AZ BL COLO 7528(1) Burro Creek Road
Closed Pre-Solicitation Posted
Not the latest version. See the latest solicitation from .
- Solicitation number
- 6982AF27B000002
- Agency
-
Federal Highway Administration
Department of Transportation
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Kingman, Arizona 86401, United States
- Points of contact
-
- Laura Slauter cflcontracts@dot.gov (202) 366-4000
Notice details come from SAM.gov. Updated .
About this opportunity
The Federal Highway Administration intends to solicit a small business set-aside contract for resurfacing, restoration, and rehabilitation of Burro Creek Road in Mohave County, Arizona, with a pre-solicitation response deadline of September 30, 2026.
The project spans 1.3 miles of roadway beginning at the bridge over Burro Creek and ending at a cattle guard near US Highway 93 intersection, located 71 miles southwest of Kingman in rolling terrain with elevations between 1,885 and 2,255 feet. Work comprises pavement rehabilitation using full-depth reclamation and asphalt concrete pavement with fog seals and tack coats; drainage improvements including cross-culvert installation, headwall reconstruction, ditch grading, bank stabilization, flared end sections, and riprap aprons; earthwork and stabilization involving embankment benching, slope stabilization, slope scaling, and bridge approach repairs at the eastern abutment to address undercutting; and safety and traffic control items including regulatory and warning signs, pavement markings, and boulder placement to control public access. The contract structure includes a base Schedule A for primary roadway rehabilitation and an Option X addressing bridge sedimentation repairs and bridge approach undercutting. The objective is to improve access to Burro Creek Campground facilities, reduce maintenance costs and erosion, and enhance sediment control, drainage, and safety.
This is a total small business set-aside. Plan and specifications are not yet available.
Notice text
THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE
Small Business Set-Aside
PROJECT NUMBER:AZ FLAP PIM FR510(1)
PROJECT NAME:Burro Creek Road
PROJECT DESCRIPTION:
Burro Creek Road is located in Mohave County, 71 miles southwest of Kingman, Arizona. The project is located in rolling terrain, with elevations along this section ranging from approximately 1,885 to 2,255 feet. The project begins at the bridge over Burro Creek and ends at the cattle guard near the intersection with US Hwy 93. The project's length is approximately 1.3 miles.
SCOPE OF THE WORK:
The proposed of this resurfacing, restoration, and rehabilitation (3R) project is to improve access to the camping and day use areas at the Burro Creek Campground, reduce maintenance costs and erosion, improve sediment control, drainage and safety. The scope of work for this project includes the following major construction activities and items:
- Pavement Rehabilitation: 1.3 miles of roadway resurfacing incorporating Full Depth Reclamation (FDR) and Asphalt Concrete Pavement, along with applicable fog seals and tack coats.
- Drainage Improvements: Installation of cross culverts and reconstruction of an existing headwall. Additional drainage work includes ditch grading and reconditioning, berms, bank stabilization, and the addition of flared end sections and riprap aprons throughout the project.
- Earthwork & Stabilization: Embankment benching, slope stabilization, slope scaling, and specific bridge approach repairs at the eastern abutment to resolve undercutting concerns
- Safety & Traffic Control Items: Installation of new regulatory and warning signs, pavement markings and the placement of boulders to control public access at specific locations throughout the project.
The project is structured with a base Schedule A encompassing the primary roadway rehabilitation, and an Option X which includes work associated with repairing bridge sedimentation, addressing undercutting at the bridge approaches, and boulder placement.
PRINCIPAL WORK ITEMS:
Roadway Aggregate: 1,600 TONS
Ditch Reconditioning: 2,000 LNFT
Full Depth Reclamation: 1.3 MILE
Asphalt Concrete Pavement: 3,600 TON
18-Inch Pipe Culvert: 100 LNFT
24-Inch Pipe Culvert: 175 LNFT
Boulder: 100 EACH
ANTICIPATED SCHEDULE:
Advertisement – October 2026
Award-January - 2027
Construction – January 2027 through October 2027
ESTIMATED COST RANGE:
Between $2,000,000 and $5,000,000
Notice history
| Notice | Type | Posted |
|---|---|---|
| AZ BL COLO 7528(1) Burro Creek Road | Solicitation | |
| This notice | Pre-Solicitation | |
| AZ BL COLO 7528(1) Burro Creek Road | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| UT NP ARCH 100(2) Bridges on Delicate Arch Road | Federal Highway Administration | No set-aside | |
| ND NP THRO 204(1) Buck Hill Road | Federal Highway Administration | No set-aside | |
| Jake Rocks Road Reconstruction | Forest Service | Total Small Business | |
| Northeast Region Pavement and Bridge Preservation Construction - NP NER PMS BMS FY24(1) | Federal Highway Administration | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity