Barge/vessel and crane services needed for the ins

Closed Solicitation Posted

Solicitation number
1305M226Q0018
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Notice details come from SAM.gov. Updated .

About this opportunity

The National Oceanic and Atmospheric Administration (NOAA) is soliciting vessel and crane services to support the installation of a new elevated platform at the New Canal NWLON (National Water Level Observation Network) station in New Orleans, Louisiana. The contractor must provide a vessel equipped with a crane capable of lifting a 1.5-ton aluminum frame, along with necessary crew to remove existing equipment and install new infrastructure at the tide station. Key requirements include coordination with the Army Corps of Engineers, compliance with environmental and safety regulations, and completion of work within a compressed timeline of less than two 8-hour work days between February 1 and April 30, 2026. NOAA will evaluate proposals using a Lowest Price Technically Acceptable (LPTA) methodology, assessing technical capabilities (in-house resources and subcontracting approach) and past performance (documentation of 1-3 similar projects completed within the last three years with contractor references). Critical deadlines include site visit completion by December 31, 2025, written questions due by January 5, 2026, and proposal submissions due by 11:00 AM Eastern on January 9, 2026, with anticipated contract award on or about January 16, 2026.

This solicitation is a 100% small business set-aside under NAICS code 488390 (Other Support Activities for Water Transportation) with a $47 million size standard, designated for Women-Owned Small Businesses (WOSB). No incumbent contractor is identified in the solicitation documents. The contract will be awarded as a firm-fixed-price agreement, with the specific award value not publicly disclosed in the solicitation materials. The work scope encompasses removal of the existing aluminum frame, electronics enclosure, lower platform, and ladders, followed by installation of a new aluminum frame and electronics enclosure on a concrete pier. The Department of Labor Wage Determination 2015-5189 applies to this contract, establishing prevailing wage rates for Louisiana parishes including Jefferson, Orleans, Plaquemines, Saint John The Baptist, St. Bernard, and St. Charles. Performance will take place at the New Canal Lighthouse NOAA tide station located at 8001 Lakeshore Drive, New Orleans, Louisiana 70124.

Notice text

Barge/vessel and crane services needed for the installation of the New Canal NWLON station elevated platform.

Files

File Type Posted
2__SOW_1305M226Q0018.pdf PDF
Sol_1305M226Q0018.pdf PDF
1__RFQ_1305M226Q0018.pdf PDF
4__SCA_WD___2015-5189.pdf PDF
3__Contractor_Past_Performance_Reference_Sheet.pdf PDF

Similar open opportunities

Opportunity Agency Set-aside Responses due
NOAA Ships- Oil Containment Boom Services NAICS 488310 National Oceanic and Atmospheric Administration Total Small Business
Sonar gondola detailed design and fabrication South Carolina 29401, United States · NAICS 336611 National Oceanic and Atmospheric Administration No set-aside
Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No. 5-2026 (OM26005) Plaquemine, Louisiana, United States · NAICS 237990 ENDIST New Orleans No set-aside
Mississippi River, New Orleans Harbor and Various Bar Channels Cutterhead Dredge No. 5-2025 New Orleans, Louisiana, United States · NAICS 237990 ENDIST New Orleans No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity