Array Group Driver Integration and Testing
Closed Pre-Solicitation Posted
- Solicitation number
- FA8723-24-R-9002
- Agency
-
AFLCMC Peterson AFB
Lifecycle Management Center, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 334511 Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing
- PSC
- 5840 Radar Equipment, Except Airborne
- Place of performance
- Colorado Springs, Colorado 80914, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Array Group Driver Integration and Testing project will integrate and test seven newly purchased AGD cabinets with a previously qualified design at three Upgraded Early Warning Radar sites for the Department of the Air Force Materiel Command Lifecycle Management Center. The contractor will be responsible for installation, integration, testing, software updates, training site personnel, and disposition of legacy equipment over a one year period of performance as outlined in the attached Performance Work Statement. Interested parties are requested to provide capability statements by March 14th addressing their experience, facilities, past performance, and commercial offerings.
There is no set-aside designation for this opportunity. The NAICS code is 334511 for Search, Detection, Navigation, Guidance, Aeronautical and Nautical System and Instrument Manufacturing. The Space Force intends to award a sole source task order to Raytheon Technologies for the integration and testing work. Key deliverables under the Contract Data Requirements List include monthly program management and expenditure reports, site visit work plans, test plans and reports, and facility documents due between 6 months prior to 3 months after completion of cabinet installation at the three radar sites.
Notice text
The Array Group Driver (AGD) Integration and Testing (AGD I&T) project will integrate and test seven newly purchased AGD cabinets with a previously qualified design which is a Form, Fit, Function, Interface (F3I) replacement plus critical spares for refurbished cabinets for Upgraded Early Warning Radars (UEWR). This AGD I&T project will integrate/test seven replacement AGD cabinets at three UEWRs at Thule Radar Site (THL), Royal Air Force (RAF) Fylingdales (FYL), and Clear Space Force Station (CLR).
Files
| File | Type | Posted |
|---|---|---|
| 1. FY24 AGD PWS.pdf | ||
| AGD IT Sources Sought Synopsis.pdf | ||
| 2. Exh_A_FY24 AGD CDRL Supplemental Instructions with CDRLs.pdf |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Digital Backplane Assembly | Air Force | No set-aside | |
| Primary radar anten | Naval Supply Systems Command | No set-aside | |
| Receive Microwave (And Associated Power Supplies) | Air Force | No set-aside | |
| Radio Frequency Calibration Backplane Assembly (RFCBA) | Air Force | No set-aside | |
| P-8A Australian APY-10 Radar Regional Repair Facility | Naval Air Systems Command | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity