This document outlines a federal contract opportunity for transmission line construction services. Western Area Power Administration is seeking a contractor to demolish approximately 1.32 miles and rebuild 1.55 miles of a 230-kV transmission line between Bismarck and Jamestown, North Dakota. The agency will provide steel poles, conductor wire, and overhead ground wire for the project. The estimated value is between $500,000 and $1,000,000. An interim completion date of June 15, 2023 is specified for the reroute work, with all demolition to be finished within 365 days of notice to proceed. The solicitation will be issued on January 27, 2023, and bids are due on February 28, 2023. All responsible small businesses are eligible to respond. The opportunity is designated for small business set-aside and will be conducted according to Federal Acquisition Regulation guidelines.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Western Area Power Administration has a requirement for a contractor to provide all labor, materials other than Government-furnished materials, equipment, transportation and other resources to complete the construction of Bismarck – Jamestown No. 2 230-kV Transmission Line – Stink Lake Reroute, North Dakota.

The principal components of the work involve demolition of approximately 1.32 miles of 230-kV transmission line, rebuilding 1.55 miles of new 230-kV transmission line with Government-furnished steel poles, Government-furnished 954 kcmil, ASCR, 45/7, “Rail” conductor and Government-furnished 1/2-inch overhead ground wire.

The estimated construction magnitude of this project is between $500,000 and $1,000,000. There is an interim completion date to complete the reroute by June 15, 2023 with the remainder of the demolition work to be completed within 365 days from receipt of Notice to Proceed. All responsible small business concerns may submit a bid which shall be considered by this Agency. This solicitation will be issued on or about January 27, 2023, and the projected bid opening date is February 28, 2023.

Construction Change Order Definitization Notice https://www.wapa.gov/DoingBusiness/SmallBusiness/Pages/small-business.aspx https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.wapa.gov%2FDoingBusiness%2FSmallBusiness%2FPages%2Fsmall-business.aspx&data=05%7C01%7C%7C54ac82b26b1741eb694708dada24f97b%7C31ae220fb94f463a9cfd15bbc9909df5%7C0%7C0%7C638062149609902671%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=taWcrO68C%2FdBWovpfFkNKkCiO1ogJPgVTJ3A58YPsbk%3D&reserved=0