AZ NP GRCA 272(1) Mather Point Campground Loops

Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
6982AF22B000017
Agency
Federal Highway Administration Department of Transportation
Responses due
Not on record
Set-aside
HUBZone

Opportunity facts

NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Y1LB Construction Of Highways, Roads, Streets, Bridges, And Railways
Place of performance
Grand Canyon, Arizona, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This notice is for the rehabilitation of approximately 2.37 miles of campground roads and parking stalls at the Mather Point Campground within Grand Canyon National Park. The Department of Transportation Federal Highway Administration is seeking to rehabilitate the existing pavement, which is in poor condition with roadway cracking and aggregate surfacing showing deterioration typical of aging pavements. The work will be conducted in schedules and options, with an estimated cost range between $2-5 million. The anticipated notice to proceed is August 2022 with construction intended for completion in November 2022.

This project is set aside for HUBZone small businesses. Principal work items include roadway aggregate, full depth reclamation, and asphalt concrete pavement. Road closures are permitted with 7 days notice and only one loop can be closed at a time unless authorized. Weekend work on roads will not be allowed after June 1st, though weekend work for periods of light visitation may be requested through that date with 3 days notice.

Notice text

THIS IS NOT A REQUEST FOR BID, PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.

THIS PROJECT IS BEING ADVERTISED AS A HUB-ZONE SET ASIDE.

PROJECT NUMBER:  AZ NP GRCA 272(1)

PROJECT NAME:  Mather Point Campground Loops

PROJECT DESCRIPTION:  The AZ NP GRCA 272(1), Mather Point Campground Loops project is located in Grand Canyon Village approximately 22 miles west of the Grand Canyon East Entrance in Coconino County, AZ. The project is proposing to rehabilitate (3R) campground roads and campsite parking stalls at the Mather Point Campground within the South Rim of the Grand Canyon National Park. The project is broken up into one schedule with two options, described below.

SCOPE OF THE WORK:  The project is proposing to rehabilitate (3R) approximately 2.37 miles of campground roads along with several campsite parking stalls. The roads and parking stalls need rehabilitation due to deterioration that is typical of aging pavements. The existing pavement within the Mather Point Campground is paved and in poor condition with roadway cracking and aggregate surfacing.

Schedule A work for this project includes Juniper Loops 1 & 2, Maple Loop, and Oak Loops 1 & 2, for an approximate length of 1.51 miles. Option Y includes Pine Loop for an approximate length of 0.47 miles. Option Z includes Sage Loops 1, 2, 3, & 4 for an approximate length of 0.39 miles.

PRINCIPAL WORK ITEMS:

Schedule A:

  • 30202-2000 Roadway Aggregate, Method 2: 1,200 TON
  • 30402-1000 Full Depth Reclamation, Method 1: 25,000 SQYD
  • 40301-0100 Asphalt Concrete Pavement, Type 1: 5,500 TON

Option Y:

  • 30202-2000 Roadway Aggregate, Method 2: 350 TON
  • 30402-1000 Full Depth Reclamation, Method 1: 7,500 SQYD
  • 40301-0100 Asphalt Concrete Pavement, Type 1: 2,000 TON

Option Z:

  • 30202-2000 Roadway Aggregate, Method 2: 210 TON
  • 30402-1000 Full Depth Reclamation, Method 1: 4,600 SQYD
  • 40301-0100 Asphalt Concrete Pavement, Type 1: 1,000 TON

ANTICIPATED SCHEDULE: 

  • Advertisement: May 2022
  • Contract Award: July 2022
  • Notice to Proceed: August 2022
  • Construction Complete: November 2022

ESTIMATED COST RANGE: 

The proposed project is estimated at a cost between $2 million and $5 million.

FUNDING SOURCE:  Park Service Interagency Agreement

MISCELLANEOUS:

  • Roadway closures are permitted with 7 days advance notice, and each loop will be closed sequentially. Only one loop can be closed at a time, unless otherwise allowed by the CO and the NPS.
  • The mainline road and all other loops will remain open during construction of each loop.
  • Weekend work on roads will not be allowed after June 1, 2022. Weekend work may be requested for periods of light visitation through June 1, 2022. Request the allowance of weekend operations at least 3 days in advance to schedule inspection services. Requests with less than 3 days of notice may be disallowed.

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
AZ NP GRCA 272(1) Mather Point Campground Loops Award Award Notice
AZ NP GRCA 272(1) Mather Point Campground Loops Latest solicitation Solicitation
AZ NP GRCA 272(1) Mather Point Campground Loops This notice Pre-Solicitation
AZ NP GRCA 272(1) Mather Point Campground Loops Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity