer pursuant to FAR 52.236-15 Schedules for Construction Contracts, FAR 52.249-10 Default (Fixed-Price Construction), and other contract provisions.
3.4.2 Recovery Schedule
Should the Contracting Officer find it necessary, submit a recovery schedule pursuant to FAR 52.236-15 Schedules for Construction Contracts.
SECTION 01 32 01 Page 8
SECTION 01 33 00
SUBMITTAL PROCEDURES
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only.
1.2 INFORMATION ONLY SUBMITTALS
Normally submittals for information only will not be returned. Approval of the Contracting Officer's Representative is not required on information only submittals. The Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract.
This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications; will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work; and does not relieve the Contractor of the requirement to furnish samples for testing by the Government laboratory or for check testing by the Government in those instances where the technical specifications so prescribe.
1.3 GOVERNMENT APPROVING AUTHORITY
The Contracting Officer's Representative will:
a. Note the date on which the submittal was received.
b. Review submittals for approval within 10 days of receipt.
c. Identify returned submittals with one of the actions defined in paragraph REVIEW NOTATIONS and with markings appropriate for action indicated.
Upon completion of review of submittals requiring Government approval, one copy of the submittal will be retained by the Contracting Officer's Representative and one copy of the submittal will be returned to the Contractor.
1.3.1 Review Notations
Submittals will be returned to the Contractor with the following notations:
a. Submittals marked "approved" or "accepted" authorize the Contractor to proceed with the work covered.
b. Submittals marked "approved as noted" or "approved, except as noted, resubmittal not required," authorize the Contractor to proceed with the work covered provided the Contractor takes no exception to the corrections.
c. Submittals marked "not approved" or "disapproved," or "revise and resubmit," indicate noncompliance with the contract requirements or design concept, or that submittal is incomplete. Resubmit with
SECTION 01 33 00 Page 9 appropriate changes. No work shall proceed for this item until resubmittal is approved.
d. Submittals marked "not reviewed" will indicate submittal has been previously reviewed and approved, is not required, does not have evidence of being reviewed and approved by Contractor, or is not complete. A submittal marked "not reviewed" will be returned with an explanation of the reason it is not reviewed. Resubmit submittals returned for lack of review by Contractor or for being incomplete, with appropriate action, coordination, or change.
e. Submittals marked "receipt acknowledged" indicate that submittals have been received by the Government. This applies only to "information-only submittals" as previously defined.
1.4 DISAPPROVED SUBMITTALS
Make corrections required by the Contracting Officer's Representative. If the Contractor considers any correction or notation on the returned submittals to constitute a change to the contract drawings or specifications; notice as required under the FAR clause entitled CHANGES, is to be given to the Contracting Officer.
If changes are necessary to submittals, make such revisions and submission of the submittals in accordance with the procedures above. No item of work requiring a submittal change is to be accomplished until the changed submittals are approved.
1.5 APPROVED SUBMITTALS
The Contracting Officer's approval of submittals is not to be construed as a complete check.
Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the Contractor Quality Control (CQC) requirements of this contract is responsible for.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 33 00 Page 10
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 1 PAGES
Cochetopa Canyon Toilet Replacements
01 32 01 SD-01 Preconstruction Submittals
GInitial Project Schedule
12 60 00 SD-03 Product Data
2.1 GPrecast Toilet Building
3.1 GManufacturer's Product
Specifications and installation instructions
31 00 00 SD-03 Product Data
2.1 GAggregate Base Course
2.2 GBedding Material
SD-07 Certificates
3.7Weight Tickets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SECTION 02 41 00
DEMOLITION
PART 1 GENERAL
Provide all materials and labor necessary to demolish and remove specified items.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.1 PROTECTION OF EXISTING VEGETATION
Take necessary precautions to avoid damage to existing trees and vegetation which might be damaged during demolition or construction.
3.2 HUMAN WASTE DISPOSAL
The contractor shall remove the human waste from the existing toilet buildings prior to demolition. The contractor shall dispose of the human waste according to all federal, state, and local requirements.
3.3 TOILET BUILDING REMOVALS
The entire buildings shall be removed, including the pit which holds the human waste.
3.4 WOOD BOLLARD POSTS
Only remove wood bollards where they are being replaced with boulders.
Wood bollard posts shall be completely removed or cut below existing grade.
3.5 DISPOSAL OF REMOVED MATERIALS
All materials removed, shall become the property of the Contractor and shall be removed from Government property and disposed of in a legal manor.
SECTION 02 41 00 Page 11
SECTION 12 60 00
PRECAST CONCRETE TOILET BUILDING
PART 1 GENERAL
1.1 SCOPE
This specification covers the installation of a precast toilet building as produced by CXT Incorporated.
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-03 Product Data
Precast Toilet Building ; G
Manufacturer's Product Specifications and installation instructions ; G
PART 2 PRODUCTS
2.1 PRECAST TOILET BUILDING
The precast toilet building shall be manufactured by CXT Incorporated.
CXT Incorporated Spokane Industrial Park 3808 North Sullivan Road, Building 7 Spokane, WA 99216 Phone 800-696-5766
2.1.1 MODEL
Location Model
Site 1 Gunnison Right Hand, single vault
Site 6 Gunnison Left Hand, single vault
Site 7 Gunnison Right Hand, single vault
2.1.2 TEXTURES AND COLORS
All toilet buildings shall have the same colors and textures.
SECTION 12 60 00 Page 12
Exterior Location Texture Color
Lower Wall Horizontal Lap Siding nuss brown
Upper Wall Board and Batt siding nuss brown
Roof Simulated Cedar Shake charcoal grey
2.1.3 WALL VENT LOCATION
The wall vent shall be on the rear wall, upon entering the door, for all the toilet buildings.
2.1.4 ADDITIONAL BUILDING REQUIREMENTS
The deadbolt lock shall be vendor supplied with Schlage cylinder #1152.
Privacy Latch and ADA handles on the doors.
Supply (2) 3 roll paper holders, for a total of 6 rolls. Note: (1) 3 roll holder is standard, (2) 3 roll paper holders will require additional coordination with the manufacturer.
Install an owl guard for each vent.
Install unisex signage.
2.2 PRODUCT REQUIREMENTS
The precast toilet building shall meet the following criteria.
2.2.1 Manufacturer Criteria
The manufacturer supplying the precast concrete vault toilet must meet the following:
A. Manufacturer must be ISO 9001 certified.
B. Manufacturing plant must be PCI certified.
C. Manufacturer must provide stamped, engineered drawings prior to acceptance.
D. Manufacturer must show four (4) examples of Sweet Smelling Technology designed precast concrete vault toilet facilities produced, installed, and in use as an example of their ability to perform.
E. Manufacture shall provide a twenty (20) year warranty.
F. UL 752 Bullet Resistance on 4" thick concrete samples.
2.2.2 Design Criteria
2.2.2.1 Roof Snow Load
Vault buildings are designed to withstand a 350 pounds per square foot snow load.
2.2.2.2 Floor Load
Vault buildings are designed to withstand 400 pounds per square foot floor load.
SECTION 12 60 00 Page 13
2.2.2.3 Wind Load
Vault buildings shall withstand the effects of 150 miles per hour (3-second gust) wind exposure C.
2.2.2.4 Earthquake
Vault buildings will withstand the effects of a seismic design category E earthquake.
2.2.2.5 Sweet Smelling Technology (SST)
Vault buildings shall incorporate design aspects of SST as outlined by Briar Cook for the U.S. Forest Service. All wall to floor interior surface seams shall have a minimum 1" radius coving made of high strength grout. The vault shall have a bottom slope of 1" per foot from under the toilet riser out to the outside cleanout area. The vault shall have a 24" diameter (minimum) lightweight manhole cover installed to the rear or side of the building. The manhole cover should be raised, with the surrounding concrete sloped away using a minimum slope of ½" per foot. The depth of the vault shall be no deeper than 4½' to 5'. A 12" diameter round pipe will be installed to vent the vault and the pipe shall be raised a minimum of 3' above the highest point of the roof. Vent pipe shall be straight up from the vault. There shall be only one vent opening in the building.
2.2.2.6 Additional Design Standards
Single vault buildings shall be an all concrete design with a minimum 7/12 roof pitch. Vault buildings shall have a minimum 4" wall, 4½" roof, and 5" floor thickness. Vault buildings shall have a one-piece floor unit to prevent panels that migrate in different directions during periods of freeze/thaw stress. Vault buildings shall have a one-piece full length and width vault unit to support the building, screen area, and snow loads evenly.
2.2.2.7 Concrete - Colored
The roof panels, building walls, and screen panels shall be colored concrete. Color shall match the existing concrete toilet building on site.
2.2.2.8 Doors - Steel
Doors are flush panel type 1¾" thick, minimum 16-gauge galvanized steel, top painted with DTM ALKYD.
Door frames are knockdown or welded type, single rabbet, minimum 16-gauge prime coated steel top painted with DTM ALKYD, width to suit wall thickness. Three (3) rubber door silencers are provided on latch side of frame. Three hinges (3) per door with dull chrome plating 4½" x 4½", adjustable tension, and automatic closing for each door. Dome style doorstop stop meeting ANSI 156.16. Provide door sweep at the bottom of door with an adjustable brush.
2.2.2.9 Grab Bars
Grab ars shall be 18-gauge, type 304 stainless steel with 1½" clearance.
Able to withstand 300-pound top loading.
SECTION 12 60 00 Page 14
2.2.2.10 Riser
Riser shall meet ADA standards, be constructed of molded one-piece HDPE polyethylene, and have a smooth surface and have high impact resistance at extremely cold temperatures.
2.2.2.11 Toilet Paper Dispenser
Toilet Paper Dispenser shall be constructed of ¼" thick, type 304 stainless steel, hold three (3) standard rolls of toilet paper.
Fastening system able to withstand 300-pound top loading.
2.2.2.12 Polyethylene Vault Liner
Polyethylene Vault Liner shall be made of a Roto molded 8460 polyethylene. Hold up to 1,000 gallons of waste. Minimum thickness .100.
2.3 CONTRACTOR PROPOSED SUBSITUTIONS
Contractor proposed substitutions to the precast toilet building specified shall be submitted with the bid. If proposed substitution doesn't meet the specifications, the bid will not be considered. If a bid is submitted without a proposed substitution, then the contractor shall install the precast toilet building specified.
PART 3 EXECUTION
3.1 INSTALLATION
Install the precast toilet building in accordance with the manufacturer's product specifications. The entire manufacturer's specification will be incorporated, including the excavation, elevation, backfill, compaction, and material requirements. A sand or aggregate bedding material shall be installed. Submit the manufacturer's product specifications and installation instructions , which will supplement this specification section.
3.1.1 Finish Floor Elevation and Slope
The finish floor elevation will be provided by the BLM. The contractor shall install the precast toilet building within 0.05 feet of the elevation provided. The precast toilet building shall be sloped between 1% and 1.5% to allow water to drain out of the interior of the building, through the door.
3.1.2 Backfill and Compaction
Backfill and compact in accordance with the manufacturer's product specifications. In addition to the compaction specified in the manufacturer's product specifications:
Backfill adjacent to the precast toilet building shall be placed in 8 inch, maximum, lifts and compacted with a whacker-type mechanical tamper or equivalent.
SECTION 12 60 00 Page 15
SECTION 31 00 00
EARTHWORK
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Aggregate Base Course ; G
Bedding Material ; G
SD-07 Certificates
Weight Tickets
PART 2 PRODUCTS
2.1 AGGREGATE BASE COURSE
Aggregate base course shall meet the requirements of Colorado Department of Transportation Standard Specifications for Road and Bridge Construction 2019, section 703 AGGREGATES. Aggregate base course gradation shall meet the gradation shown in Table 703-2, Class 6.
2.2 BEDDING MATERIAL
Bedding material shall be sand or a ¾" top size, well graded aggregate.
Submit the bedding material for approval.
PART 3 EXECUTION
3.1 UNDERGROUND UTILITIES
The Contractor is responsible for locating underground utilities prior to construction. The Government is not aware of any underground utilities, however the Contractor shall verify the presence or absence prior to construction.
3.2 PROTECTION OF EXISTING TREES - SITE 7
The contractor shall protect existing trees from damage during demolition and installation of the toilets.
3.3 TOILET REPLACEMENT LOCATION
The site 1 and site 6 toilet buildings shall be placed in the same location as the existing toilet buildings.
Site 7 toilet may be shifted to the north in order to prevent damage to existing trees. Exact location of the site 7 toilet shall be approved by
SECTION 31 00 00 Page 16 the Contracting Officer's Representative.
3.4 GENERAL EXCAVATION
Perform excavation of every type of material encountered to the lines, grades, and elevations indicated and as specified. During construction, perform excavation and fill in a manner and sequence that will provide proper drainage at all times.
3.4.1 Differing Site Condition - Excavation
The contractor must try to excavate with a hydraulic excavator, in good working condition and with a minimum power rating of 150 horsepower, before a modification under the differing site conditions clause will be allowed.
If excavation cannot be completed with a hydraulic excavator, with a minimum power rating of 150 horsepower, then the Contractor and the Contracting Officer will agree on alternate methods of excavation, and modify the contract. Alternate methods of excavation include, but are not limited to; larger equipment, rock hammers, rock drills, and blasting.
3.5 BEDDING MATERIAL - PRECAST TOILET BUILDING
A sand or aggregate bedding material shall be provided for the precast toilet buildings.
3.6 SITE GRADING
The finish floor elevation of the toilets shall match the existing toilet finish floor elevations.
3.7 AGGREGATE BASE COURSE
Aggregate base course shall be placed adjacent to the precast concrete toilet building, and along existing roads, and as directed by the Contracting Officer's Representative. Do not place aggregate base course until the placement location has been approved by the Contracting Officer's Representative. Moisture condition and compact until a firm solid surface is achieved. Submit weight tickets for payment.
3.7.1 SITE 6 AGGREGATE PLACEMENT
Place aggregate to make a smooth transition from highway 114 to the parking area. Moisture condition and compact until a firm solid surface is achieved.
3.8 BOULDERS - SITE 6
Relocate the existing boulders at site 6. Space the boulders along the parking area, where the bollards are located, 5 to 6 feet apart.
3.9 DEMOLITION OF SITE 6 BOLLARDS
Only demolish and remove wood bollards when they can be replaced with on site boulders. Do not demolish more wood bollards than can be replaced with on site boulders.
SECTION 31 00 00 Page 17
SECTION 31 00 00 Page 18
| PUBLISH.pdf |
| PROJECT TABLE OF CONTENTS |
| DIVISION 01 - GENERAL REQUIREMENTS |
| 01 11 00 - SUMMARY OF WORK |
| PART 1 GENERAL |
| 1.1 PROJECT DESCRIPTION |
| 1.2 LOCATION |
| 1.3 WORK SCHEDULE |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 01 20 00 - PRICE AND PAYMENT PROCEDURES |
| PART 1 GENERAL |
| 1.1 MOBILIZATION AND DEMOBILIZATION |
| 1.1.1 Payment |
| 1.1.2 Unit of Measure |
| 1.2 SITE 1 - DEMOLITION |
| 1.2.1 Payment |
| 1.2.2 Unit of Measure |
| 1.3 SITE 1 - PRECAST TOILET BUILDING |
| 1.3.1 Payment |
| 1.3.2 Unit of Measure |
| 1.4 SITE 1 - AGGREGATE |
| 1.4.1 Payment |
| 1.4.2 Unit of Measure |
| 1.5 SITE 6 - DEMOLITION |
| 1.5.1 Payment |
| 1.5.2 Unit of Measure |
| 1.6 SITE 6 - PRECAST TOILET BUILDING |
| 1.6.1 Payment |
| 1.6.2 Unit of Measure |
| 1.7 SITE 6 - AGGREGATE |
| 1.7.1 Payment |
| 1.7.2 Unit of Measure |
| 1.8 SITE 6 - EXISTING BOULDER PLACEMENT |
| 1.8.1 Payment |
| 1.8.2 Unit of Measure |
| 1.9 SITE 7 - DEMOLITION |
| 1.9.1 Payment |
| 1.9.2 Unit of Measure |
| 1.10 SITE 7 - PRECAST TOILET BUILDING |
| 1.10.1 Payment |
| 1.10.2 Unit of Measure |
| 1.11 SITE 7 - AGGREGATE |
| 1.11.1 Payment |
| 1.11.2 Unit of Measure |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 01 32 01 - PROJECT SCHEDULE |
| PART 1 GENERAL |
| 1.1 SUBMITTALS |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 GENERAL REQUIREMENTS |
| 3.2 PROJECT SCHEDULE DETAILED REQUIREMENTS |
| 3.2.1 Level of Detail Required |
| 3.2.2 Mandatory Tasks |
| 3.2.3 Government Activities |
| 3.3 WEEKLY PROGRESS MEETINGS |
| 3.4 FAILURE TO ACHIEVE PROGRESS |
| 3.4.1 Failure to Perform |
| 3.4.2 Recovery Schedule |
| 01 33 00 - SUBMITTAL PROCEDURES |
| PART 1 GENERAL |
| 1.1 SUBMITTALS |
| 1.2 INFORMATION ONLY SUBMITTALS |
| 1.3 GOVERNMENT APPROVING AUTHORITY |
| 1.3.1 Review Notations |
| 1.4 DISAPPROVED SUBMITTALS |
| 1.5 APPROVED SUBMITTALS |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| DIVISION 02 - EXISTING CONDITIONS |
| 02 41 00 - DEMOLITION |
| PART 1 GENERAL |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 PROTECTION OF EXISTING VEGETATION |
| 3.2 HUMAN WASTE DISPOSAL |
| 3.3 TOILET BUILDING REMOVALS |
| 3.4 WOOD BOLLARD POSTS |
| 3.5 DISPOSAL OF REMOVED MATERIALS |
| DIVISION 12 - FURNISHINGS |
| 12 60 00 - PRECAST CONCRETE TOILET BUILDING |
| PART 1 GENERAL |
| 1.1 SCOPE |
| 1.2 SUBMITTALS |
| PART 2 PRODUCTS |
| 2.1 PRECAST TOILET BUILDING |
| 2.1.1 MODEL |
| 2.1.2 TEXTURES AND COLORS |
| 2.1.3 WALL VENT LOCATION |
| 2.1.4 ADDITIONAL BUILDING REQUIREMENTS |
| 2.2 PRODUCT REQUIREMENTS |
| 2.2.1 Manufacturer Criteria |
| 2.2.2 Design Criteria |
| 2.2.2.1 Roof Snow Load |
| 2.2.2.2 Floor Load |
| 2.2.2.3 Wind Load |
| 2.2.2.4 Earthquake |
| 2.2.2.5 Sweet Smelling Technology SST |
| 2.2.2.6 Additional Design Standards |
| 2.2.2.7 Concrete - Colored |
| 2.2.2.8 Doors - Steel |
| 2.2.2.9 Grab Bars |
| 2.2.2.10 Riser |
| 2.2.2.11 Toilet Paper Dispenser |
| 2.2.2.12 Polyethylene Vault Liner |
2.3 CONTRACTOR PROPOSED SUBSITUTIONS
| PART 3 EXECUTION |
| 3.1 INSTALLATION |
| 3.1.1 Finish Floor Elevation and Slope |
| 3.1.2 Backfill and Compaction |
| DIVISION 31 - EARTHWORK |
| 31 00 00 - EARTHWORK |
| PART 1 GENERAL |
| 1.1 SUBMITTALS |
| PART 2 PRODUCTS |
| 2.1 AGGREGATE BASE COURSE |
| 2.2 BEDDING MATERIAL |
| PART 3 EXECUTION |
| 3.1 UNDERGROUND UTILITIES |
| 3.2 PROTECTION OF EXISTING TREES - SITE 7 |
| 3.3 TOILET REPLACEMENT LOCATION |
| 3.4 GENERAL EXCAVATION |
| 3.4.1 Differing Site Condition - Excavation |
| 3.5 BEDDING MATERIAL - PRECAST TOILET BUILDING |
| 3.6 SITE GRADING |
| 3.7 AGGREGATE BASE COURSE |
| 3.7.1 SITE 6 AGGREGATE PLACEMENT |
| 3.8 BOULDERS - SITE 6 |
| 3.9 DEMOLITION OF SITE 6 BOLLARDS |
File details come from the government source that posted it. Updated .