Bishop Campgrounds' Water Systems Great American Outdoor Act (GAOA)
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 140L1225R0001
- Agency
-
California Region
Bureau of Land Management, Department of the Interior
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237110 Water and Sewer Line and Related Structures Construction
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Bureau of Land Management (BLM), Bishop Field Office is seeking to replace and modernize the drinking water systems at three campgrounds located in Inyo and Mono Counties, California. The required work includes replacing the solar panels and support structure, and epoxy lining of the existing storage tanks. The period of performance is 60 days, estimated to begin in Summer 2025. The BLM will issue a Total Small Business Set-Aside competitive solicitation in November 2024, with a single firm fixed price award anticipated. The magnitude of the requirement is between $250,000 and $500,000, under NAICS code 237110 Water and Sewer Line and Related Structures Construction, with a $45.0 million small business size standard. All offerors must register in the System for Award Management (SAM) and are highly encouraged to attend the scheduled site visit.
There is no set-aside designation for this opportunity, which indicates it is open to both small and large businesses. The incumbent or current contractor is not specified. The award value range is between $250,000 and $500,000, and the period of performance is 60 days, estimated to begin in Summer 2025.
Notice text
Bishop Campgrounds' Water Systems Great American Outdoor Act (GAOA)
Files
| File | Type | Posted |
|---|---|---|
| B01_RFP_Synopsis_Pre-Solicitation_Notice_Attachment_140L1225R0001_1.docx | DOCX document |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Bishop Campgrounds' Water Systems Great American Outdoor Act (GAOA) | Award Notice | |
| Bishop Campgrounds' Water Systems Great American O | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| 4 GAOA Flaming Gorge Water System Buckboard in Ashley NF, Wyoming | Forest Service | Total Small Business | |
| LB Lateral Water Line and Facilities Replacement for Wastewater System | — | No set-aside | |
| Bassie spring improvement project | Nevada Region | Total Small Business | |
| GAOA Grizzly Bear Campground | Region 2 - Rocky Mountain Region | Total Small Business | |
| YOSE 22866 Rehabilitate Hodgdon Meadows Water System and YOSE 196755 Extend Hod | — | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity