B8142 replace HVAC split system
Awarded Award Notice Posted
- Solicitation number
- N4008016Q3025
- Agency
- Naval Facilities Engineering Command Department of the Navy, Department of Defense
- Awarded
- to C.V. Carlson Company, Inc.
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- N4008016P3025 Federal contract award
- NAICS code
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
Added: May 03, 2016 3:43 pm
Modified: Jul 26, 2016 1:59 pmTrack Changes
Detailed Description. Replace the existing DX air-cooled split system that serves the storage area of
Elec/Comm Sys Integ. Lab with floor plan dimensions about 60ft x 16.5ft and ceiling height 12.5ft. New
Replace HVAC Split System
SPECIFICATIONS AND CONDITIONS
indoor unit shall be overhung underneath the wood deck and above stock shelves. New disconnect of the
new outdoor DX air-cooled condenser shall be installed on exterior surface of the wall at the same
location as before. New indoor disconnect shall be mounted to the same location of the previous one and
hooked up to the new indoor air handler. Hook up existing condensate drain pipe to the new, indoor,
overhung air handler. Run new refrigerant line from indoor unit to outdoor unit thru the existing
penetration on the wall.
Hook up existing thermostat to the new split system for space temperature
control.
Indoor temperature set-points of occupied mode shall be 78oF for cooling mode and 68oF for heating
mode. For unoccupied mode, temperature set-point shall be reset 85oF for cooling and 55oF for heating.
2.1. *Contractor will coordinate with the PW POC prior to commencement of work to ensure all
scheduling and access issues have been worked out properly. Any questions will be directed to the
PW POC and not through the customer.
2.1.1. Demolition
2.1.1.1. Electrical
Demolish the outdoor wall-mounted disconnect and indoor, overhung disconnect and
wiring to the existing outdoor DX condenser and indoor air handler.
Existing indoor
thermostat shall remain in place.
2.1.1.2. Mechanical
Demolish the existing split system that serves the storage of Elec/Comm Sys Integ. Lab
including outdoor DX air-cooled condenser, an indoor air handler that was overhung
underneath the wood deck and above stock shelves, and refrigerant lines. Existing supply
ductwork shall remain in place.
2.1.2. Install
Install a new complete usable split DX system that serves the storage area under new
design conditions specified above.
2.1.2.1. Electrical
Install new NEC disconnect for the new outdoor unit on the exterior wall at the same
location as before. Install new NEC disconnect for the new indoor air handler. Hook up
power to new outdoor DX air-cooled condenser and new indoor air handler.
All wiring
shall comply with local and national code. Wire the existing thermostat to the indoor unit
and the outdoor unit. Thermostat shall be mounted on the partition wall of the two
storages. Provide outdoor thermostat and wiring to outdoor unit if required. New
equipment shall be 230V, 3phase, and 60Hz. Make sure power available adequate to feed
new equipment.
2.1.2.2. Mechanical
Install new complete usable brand-new split system that comprises of an outdoor DX aircooled
condenser and an indoor overhung air handling unit that shall be mounted
underneath wood deck and above stock shelves. Outdoor unit can be a DX air-cooled
condenser to provide cooling only in combination with indoor unit that has electric heater
to provide electric heating.
Outdoor unit can be a DX air-cooled heat pump condenser in
combination with indoor unit that has an electric heater to provide supplement heating.
Heating capacity of heat pump drops when outdoor temperature drops. When indoor
Replace HVAC Split System
heating demand rises, electric supplement heating is necessary. Two-stage heating is
preferred for electric heater for better temperature control. Mount new outdoor DX aircooled
condenser on the existing concrete slab. Be sure to provide enough clearance
around the condenser according manufacturer installation instruction when installing the
outdoor DX air-cooled condenser. Install new refrigerant lines (liquid line and vapor line)
from indoor unit to outdoor unit.
Liquid line shall have filter dryer and moisture indicator
sight glass. Vapor line shall be insulated per manufacturer instruction. New indoor unit
shall have prefilter with filtering efficiency MERV-8 or higher. Hook up new indoor air
handler to existing supply ductwork. Clean ductwork before installing AHU to it. Provide
transition duct if necessary. All new ductwork added to this job shall be galvanized steel
reinforced per SMACNA. New HVAC equipment shall be energy star certified. The
cooling and heating capacity of the new HVAC equipment shall be comparable to that of
the existing: 5 ton for cooling and 65MBH for heating. See referenced information of the
existing equipment in 2.1.2.4.
2.1.2.3.
Submittals
Provide submittal for HVAC split system including an outdoor DX air-cooled condenser
on slab and an indoor air handling unit including electrical information, disconnects, and
outdoor thermostat if required. The new DX split system shall provide adequate cooling
and heating capacity to the space. Make sure power supply to the new system matches
with existing unitsâ requirements.
2.1.2.4. Referenced Information:
Existing Outdoor Unit:
Make: Carrier
Model: 38BQ006410
Serial: P03004
Cooling Capacity: 58,000Btuh
Heating Capacity: 65,000Btuh
Existing Indoor Unit:
Make: Carrier
Model: 28HQ060000
Serial: N041373
Refrigerant: R22
Cooling Capacity: 60,000Btuh
Notes: Refrigerant R-22 wonât be allowed to use in this job.
Information above shall be field verified by contractor for accuracy.
Verify existing feed power available adequate for new equipment.
Update #1 ·
Added: May 03, 2016 3:43 pm
Provide all material, equipment, labor, and supervision to replace the HVAC split system at building 8142. Building 8142 is located in Webster Field Annex of NAS Patuxent River. The DX split system that serves the storage of Elec/Comm Sys Integ. Lab, has reached the final years of its life and is no longer working and is required to be replaced. It comprises of an outdoor DX air-cooled
heat pump condenser on a concrete slab and an overhung, indoor air handler in the storage area.
Replace the existing DX air-cooled split system that serves the storage area of Elec/Comm Sys Integ. Lab with floor plan dimensions about 60ft x 16.5ft and ceiling height 12.5ft. New indoor unit shall be overhung underneath the wood deck and above stock shelves. New disconnect of the
new outdoor DX air-cooled condenser shall be installed on exterior surface of the wall at the same location as before. New indoor disconnect shall be mounted to the same location of the previous one and hooked up to the new indoor air handler. Hook up existing condensate drain pipe to the new, indoor,overhung air handler. Run new refrigerant line from indoor unit to outdoor unit thru the existing penetration on the wall. Hook up existing thermostat to the new split system for space temperature
control.
Attachments
| File | Type | Posted |
|---|---|---|
| N40080-16-Q-3025_-_AMENDMENT_0002.pdf | ||
| N40080-16-Q-3025_-_AMENDMENT_0001.pdf | ||
| PRE-PROPOSAL_MEETING_AGENDA_AND_ATTENDANCE_ROSTER.pdf | ||
| Contractor_Access_Form.doc | DOC document | |
| N40080-16-Q-3025_SOLICITATION.pdf |