Beale AFB Utility Well #9

Closed Pre-Solicitation Posted

A newer solicitation was posted. See the latest solicitation from .

Solicitation number
FA468623C1134784-Well09_SS
Agency
Air Combat Command Air Force, Department of Defense
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
237110 Water and Sewer Line and Related Structures Construction
PSC
Y1NE Construction Of Water Supply Facilities
Place of performance
Beale AFB, California 95903, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This pre-solicitation notice from the Department of the Air Force Air Combat Command seeks a contractor to design and install a new water well system at Beale Air Force Base to replace Utility Well #9. The selected contractor must provide all necessary design, labor, materials, equipment, permits, testing, and disposal services for drilling a new well, installing a pump and control system, modifying piping, installing fencing, and decommissioning the existing well. Responses are due by January 9, 2024.

There is no set-aside designation for this procurement. The work involves NAICS code 238910 for site preparation contractors and PSC code C111 for construction of structures and facilities. The solicitation number is FA468623C1134784-Well09_SS. The contractor must drill a well capable of 1,200 gallons per minute and install all associated infrastructure to provide a reliable water source for the Base.

Notice text

Beale AFB requests interest for installing new water well systems. This notice is for market research purposes only and no bids will me accepted at this time. 

Major Work Elements

The Contractor shall furnish all design, labor, supervision, transportation, materials, testing, analysis, reports, permits, specifically air quality authority to construct permit, hauling, tools, and equipment to accomplish all the work involved as necessary to conduct replacement of well #9 :

1. Repair by Replace Water Well #9

  • Contractor shall drill and install new water well, pump, and control system with industry standard casing to a sufficient depth capable of maintaining flow of 1,200 gallons per minute (GPM) to the existing drinking water supply piping network. Well installation shall be completed by a State of California C-57 licensed drilling contractor.
  • Contractor shall provide new concrete pad estimated to be 6 feet by 10 feet and raised to 24 inches above grade to conform to 100-year flood standards.
  • Contractor shall furnish new downhole water level sensing equipment to be connected to Siemens automated system.
  • Well shall conform to all local, state, regional and federal requirements for a community drinking water supply well, including sanitary/annular to a required depth, not less than 50ft.

2. Electrical

  • The well system will be powered by existing electrical transformer power (3 phase 480V).  Existing electrical power is provided by a pole mounted transformer.  A current project is removing the overhead power and replacing it with an underground duct bank and pad mounted transformer.  This project will connect to whatever is existing at the time of well installation.
  • Contractor shall provide new 75 horsepower submersible well pump, wiring, Pump controller (VFD) and associated parts and equipment.
  • Upgrade existing water flow meter with new water flow meter.

3. Plumbing

  • Modify existing piping as required to connect with new well.  All piping shall meet appropriate code requirements and at a minimum shall match existing systems.
  • Contractor shall provide new gate valve for water supply piping and flush piping.

4. Fencing

  • Contractor shall remove existing fencing around well piping and foundation, saving fence caps for re-use with barbed wiring. Contractor shall install new chain link fencing with barbed wire topping around new well and associated piping.

5. Well Decommission

  • Contractor shall provide well destruction plan to decommission the existing well to satisfy Yuba County permit requirements.
  • Proper abandonment and sealing of existing Well #9 in accordance with local, state, regional and federal requirements.

6. Disposal 

  • The Contractor shall coordinate with 9CES Environmental staff to determine proper disposal requirements for materials, which may include on-base recycling, hazardous waste disposal, or non-hazardous waste offsite disposal. It shall remain the responsibility of the Contractor to haul and dispose of removed materials identified for offsite disposal. All fees to dispose material offsite shall be the responsibility of the Contractor. The Contractor shall contact 9CES Hazardous Waste Program Manager for proper disposal details and required coordination and documentation references. Coordination shall also be made with 9CES Environmental regarding recycling.

Attachments

Files attached to this notice, newest first
File Type Posted
Site Map-W9.pptx PPTX presentation

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Replace Utility Well #9 Beale AFB Latest solicitation Solicitation
Beale AFB Utility Well #9 Solicitation
Beale AFB Utility Well #9 This notice · Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity