Bismarck Jamestown No. 2 230kV Transmission Line Stink Lake Reroute North Dakota
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 89503423BWA000039
- Agency
-
Western Area Power Administration
Department of Energy
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237130 Power and Communication Line and Related Structures Construction
- Place of performance
- Medina, North Dakota 58467, United States
Notice details come from SAM.gov. Updated .
About this opportunity
Western Area Power Administration seeks to contract for transmission line construction services involving the demolition of approximately 1.32 miles and rebuilding of 1.55 miles of a 230-kV line between Bismarck and Jamestown, North Dakota. The agency will provide materials such as steel poles, conductor wire, and overhead ground wire. The interim completion date for the reroute portion is June 15, 2023, with all demolition to be finished within 365 days of notice to proceed. The solicitation will issue on January 27, 2023, with bids due on February 28, 2023. The opportunity is designated for small businesses with estimated values between $500,000 and $1,000,000.
This opportunity is designated as a total small business set-aside. The NAICS code is 237130 for power and communication line and related structures construction. The PSC code is R408 for electric power transmission. The award value is estimated between $500,000 and $1,000,000, to be issued under Federal Acquisition Regulation guidelines. Responsible small businesses may submit bids to be considered for this work, which includes demolishing 1.32 miles and rebuilding 1.55 miles of transmission line by specified interim and final completion dates.
Notice text
Western Area Power Administration has a requirement for a contractor to provide all labor, materials other than Government-furnished materials, equipment, transportation and other resources to complete the construction of Bismarck – Jamestown No. 2 230-kV Transmission Line – Stink Lake Reroute, North Dakota.
The principal components of the work involve demolition of approximately 1.32 miles of 230-kV transmission line, rebuilding 1.55 miles of new 230-kV transmission line with Government-furnished steel poles, Government-furnished 954 kcmil, ASCR, 45/7, “Rail” conductor and Government-furnished 1/2-inch overhead ground wire.
The estimated construction magnitude of this project is between $500,000 and $1,000,000. There is an interim completion date to complete the reroute by June 15, 2023 with the remainder of the demolition work to be completed within 365 days from receipt of Notice to Proceed. All responsible small business concerns may submit a bid which shall be considered by this Agency. This solicitation will be issued on or about January 27, 2023, and the projected bid opening date is February 28, 2023.
Construction Change Order Definitization Notice
https://www.wapa.gov/DoingBusiness/SmallBusiness/Pages/small-business.aspx
Files
| File | Type | Posted |
|---|---|---|
| BS-JT2 Synopsis.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Bismarck Jamestown No. 2 230KV T Line Reroute | Award Notice | |
| Bismarck Jamestown No. 2 230KV T Line Reroute | Solicitation | |
| This notice | Pre-Solicitation |