Barkley Transformer Installation

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W912P520B0004
Agency
ENDIST Nashville US Army Corps of Engineers, Department of Defense
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
237130 Power and Communication Line and Related Structures Construction
PSC
6120 Transformers: Distribution And Power Station
Place of performance
Kuttawa Ky Usa

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers, Nashville District is soliciting a firm fixed-price construction contract to remove two existing power transformers and install two new GSU transformers at the Barkley Power Plant in Kuttawa, Kentucky. The contractor will remove existing transformers and arresters, construct concrete secondary containments and foundations, and install two 161kV/13.2kV transformers rated at 37,500/75,000kVA with associated equipment. Additional requirements include draining and removing oil storage tanks potentially contaminated with PCBs. The period of performance is 12 months. A mandatory virtual site visit will be held on April 30, 2020, with site visit requests due by April 27 to the specified Contract Specialist. Questions regarding this solicitation must be submitted to the same Contract Specialist by the same date.

There is no set-aside designation. The NAICS code is 237130 and PSC code is R499. The estimated value is between $1,000,000 to $5,000,000 to be performed over 12 months at the Barkley Power Plant location in Kuttawa, Kentucky. Two existing transformers will be removed and replaced with two new 161kV/13.2kV GSU transformers rated at 37,500/75,000kVA each with associated equipment including arresters, insulators, and wiring to be installed.

Notice text

3 versions

Update #3 · Latest ·

The U.S. Army Corps of Engineers (USACE), Nashville District, anticipates soliciting a requirement for a firm fixed price construction contract to install two (2) GSU power transformers at the Barkley Power Plant, Kuttawa, KY. The principal components of the work to be performed include removal of the two (2) existing transformers and arresters, construction of two (2) concrete secondary containments and transformer foundations to grade, and installation of two (2) GSU transformers rated 161 kV GrdY/13.2 kV Delta, 37,500/75,000 kVA, Class ONAN/ONAF cooling, high-voltage arresters, high-voltage insulators, medium voltage tubular bus system, medium-voltage insulators, potential transformers, current transformers, and associated wiring. The work will also include draining oil potentially contaminated with PCBs from existing clean and dirty transformer oil tanks and removal of the transformer oil storage tanks. The anticipated period of performance is 12 months after date of award. The estimated magnitude of this project is between $1,000,000 and $5,000,000.

Due to the social distancing guidelines provided by the Centers for Disease Control and Prevention (CDC)
because of COVID-19, a site visit will be a video conference presentation that will be held on Thursday,
April 30, 2020 at 9:00 a.m. Central Time.

In order to participate in the virtual site visit, contractors must submit a site visit request form for each
company representative. Site visit request forms can be found at www.beta.sam.gov under the Attachments
section of this solicitation. Companies with foreign national representatives must submit a Foreign National
Site Vist Request Form, which can found at www.beta.sam.gov under the Attachments section of this
solicitation. All site visit request forms, including site visit request forms for foreign nationals, must be
submitted by Monday, April 27, 2020 at 3:00 p.m. Central Time to Contract Specialist Kristal Jones at
Kristal.R.Jones@usace.army.mil.

Upon approval of submited site visit request forms, contractors will receive via e-mail the site visit agenda,
which will include teleconference and Defense Visual Information Distribution Service (DVIDS) access
information, and photograpghs prior to the site visit.

Questions regarding this procurement action can be submitted via e-mail to Kristal Jones at Kristal.R.Jones@usace.army.mil.

20 May 2020:  This notice is being updated to post Amendment 0001 of the solicitation. Please note: Contractors who are going to be submitting bids  for this project must refer to the solicitation for instructions on how to submit their bids via SAFE. Contractors must  submit a request for an access code at least 5 days before the bid opening due date. The request  can be sent via e-mail to Kristal Jones at Kristal.R.Jones@usace.army.mil.

2 June 2020: This notice is being updated to post the bid abstract. The bid opening was held on 2 June 2020 at 10:00 a.m. Central Time.

Update #2 ·

The U.S. Army Corps of Engineers (USACE), Nashville District, anticipates soliciting a requirement for a firm fixed price construction contract to install two (2) GSU power transformers at the Barkley Power Plant, Kuttawa, KY. The principal components of the work to be performed include removal of the two (2) existing transformers and arresters, construction of two (2) concrete secondary containments and transformer foundations to grade, and installation of two (2) GSU transformers rated 161 kV GrdY/13.2 kV Delta, 37,500/75,000 kVA, Class ONAN/ONAF cooling, high-voltage arresters, high-voltage insulators, medium voltage tubular bus system, medium-voltage insulators, potential transformers, current transformers, and associated wiring. The work will also include draining oil potentially contaminated with PCBs from existing clean and dirty transformer oil tanks and removal of the transformer oil storage tanks. The anticipated period of performance is 12 months after date of award. The estimated magnitude of this project is between $1,000,000 and $5,000,000.

Due to the social distancing guidelines provided by the Centers for Disease Control and Prevention (CDC)
because of COVID-19, a site visit will be a video conference presentation that will be held on Thursday,
April 30, 2020 at 9:00 a.m. Central Time.

In order to participate in the virtual site visit, contractors must submit a site visit request form for each
company representative. Site visit request forms can be found at www.beta.sam.gov under the Attachments
section of this solicitation. Companies with foreign national representatives must submit a Foreign National
Site Vist Request Form, which can found at www.beta.sam.gov under the Attachments section of this
solicitation. All site visit request forms, including site visit request forms for foreign nationals, must be
submitted by Monday, April 27, 2020 at 3:00 p.m. Central Time to Contract Specialist Kristal Jones at
Kristal.R.Jones@usace.army.mil.

Upon approval of submited site visit request forms, contractors will receive via e-mail the site visit agenda,
which will include teleconference and Defense Visual Information Distribution Service (DVIDS) access
information, and photograpghs prior to the site visit.

Questions regarding this procurement action can be submitted via e-mail to Kristal Jones at Kristal.R.Jones@usace.army.mil.

20 May 2020:  This notice is being updated to post Amendment 0001 of the solicitation. Please note: Contractors who are going to be submitting bids  for this project must refer to the solicitation for instructions on how to submit their bids via SAFE. Contractors must  submit a request for an access code at least 5 days before the bid opening due date. The request  can be sent via e-mail to Kristal Jones at Kristal.R.Jones@usace.army.mil.

Update #1 ·

The U.S. Army Corps of Engineers (USACE), Nashville District, anticipates soliciting a requirement for a firm fixed price construction contract to install two (2) GSU power transformers at the Barkley Power Plant, Kuttawa, KY. The principal components of the work to be performed include removal of the two (2) existing transformers and arresters, construction of two (2) concrete secondary containments and transformer foundations to grade, and installation of two (2) GSU transformers rated 161 kV GrdY/13.2 kV Delta, 37,500/75,000 kVA, Class ONAN/ONAF cooling, high-voltage arresters, high-voltage insulators, medium voltage tubular bus system, medium-voltage insulators, potential transformers, current transformers, and associated wiring. The work will also include draining oil potentially contaminated with PCBs from existing clean and dirty transformer oil tanks and removal of the transformer oil storage tanks. The anticipated period of performance is 12 months after date of award. The estimated magnitude of this project is between $1,000,000 and $5,000,000.

Due to the social distancing guidelines provided by the Centers for Disease Control and Prevention (CDC)
because of COVID-19, a site visit will be a video conference presentation that will be held on Thursday,
April 30, 2020 at 9:00 a.m. Central Time.

In order to participate in the virtual site visit, contractors must submit a site visit request form for each
company representative. Site visit request forms can be found at www.beta.sam.gov under the Attachments
section of this solicitation. Companies with foreign national representatives must submit a Foreign National
Site Vist Request Form, which can found at www.beta.sam.gov under the Attachments section of this
solicitation. All site visit request forms, including site visit request forms for foreign nationals, must be
submitted by Monday, April 27, 2020 at 3:00 p.m. Central Time to Contract Specialist Kristal Jones at
Kristal.R.Jones@usace.army.mil.

Upon approval of submited site visit request forms, contractors will receive via e-mail the site visit agenda,
which will include teleconference and Defense Visual Information Distribution Service (DVIDS) access
information, and photograpghs prior to the site visit.

Questions regarding this procurement action can be submitted via e-mail to Kristal Jones at Kristal.R.Jones@usace.army.mil.

Attachments

Files attached to this notice, newest first
File Type Posted
W912P520B0004 Bid Abstract page2.pdf PDF
W912P520B0004 Bid Abstract page1.pdf PDF
W912P520B00040001 Amendment.pdf PDF
20B0004 Amend0001 E-201.pdf PDF
20B0004 Amend0001 89493-61-70.pdf PDF
W912P520B0004 Amend0001 Revised TSpecs.pdf PDF
20B0004 Amend0001 583E464 GE Outline Drawing.pdf PDF
20B0004 Amend0001 G-002 Index.pdf PDF
20B0004 Amend0001 150-020-T-427-00.pdf PDF
20B0004 Amend0001 POC750_0800S.pdf PDF
W912P520B0004 RTA TSpecs.pdf PDF
W912P520B0004 RTA TPlans.pdf PDF
W912P520B0004 final.pdf PDF
Show all 13

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Barkley Transformer Installation Award Award Notice
Barkley Transformer Installation This notice · Latest solicitation Solicitation
Barkley Transformer Installation Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity