B66048 Repair Secure Conference Room, Kirtland AFB, Bernalillo County, New Mexico
Award Notice Posted
- Solicitation number
- W912PP18Q0019
- Agency
-
ENDIST Albuquerque
US Army Corps of Engineers, Department of Defense
- Awarded
- to Weil Construction Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W912PP18P0012 Federal contract award
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
a. Demolition
General
1. The Contractor shall remove existing doors, frames, and hardware as shown on the drawings. All removed material will be salvaged to the Facility Manager.
2. The Contractor shall remove all existing duplex receptacles electrical wire, communication wire, local area network wire, light switch wire, and all other recessed box wire as required and prepare for surface reinstallation as shown on the drawings.
3. The Contractor shall remove the light fixtures in both stairwells and repair for reinstallation of new fixtures and surface mounted conduit.
4. The Contractor shall remove all abandoned and unused alarm system panels and associated items as shown on the drawings.
Room 244
1. The Contractor shall remove all existing duplex receptacles electrical wire, communication wire, local area network wire, light switch wire, and all other recessed box wire as required and prepare for surface reinstallation as shown on the drawings.
2. The Contractor shall remove portions of the ceiling grid and tiles to access the wall areas extending above the grid. Prep areas for new work.
3. The Contractor shall remove the existing recessed projection screens, store and protect for reinstallation.
b. Construction
General
1. The Contractor shall foam the existing electrical conduits abandoned in place and patch, texture, and paint the wall to match over the electrical box as shown in the drawings.
2. The Contractor shall re-install and surface mount all removed LAN/Comm receptacles to the same locations as shown on the drawings.
3. The Contractor shall provide and install additional layers of gypsum drywall, tape, texture, and paint to match as shown on the drawings.
4. The Contractor shall install new STC rated doors, frames, and hardware as shown on the drawings. All doors and frames shall comply with applicable door security notes.
5. The Contractor shall reinstall all ceiling grids and tiles removed to access the work areas as shown on the drawings.
6. The Contractor shall construct, install, and or provide all other items not listed in this SOW but shown on the drawings.
7. The Contractor shall install new LED light fixtures in both stairwells as shown on the drawings. All electrical supply wire shall be run in surface mounted conduits and the wall patched and painted to match existing.
8. The Contractor shall patch and paint all disturbed areas where removal of wall mounted components was required.
Room 244
1. The Contractor shall provide and install additional layers of gypsum drywall, tape, texture, and paint to match as shown on the drawings.
2. The Contractor shall provide new metal stud framing as needed along with additional layers of gypsum drywall as required to the roof deck as shown on the drawings.
3. The Contractor shall install new STC rated doors, frames, and hardware as shown on the drawings. All doors and frames shall comply with applicable door security notes.
4. Then Contractor shall reinstall the existing projection screens as shown on the drawings.
5. The Contractor shall construct, install, and or provide all other items not listed in this SOW but shown on the drawings.