Ballast Suction Header Piping Ultrasonic Testing & Temporary Repair
Open Solicitation Posted
- Solicitation number
- N6817127QN014
- Agency
-
Naval Supply Systems Command
Department of the Navy, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 336611 Ship Building and Repairing
- PSC
- J998 Non-Nuclear Ship Repair (East)
- Place of performance
- Spain
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Navy's Naval Supply Systems Command seeks ballast suction header piping ultrasonic testing and temporary repair aboard USS Lewis B. Puller (ESB 3), with quotations due December 2, 2026 at 11:00 a.m. Central European Time. No set-aside is used, and the award is Lowest Priced Technically Acceptable.
NAVSUP Fleet Logistics Center Sigonella issues the RFQ in support of the ship. Place of performance is Malaga, Spain, with performance from December 9 to 12, 2026. Requests for references and enclosures are due November 30, 2026. The work is designated DX-rated under the Defense Priorities and Allocations System. NAICS is 336611, Ship Building and Repairing, and PSC is J998, Non-Nuclear Ship Repair (East).
Scope covers 150 ultrasonic thickness readings on a 36-inch header and 24-inch spool piece in the ballast water pump room (Location 5-57-0), using a 6-inch grid on accessible areas. Areas showing 75% or greater diminution require a three-inch grid until diminution reaches 50% or less. Temporary repair depends on UT results and will be either an approximately 8mm fiberglass composite wrap or a 0.375-inch steel plate doubler measuring 24 by 18 inches. The PWS names Rodator Composites as a suggested fiberglass wrap source. Ships force performs the operational pressure test, and the crew furnishes paint.
Technical requirements include UT technicians who are ABS External Specialists or ASME Code-qualified, ABS-certified welders current under AWS D1.1, and a certified Marine Chemist (or equivalent OCONUS certified professional) providing daily gas-free certificates before confined space entry and hot work. Dye penetrant testing applies to root and final welds, and ABS must witness and approve pump room fit-up and welding. The Quality Control Plan must provide 24/7 access to a contractor QC representative, plus qualified inspector lists, coatings and NDT certifications, and welding procedures. Quoters must be registered in SAM and complete Section K representations and certifications, including SF 18 and SF 30.
Pricing is firm fixed price in U.S. dollars on the J-1 worksheet, covering man-hours, labor rates, labor totals, materials, subcontractor costs, and other costs. Evaluation rates technical capability as acceptable or unacceptable, and price is evaluated. Quotations are submitted electronically to Antonella De Fraia Frangipane at Antonella.defraiafrangipane.ln@us.navy.mil.
Notice text
Ballast Suction Header Piping Ultrasonic Testing & Temporary Repair
Files
| File | Type | Posted |
|---|---|---|
| Solicitation - N6817127QN014.pdf | ||
| J-2 Performance Work Statement.pdf | ||
| J-1 Contractor Price Breakdown.xlsx | XLSX spreadsheet |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity