Arlington National Cemetery Southern Expansion Phase II - OPS Complex

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W9123622R2022
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation from the Department of the Army Corps of Engineers Engineering District Norfolk seeks construction services for Phase II of the Southern Expansion project at Arlington National Cemetery. Services include building an operations building, warehouse, maintenance building, parking structure, utilities, and landscaping totaling over 90,000 gross square feet. Construction must meet anti-terrorism and accessibility requirements and achieve LEED certification. Proposals are due by November 22, 2022 with anticipated completion in Spring 2026.

There is no set-aside designation. Construction is to take place at Arlington National Cemetery. Projected values were not provided but the scope of facilities to be constructed indicates a sizable contract award.

Notice text

12 versions

Update #12 · Latest ·

11/10/2022 Amendment 0011 posted...........11/08/2022 Amendment 0010 posted..........11/04/2022 Amendment 0009 posted. 11/03/2022 Amendment 0008 Provide a corrected response to the Inquiry# 9956816. To provide technical document changes/additions based on ProjNet questions and answers. *Note: ProjNet Questions and Answers will be added via Amendment closer to Proposal due date. Until then, ProjNet Questions and Answers can be viewed via ProjNet. 10/31/2022 Amendment 0007 10/28/2022- Amendment 0006 10/26/2022- Amendment 0005 Posted. 10/12/2022 - Amendment 0004 Posted. 09/30/2022 - Amendment 0003 Posted. 09/26/2022 - Amendment 0002 Posted. 09/09/2022 - Amendment 0001 Posted. The Southern Expansion project consists of two discrete adjacent construction projects: 1) Phase II Operations Complex and 2) Phase III Cemetery Expansion. For the purpose of this Project, only the Phase II Operations Complex project is to be considered. The Phase III Cemetery Expansion will be awarded under a separate contract at another time. A brief description of work as part of this solicitation is as follows: a. Construction of the Phase II Operations Complex includes an operations building, warehouse building, maintenance building, laydown and storage space, a three-level parking structure (90,000 GSF), landscaping, plantings, an access road to the existing cemetery, and all supporting utilities. Furniture finishes and equipment will be included in the construction contract. LEED Certification of the qualifying buildings is required. b. All facilities must be constructed in accordance with Anti-terrorism/force protection measures and regulation. All construction shall comply with Architectural Barriers Act (ABA) requirements and considerations. Construction within and supporting the program must be of the highest possible quality and workmanship commensurate with ANC?s exacting standards and the intent for construction of a ?forever project.? c. Phase II Operations Complex projected construction completion is anticipated in the Spring of 2026. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123622R2022' to obtain more details.*

Update #11 ·

11/08/2022 Amendment 0010 posted..........11/04/2022 Amendment 0009 posted. 11/03/2022 Amendment 0008 Provide a corrected response to the Inquiry# 9956816. To provide technical document changes/additions based on ProjNet questions and answers. *Note: ProjNet Questions and Answers will be added via Amendment closer to Proposal due date. Until then, ProjNet Questions and Answers can be viewed via ProjNet. 10/31/2022 Amendment 0007 10/28/2022- Amendment 0006 10/26/2022- Amendment 0005 Posted. 10/12/2022 - Amendment 0004 Posted. 09/30/2022 - Amendment 0003 Posted. 09/26/2022 - Amendment 0002 Posted. 09/09/2022 - Amendment 0001 Posted. The Southern Expansion project consists of two discrete adjacent construction projects: 1) Phase II Operations Complex and 2) Phase III Cemetery Expansion. For the purpose of this Project, only the Phase II Operations Complex project is to be considered. The Phase III Cemetery Expansion will be awarded under a separate contract at another time. A brief description of work as part of this solicitation is as follows: a. Construction of the Phase II Operations Complex includes an operations building, warehouse building, maintenance building, laydown and storage space, a three-level parking structure (90,000 GSF), landscaping, plantings, an access road to the existing cemetery, and all supporting utilities. Furniture finishes and equipment will be included in the construction contract. LEED Certification of the qualifying buildings is required. b. All facilities must be constructed in accordance with Anti-terrorism/force protection measures and regulation. All construction shall comply with Architectural Barriers Act (ABA) requirements and considerations. Construction within and supporting the program must be of the highest possible quality and workmanship commensurate with ANC?s exacting standards and the intent for construction of a ?forever project.? c. Phase II Operations Complex projected construction completion is anticipated in the Spring of 2026. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123622R2022' to obtain more details.*

Update #10 ·

11/04/2022 Amendment 0009 posted. 11/03/2022 Amendment 0008 Provide a corrected response to the Inquiry# 9956816. To provide technical document changes/additions based on ProjNet questions and answers. *Note: ProjNet Questions and Answers will be added via Amendment closer to Proposal due date. Until then, ProjNet Questions and Answers can be viewed via ProjNet. 10/31/2022 Amendment 0007 10/28/2022- Amendment 0006 10/26/2022- Amendment 0005 Posted. 10/12/2022 - Amendment 0004 Posted. 09/30/2022 - Amendment 0003 Posted. 09/26/2022 - Amendment 0002 Posted. 09/09/2022 - Amendment 0001 Posted. The Southern Expansion project consists of two discrete adjacent construction projects: 1) Phase II Operations Complex and 2) Phase III Cemetery Expansion. For the purpose of this Project, only the Phase II Operations Complex project is to be considered. The Phase III Cemetery Expansion will be awarded under a separate contract at another time. A brief description of work as part of this solicitation is as follows: a. Construction of the Phase II Operations Complex includes an operations building, warehouse building, maintenance building, laydown and storage space, a three-level parking structure (90,000 GSF), landscaping, plantings, an access road to the existing cemetery, and all supporting utilities. Furniture finishes and equipment will be included in the construction contract. LEED Certification of the qualifying buildings is required. b. All facilities must be constructed in accordance with Anti-terrorism/force protection measures and regulation. All construction shall comply with Architectural Barriers Act (ABA) requirements and considerations. Construction within and supporting the program must be of the highest possible quality and workmanship commensurate with ANC?s exacting standards and the intent for construction of a ?forever project.? c. Phase II Operations Complex projected construction completion is anticipated in the Spring of 2026. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123622R2022' to obtain more details.*

Update #9 ·

11/03/2022 Amendment 0008 Provide a corrected response to the Inquiry# 9956816. To provide technical document changes/additions based on ProjNet questions and answers. *Note: ProjNet Questions and Answers will be added via Amendment closer to Proposal due date. Until then, ProjNet Questions and Answers can be viewed via ProjNet. 10/31/2022 Amendment 0007 10/28/2022- Amendment 0006 10/26/2022- Amendment 0005 Posted. 10/12/2022 - Amendment 0004 Posted. 09/30/2022 - Amendment 0003 Posted. 09/26/2022 - Amendment 0002 Posted. 09/09/2022 - Amendment 0001 Posted. The Southern Expansion project consists of two discrete adjacent construction projects: 1) Phase II Operations Complex and 2) Phase III Cemetery Expansion. For the purpose of this Project, only the Phase II Operations Complex project is to be considered. The Phase III Cemetery Expansion will be awarded under a separate contract at another time. A brief description of work as part of this solicitation is as follows: a. Construction of the Phase II Operations Complex includes an operations building, warehouse building, maintenance building, laydown and storage space, a three-level parking structure (90,000 GSF), landscaping, plantings, an access road to the existing cemetery, and all supporting utilities. Furniture finishes and equipment will be included in the construction contract. LEED Certification of the qualifying buildings is required. b. All facilities must be constructed in accordance with Anti-terrorism/force protection measures and regulation. All construction shall comply with Architectural Barriers Act (ABA) requirements and considerations. Construction within and supporting the program must be of the highest possible quality and workmanship commensurate with ANC?s exacting standards and the intent for construction of a ?forever project.? c. Phase II Operations Complex projected construction completion is anticipated in the Spring of 2026. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123622R2022' to obtain more details.*

Update #8 ·

10/31/2022 Amendment 0007 Clarify response to inquiry 9954058. To provide technical document changes/additions based on ProjNet questions and answers. *Note: ProjNet Questions and Answers will be added via Amendment closer to Proposal due date. Until then, ProjNet Questions and Answers can be viewed via ProjNet. 10/28/2022- Amendment 0006 10/26/2022- Amendment 0005 Posted. 10/12/2022 - Amendment 0004 Posted. 09/30/2022 - Amendment 0003 Posted. 09/26/2022 - Amendment 0002 Posted. 09/09/2022 - Amendment 0001 Posted. The Southern Expansion project consists of two discrete adjacent construction projects: 1) Phase II Operations Complex and 2) Phase III Cemetery Expansion. For the purpose of this Project, only the Phase II Operations Complex project is to be considered. The Phase III Cemetery Expansion will be awarded under a separate contract at another time. A brief description of work as part of this solicitation is as follows: a. Construction of the Phase II Operations Complex includes an operations building, warehouse building, maintenance building, laydown and storage space, a three-level parking structure (90,000 GSF), landscaping, plantings, an access road to the existing cemetery, and all supporting utilities. Furniture finishes and equipment will be included in the construction contract. LEED Certification of the qualifying buildings is required. b. All facilities must be constructed in accordance with Anti-terrorism/force protection measures and regulation. All construction shall comply with Architectural Barriers Act (ABA) requirements and considerations. Construction within and supporting the program must be of the highest possible quality and workmanship commensurate with ANC?s exacting standards and the intent for construction of a ?forever project.? c. Phase II Operations Complex projected construction completion is anticipated in the Spring of 2026. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123622R2022' to obtain more details.*

Update #7 ·

10/28/2022- Amendment 0006 is providing the following: to bifurcate the Proposal due date for Volume I, II and III. The proposal due date for Volume I remains November 8, 2022, at 12:00pm EST. The proposal due date for Volume II and III will be extended to November 22, 2022, at 12:00pm EST. Changes to 52.217-7 .To provide technical document changes/additions. 10/26/2022- Amendment 0005 Posted. 10/12/2022 - Amendment 0004 Posted. 09/30/2022 - Amendment 0003 Posted. 09/26/2022 - Amendment 0002 Posted. 09/09/2022 - Amendment 0001 Posted. The Southern Expansion project consists of two discrete adjacent construction projects: 1) Phase II Operations Complex and 2) Phase III Cemetery Expansion. For the purpose of this Project, only the Phase II Operations Complex project is to be considered. The Phase III Cemetery Expansion will be awarded under a separate contract at another time. A brief description of work as part of this solicitation is as follows: a. Construction of the Phase II Operations Complex includes an operations building, warehouse building, maintenance building, laydown and storage space, a three-level parking structure (90,000 GSF), landscaping, plantings, an access road to the existing cemetery, and all supporting utilities. Furniture finishes and equipment will be included in the construction contract. LEED Certification of the qualifying buildings is required. b. All facilities must be constructed in accordance with Anti-terrorism/force protection measures and regulation. All construction shall comply with Architectural Barriers Act (ABA) requirements and considerations. Construction within and supporting the program must be of the highest possible quality and workmanship commensurate with ANC?s exacting standards and the intent for construction of a ?forever project.? c. Phase II Operations Complex projected construction completion is anticipated in the Spring of 2026. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123622R2022' to obtain more details.*

Update #6 ·

10/26/2022 Amendment 0005 is providing the following: To extend the Proposal due date to November 8, 2022 at 12:00pm EST. 2. To provide technical document changes/additions based on ProjNet questions and answers. *Note: ProjNet Questions and Answers will be added via Amendment closer to Proposal due date. Until then, ProjNet Questions and Answers can be viewed via ProjNet.10/12/2022 - Amendment 0004 Posted. 09/30/2022 - Amendment 0003 Posted. 09/26/2022 - Amendment 0002 Posted. 09/09/2022 - Amendment 0001 Posted. The Southern Expansion project consists of two discrete adjacent construction projects: 1) Phase II Operations Complex and 2) Phase III Cemetery Expansion. For the purpose of this Project, only the Phase II Operations Complex project is to be considered. The Phase III Cemetery Expansion will be awarded under a separate contract at another time. A brief description of work as part of this solicitation is as follows: a. Construction of the Phase II Operations Complex includes an operations building, warehouse building, maintenance building, laydown and storage space, a three-level parking structure (90,000 GSF), landscaping, plantings, an access road to the existing cemetery, and all supporting utilities. Furniture finishes and equipment will be included in the construction contract. LEED Certification of the qualifying buildings is required. b. All facilities must be constructed in accordance with Anti-terrorism/force protection measures and regulation. All construction shall comply with Architectural Barriers Act (ABA) requirements and considerations. Construction within and supporting the program must be of the highest possible quality and workmanship commensurate with ANC?s exacting standards and the intent for construction of a ?forever project.? c. Phase II Operations Complex projected construction completion is anticipated in the Spring of 2026. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123622R2022' to obtain more details.*

Update #5 ·

10/12/2022 - Amendment 0004 Posted. 09/30/2022 - Amendment 0003 Posted. 09/26/2022 - Amendment 0002 Posted. 09/09/2022 - Amendment 0001 Posted. The Southern Expansion project consists of two discrete adjacent construction projects: 1) Phase II Operations Complex and 2) Phase III Cemetery Expansion. For the purpose of this Project, only the Phase II Operations Complex project is to be considered. The Phase III Cemetery Expansion will be awarded under a separate contract at another time. A brief description of work as part of this solicitation is as follows: a. Construction of the Phase II Operations Complex includes an operations building, warehouse building, maintenance building, laydown and storage space, a three-level parking structure (90,000 GSF), landscaping, plantings, an access road to the existing cemetery, and all supporting utilities. Furniture finishes and equipment will be included in the construction contract. LEED Certification of the qualifying buildings is required. b. All facilities must be constructed in accordance with Anti-terrorism/force protection measures and regulation. All construction shall comply with Architectural Barriers Act (ABA) requirements and considerations. Construction within and supporting the program must be of the highest possible quality and workmanship commensurate with ANC?s exacting standards and the intent for construction of a ?forever project.? c. Phase II Operations Complex projected construction completion is anticipated in the Spring of 2026. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123622R2022' to obtain more details.*

Update #4 ·

09/30/2022 - Amendment 0003 Posted. 09/26/2022 - Amendment 0002 Posted. 09/09/2022 - Amendment 0001 Posted. The Southern Expansion project consists of two discrete adjacent construction projects: 1) Phase II Operations Complex and 2) Phase III Cemetery Expansion. For the purpose of this Project, only the Phase II Operations Complex project is to be considered. The Phase III Cemetery Expansion will be awarded under a separate contract at another time. A brief description of work as part of this solicitation is as follows: a. Construction of the Phase II Operations Complex includes an operations building, warehouse building, maintenance building, laydown and storage space, a three-level parking structure (90,000 GSF), landscaping, plantings, an access road to the existing cemetery, and all supporting utilities. Furniture finishes and equipment will be included in the construction contract. LEED Certification of the qualifying buildings is required. b. All facilities must be constructed in accordance with Anti-terrorism/force protection measures and regulation. All construction shall comply with Architectural Barriers Act (ABA) requirements and considerations. Construction within and supporting the program must be of the highest possible quality and workmanship commensurate with ANC?s exacting standards and the intent for construction of a ?forever project.? c. Phase II Operations Complex projected construction completion is anticipated in the Spring of 2026. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123622R2022' to obtain more details.*

Update #3 ·

09/26/2022 - Amendment 0002 Posted. 09/09/2022 - Amendment 0001 Posted. The Southern Expansion project consists of two discrete adjacent construction projects: 1) Phase II Operations Complex and 2) Phase III Cemetery Expansion. For the purpose of this Project, only the Phase II Operations Complex project is to be considered. The Phase III Cemetery Expansion will be awarded under a separate contract at another time. A brief description of work as part of this solicitation is as follows: a. Construction of the Phase II Operations Complex includes an operations building, warehouse building, maintenance building, laydown and storage space, a three-level parking structure (90,000 GSF), landscaping, plantings, an access road to the existing cemetery, and all supporting utilities. Furniture finishes and equipment will be included in the construction contract. LEED Certification of the qualifying buildings is required. b. All facilities must be constructed in accordance with Anti-terrorism/force protection measures and regulation. All construction shall comply with Architectural Barriers Act (ABA) requirements and considerations. Construction within and supporting the program must be of the highest possible quality and workmanship commensurate with ANC?s exacting standards and the intent for construction of a ?forever project.? c. Phase II Operations Complex projected construction completion is anticipated in the Spring of 2026. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123622R2022' to obtain more details.*

Update #2 ·

09/09/2022 - Amendment 0001 Posted. The Southern Expansion project consists of two discrete adjacent construction projects: 1) Phase II Operations Complex and 2) Phase III Cemetery Expansion. For the purpose of this Project, only the Phase II Operations Complex project is to be considered. The Phase III Cemetery Expansion will be awarded under a separate contract at another time. A brief description of work as part of this solicitation is as follows: a. Construction of the Phase II Operations Complex includes an operations building, warehouse building, maintenance building, laydown and storage space, a three-level parking structure (90,000 GSF), landscaping, plantings, an access road to the existing cemetery, and all supporting utilities. Furniture finishes and equipment will be included in the construction contract. LEED Certification of the qualifying buildings is required. b. All facilities must be constructed in accordance with Anti-terrorism/force protection measures and regulation. All construction shall comply with Architectural Barriers Act (ABA) requirements and considerations. Construction within and supporting the program must be of the highest possible quality and workmanship commensurate with ANC?s exacting standards and the intent for construction of a ?forever project.? c. Phase II Operations Complex projected construction completion is anticipated in the Spring of 2026. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123622R2022' to obtain more details.*

Update #1 ·

'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123622R2022

The Southern Expansion project consists of two discrete adjacent construction projects: 1) Phase II Operations Complex and 2) Phase III Cemetery Expansion. For the purpose of this Project, only the Phase II Operations Complex project is to be considered. The Phase III Cemetery Expansion will be awarded under a separate contract at another time. A brief description of work as part of this solicitation is as follows: a. Construction of the Phase II Operations Complex includes an operations building, warehouse building, maintenance building, laydown and storage space, a three-level parking structure (90,000 GSF), landscaping, plantings, an access road to the existing cemetery, and all supporting utilities. Furniture finishes and equipment will be included in the construction contract. LEED Certification of the qualifying buildings is required. b. All facilities must be constructed in accordance with Anti-terrorism/force protection measures and regulation. All construction shall comply with Architectural Barriers Act (ABA) requirements and considerations. Construction within and supporting the program must be of the highest possible quality and workmanship commensurate with ANC?s exacting standards and the intent for construction of a ?forever project.? c. Phase II Operations Complex projected construction completion is anticipated in the Spring of 2026.

*Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123622R2022' to obtain more details.*

Notice history

Similar open opportunities

Opportunity Agency Set-aside Responses due
Camp nelson national cemetery, KY 833CM3030 – correct FCA deficiencies Nicholasville, Kentucky 40356, United States · NAICS 237990 National Cemetery Administration Service-Disabled Veteran-Owned Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors