Army Installation Kits (IK) Production
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- HC108419R0015
- Agency
-
Defense Information Systems Agency
Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 334111 Electronic Computer Manufacturing
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks proposals for an indefinite delivery indefinite quantity contract to produce U.S. Army Installation Kits, cables, and brackets. The Defense Information Systems Agency will award the contract using lowest priced technically acceptable evaluation criteria. The selected contractor must design, develop, produce, modify, and deliver installation kits in accordance with provided Level II drawing packages to support systems managed by Project Manager Mission Command. The contractor must also supply engineering services to create new kits and modify existing kits. Proposals are due by July 31, 2019. Questions regarding the requirement must be submitted by July 10, 2019.
There is no set-aside designation. The NAICS code is 334110 and PSC code is J019. The contractor shall produce installation kits at a rate of 1,500 per month with a surge capacity of 5,000 kits per month, and shall also supply 1,000 spares per month. The period of performance is a three year base period and seven one-year option periods. Production and delivery will occur at the contractor's facility.
Notice text
3 versions
Update #3 · Latest ·
The purpose of RFP Amendment 0002: 1) Extend the RFP closing date to 1:00 PM CT on Friday, October 4, 2019; 2) Provide updated J-3 Pricing Template v6 that removed cost build up columns from the FFP Labor Pricing Page. Fully burdened FFP labor rates should be proposed. Cost build up details are not required.
Note: Offerors are allowed to re-submit their proposals in its entirety and not just the pricing volume. However, if only the pricing volume is received the Government will utilize all previously submitted documents in response to this Solicitation.
All revised attachments are included in the provided pdf file HC108419R0015 Amend 0002.
********************
The purpose of RFP Amendment 0001: 1) Provide answers to industry questions; 2) Extend questions for TDP clarification only to 2:00 PM CT on Wednesday, July 31, 2019; and 3) Extend the RFP closing date to 4:00 PM CT on Monday, August 19, 2019.
This is a combined synopsis/solicitation for the production of U.S. Army, Project Manager Mission Command, Installations Kits (IKs). This effort is Full and Open Competition and will establish an Indefinite Delivery Indefinite Quantity Contract using FAR 15 based on Lowest Priced Technically Acceptable evaluation criteria.
The Contractor shall be required to design, develop, produce, modify and deliver IK, cables, and brackets to support the installation of the PM MC managed systems and related subsystems of PEO C3T. All Contractor provided IKs shall be delivered in accordance with the Level II drawing packages associated with each IK. The associated IK drawing package is supplied as Attachment J-2 - IK Level II Drawing Packages. In addition, the Contractor shall supply engineering services to support the creation of new IKs and for the modification of existing IKs.
There are seven (7) attachments to the RFP: J-1 IK Statement of Work; J-2 IK Level II Drawing Packages (available upon request); J-3 IK Price Template; J-4 Government Furnished Equipment (GFE) (available upon request); J-5 DD Form 1423-1 Contact Data Requirements List (CDRL); J-6 DISA Non-Disclosure Agreement (NDA); J-7 IK Performance Specifications (available upon request).
Questions for this requirement should be submitted via email to sara.a.vogelgesang.civ@mail.mil and kevin.l.poore.civ@mail.mil NLT 4:00 P.M. Central Time on 10 Jul 2019. Proposals are due NLT 4:00 P.M. Central Time on 31 Jul 2019.
Update #2 ·
The purpose of RFP Amendment 0001: 1) Provide answers to industry questions; 2) Extend questions for TDP clarification only to 2:00 PM CT on Wednesday, July 31, 2019; and 3) Extend the RFP closing date to 4:00 PM CT on Monday, August 19, 2019.
This is a combined synopsis/solicitation for the production of U.S. Army, Project Manager Mission Command, Installations Kits (IKs). This effort is Full and Open Competition and will establish an Indefinite Delivery Indefinite Quantity Contract using FAR 15 based on Lowest Priced Technically Acceptable evaluation criteria.
The Contractor shall be required to design, develop, produce, modify and deliver IK, cables, and brackets to support the installation of the PM MC managed systems and related subsystems of PEO C3T. All Contractor provided IKs shall be delivered in accordance with the Level II drawing packages associated with each IK. The associated IK drawing package is supplied as Attachment J-2 - IK Level II Drawing Packages. In addition, the Contractor shall supply engineering services to support the creation of new IKs and for the modification of existing IKs.
There are seven (7) attachments to the RFP: J-1 IK Statement of Work; J-2 IK Level II Drawing Packages (available upon request); J-3 IK Price Template; J-4 Government Furnished Equipment (GFE) (available upon request); J-5 DD Form 1423-1 Contact Data Requirements List (CDRL); J-6 DISA Non-Disclosure Agreement (NDA); J-7 IK Performance Specifications (available upon request).
Questions for this requirement should be submitted via email to sara.a.vogelgesang.civ@mail.mil and kevin.l.poore.civ@mail.mil NLT 4:00 P.M. Central Time on 10 Jul 2019. Proposals are due NLT 4:00 P.M. Central Time on 31 Jul 2019.
Update #1 ·
This is a combined synopsis/solicitation for the production of U.S. Army, Project Manager Mission Command, Installations Kits (IKs). This effort is Full and Open Competition and will establish an Indefinite Delivery Indefinite Quantity Contract using FAR 15 based on Lowest Priced Technically Acceptable evaluation criteria.
The Contractor shall be required to design, develop, produce, modify and deliver IK, cables, and brackets to support the installation of the PM MC managed systems and related subsystems of PEO C3T. All Contractor provided IKs shall be delivered in accordance with the Level II drawing packages associated with each IK. The associated IK drawing package is supplied as Attachment J-2 - IK Level II Drawing Packages. In addition, the Contractor shall supply engineering services to support the creation of new IKs and for the modification of existing IKs.
There are seven (7) attachments to the RFP: J-1 IK Statement of Work; J-2 IK Level II Drawing Packages (available upon request); J-3 IK Price Template; J-4 Government Furnished Equipment (GFE) (available upon request); J-5 DD Form 1423-1 Contact Data Requirements List (CDRL); J-6 DISA Non-Disclosure Agreement (NDA); J-7 IK Performance Specifications (available upon request).
Questions for this requirement should be submitted via email to sara.a.vogelgesang.civ@mail.mill and kevin.l.poore.civ@mail.mil NLT 4:00 P.M. Central Time on 10 Jul 2019. Proposals are due NLT 4:00 P.M. Central Time on 31 Jul 2019.
Files
| File | Type | Posted |
|---|---|---|
| HC108419R0015_Conformed_Copy.pdf | ||
| HC108419R0015_Amend_0002.pdf | ||
| J-3_IK_Price_Template_v6_Amend_0002.xlsx | XLSX spreadsheet | |
| HC108419R0015_Conformed_Copy.pdf | ||
| HC108419R0015_Amend_0001.pdf | ||
| J-6_DISA_Non-Disclosure_Agreement_(NDA).pdf | ||
| HC108419R0015_RFP.docx | DOCX document | |
| J-1_IK_Statement_of_Work.docx | DOCX document | |
| J-3_IK_Price_Template_v4.xlsx | XLSX spreadsheet | |
| J-5_DD_Form_1423-1_Contract_Data_Requirement_List_(CDRL).docx | DOCX document |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Production of U. S. Army Installation Kits (IKs) | Award Notice | |
| This notice | Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Installation kit, vehicular equipment COM | Land and Maritime | No set-aside | |
| Installation kit | Land and Maritime | Total Small Business | |
| Cable assembly, spec | Land and Maritime | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity