Barkley Dam Spillway Gate Maintenance Platforms

Closed Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
W912P521Q0007
Agency
ENDIST Nashville US Army Corps of Engineers, Department of Defense
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
332312 Fabricated Structural Metal Manufacturing
PSC
9640 Iron And Steel Primary And Semifinished Products
Place of performance
Grand Rivers KY 42045 USA

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

***********************AMENDMENT 0002 ***************************************************************************************************

W912P521Q0007 - Barkley Spillway Gate Chain Maintenance Platforms

The purpose of this amendment is to:1. Answer questions received from potential vendors;2. Modified sections 01 00 00 Section 1.2 ; 05 50 15 Section 3.1 to Technical Specifications, to address delivery; 3. Correct Specification Section 05 50 15, Section 2.1.5 clarifications on swing gates question; 4. Update FAR clause 52.252-31

***********************AMENDMENT 0001 ***************************************************************************************************

W912P521Q0007 - Barkley Spillway Gate Chain Maintenance Platforms

This solicitation is being amended to extend the quote due date to allow the Government time to answer questions received during the question period. The quote due date is extended from Monday, 08 February 2021 at 11:00 a.m. Central Time to Friday, 12 February 2021 at 11:00 a.m. Central Time. FAR clause 52.252-3 has been updated.

End. ****************************************************************************************************************************************

This work consists of furnishing all equipment, labor, and materials  and transportation required for the fabrication and delivery of  new Barkley Spillway Gate Chain Maintenance Platforms as described in the Technical specification and drawings.  The platforms will be comprised of steel angles, plates, channels, and bars. The floor of the platforms will be hot dipped galvanized as referenced in the Technical Specification (2.2.5.1). Guardrail will be incorporated on each of the platforms and will be comprised of steel bars and angles. The platforms will include vertical steel channels that extend upward from the platform that will be used to permanently suspend the platforms from existing structures at the dam site, as referenced in the Technical Specification. After fabrication, the structures are required to be hot dipped galvanized in accordance with ASTM A123. The contractor will deliver twenty-four (24) steel maintenance platforms to Barkley Lock located in Grand Rivers, KY. The platforms will be offloaded by the Government. No installation work is required, or allowed, in this contract. Refer to the accompanying specification for a full list of requirements.

Update #2 ·

***********************AMENDMENT 0001 ***************************************************************************************************

W912P521Q0007 - Barkley Spillway Gate Chain Maintenance Platforms

This solicitation is being amended to extend the quote due date to allow the Government time to answer questions received during the question period. The quote due date is extended from Monday, 08 February 2021 at 11:00 a.m. Central Time to Friday, 12 February 2021 at 11:00 a.m. Central Time. FAR clause 52.252-3 has been updated.

End. ****************************************************************************************************************************************

This work consists of furnishing all equipment, labor, and materials  and transportation required for the fabrication and delivery of  new Barkley Spillway Gate Chain Maintenance Platforms as described in the Technical specification and drawings.  The platforms will be comprised of steel angles, plates, channels, and bars. The floor of the platforms will be hot dipped galvanized as referenced in the Technical Specification (2.2.5.1). Guardrail will be incorporated on each of the platforms and will be comprised of steel bars and angles. The platforms will include vertical steel channels that extend upward from the platform that will be used to permanently suspend the platforms from existing structures at the dam site, as referenced in the Technical Specification. After fabrication, the structures are required to be hot dipped galvanized in accordance with ASTM A123. The contractor will deliver twenty-four (24) steel maintenance platforms to Barkley Lock located in Grand Rivers, KY. The platforms will be offloaded by the Government. No installation work is required, or allowed, in this contract. Refer to the accompanying specification for a full list of requirements.

Update #1 ·

This work consists of furnishing all equipment, labor, and materials  and transportation required for the fabrication and delivery of  new Barkley Spillway Gate Chain Maintenance Platforms as described in the Technical specification and drawings.  The platforms will be comprised of steel angles, plates, channels, and bars. The floor of the platforms will be hot dipped galvanized as referenced in the Technical Specification (2.2.5.1). Guardrail will be incorporated on each of the platforms and will be comprised of steel bars and angles. The platforms will include vertical steel channels that extend upward from the platform that will be used to permanently suspend the platforms from existing structures at the dam site, as referenced in the Technical Specification. After fabrication, the structures are required to be hot dipped galvanized in accordance with ASTM A123. The contractor will deliver twenty-four (24) steel maintenance platforms to Barkley Lock located in Grand Rivers, KY. The platforms will be offloaded by the Government. No installation work is required, or allowed, in this contract. Refer to the accompanying specification for a full list of requirements.

Attachments

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Barkley Dam Spillway Gate Maintenance Platforms Award Award Notice
Barkley Dam Spillway Gate Maintenance Platforms Latest solicitation Solicitation
Barkley Dam Spillway Gate Maintenance Platforms This notice Solicitation
Barkley Dam Spillway Gate Maintenance Platforms Pre-Solicitation
Barkley Dam Spillway Gate Maintenance Platforms Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity