Barkley Dam Spillway Gate Maintenance Platforms
Closed Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- W912P521Q0007
- Agency
- ENDIST Nashville US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 332312 Fabricated Structural Metal Manufacturing
- Place of performance
- Grand Rivers KY 42045 USA
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
***********************AMENDMENT 0002 ***************************************************************************************************
W912P521Q0007 - Barkley Spillway Gate Chain Maintenance Platforms
The purpose of this amendment is to:1. Answer questions received from potential vendors;2. Modified sections 01 00 00 Section 1.2 ; 05 50 15 Section 3.1 to Technical Specifications, to address delivery; 3. Correct Specification Section 05 50 15, Section 2.1.5 clarifications on swing gates question; 4. Update FAR clause 52.252-31
***********************AMENDMENT 0001 ***************************************************************************************************
W912P521Q0007 - Barkley Spillway Gate Chain Maintenance Platforms
This solicitation is being amended to extend the quote due date to allow the Government time to answer questions received during the question period. The quote due date is extended from Monday, 08 February 2021 at 11:00 a.m. Central Time to Friday, 12 February 2021 at 11:00 a.m. Central Time. FAR clause 52.252-3 has been updated.
End. ****************************************************************************************************************************************
This work consists of furnishing all equipment, labor, and materials and transportation required for the fabrication and delivery of new Barkley Spillway Gate Chain Maintenance Platforms as described in the Technical specification and drawings. The platforms will be comprised of steel angles, plates, channels, and bars. The floor of the platforms will be hot dipped galvanized as referenced in the Technical Specification (2.2.5.1). Guardrail will be incorporated on each of the platforms and will be comprised of steel bars and angles. The platforms will include vertical steel channels that extend upward from the platform that will be used to permanently suspend the platforms from existing structures at the dam site, as referenced in the Technical Specification. After fabrication, the structures are required to be hot dipped galvanized in accordance with ASTM A123. The contractor will deliver twenty-four (24) steel maintenance platforms to Barkley Lock located in Grand Rivers, KY. The platforms will be offloaded by the Government. No installation work is required, or allowed, in this contract. Refer to the accompanying specification for a full list of requirements.
Update #2 ·
***********************AMENDMENT 0001 ***************************************************************************************************
W912P521Q0007 - Barkley Spillway Gate Chain Maintenance Platforms
This solicitation is being amended to extend the quote due date to allow the Government time to answer questions received during the question period. The quote due date is extended from Monday, 08 February 2021 at 11:00 a.m. Central Time to Friday, 12 February 2021 at 11:00 a.m. Central Time. FAR clause 52.252-3 has been updated.
End. ****************************************************************************************************************************************
This work consists of furnishing all equipment, labor, and materials and transportation required for the fabrication and delivery of new Barkley Spillway Gate Chain Maintenance Platforms as described in the Technical specification and drawings. The platforms will be comprised of steel angles, plates, channels, and bars. The floor of the platforms will be hot dipped galvanized as referenced in the Technical Specification (2.2.5.1). Guardrail will be incorporated on each of the platforms and will be comprised of steel bars and angles. The platforms will include vertical steel channels that extend upward from the platform that will be used to permanently suspend the platforms from existing structures at the dam site, as referenced in the Technical Specification. After fabrication, the structures are required to be hot dipped galvanized in accordance with ASTM A123. The contractor will deliver twenty-four (24) steel maintenance platforms to Barkley Lock located in Grand Rivers, KY. The platforms will be offloaded by the Government. No installation work is required, or allowed, in this contract. Refer to the accompanying specification for a full list of requirements.
Update #1 ·
This work consists of furnishing all equipment, labor, and materials and transportation required for the fabrication and delivery of new Barkley Spillway Gate Chain Maintenance Platforms as described in the Technical specification and drawings. The platforms will be comprised of steel angles, plates, channels, and bars. The floor of the platforms will be hot dipped galvanized as referenced in the Technical Specification (2.2.5.1). Guardrail will be incorporated on each of the platforms and will be comprised of steel bars and angles. The platforms will include vertical steel channels that extend upward from the platform that will be used to permanently suspend the platforms from existing structures at the dam site, as referenced in the Technical Specification. After fabrication, the structures are required to be hot dipped galvanized in accordance with ASTM A123. The contractor will deliver twenty-four (24) steel maintenance platforms to Barkley Lock located in Grand Rivers, KY. The platforms will be offloaded by the Government. No installation work is required, or allowed, in this contract. Refer to the accompanying specification for a full list of requirements.
Attachments
Notice history
| Notice | Type | Posted |
|---|---|---|
| Barkley Dam Spillway Gate Maintenance Platforms | Award Notice | |
| Barkley Dam Spillway Gate Maintenance Platforms | Solicitation | |
| Barkley Dam Spillway Gate Maintenance Platforms | Solicitation | |
| Barkley Dam Spillway Gate Maintenance Platforms | Pre-Solicitation | |
| Barkley Dam Spillway Gate Maintenance Platforms | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity