Argon Piping Supply, Installation and Testing

Closed Pre-Solicitation Posted

Solicitation number
04012026
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
Not on record
PSC
Not on record
Place of performance
Lead, South Dakota, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Energy's Fermi National Accelerator Laboratory is soliciting proposals for the supply, installation, and testing of stainless-steel piping systems to support the DUNE experiment at the Long Baseline Neutrino Facility (LBNF). The project involves designing and installing a comprehensive argon gas transportation pipeline system that will move argon from a receiving facility to the Central Utility Cavern at the 4850 Level underground. The pipeline system consists of varying diameters—8-inch Schedule 10 piping between the Argon Receiving Facility and Ross Shaft, 6-inch Schedule 10 from the shaft collar to the 4850 Level, and returning to 8-inch Schedule 10 from the shaft to the Central Utility Cavern. Contractors must demonstrate expertise in stainless-steel pipeline installation, underground construction in mining environments, and specialized piping system testing protocols. The pre-solicitation notice was posted on April 1, 2026, with a question deadline of April 30, 2026, allowing interested parties approximately 30 days to submit inquiries and prepare for the formal solicitation.

This opportunity carries no small business set-aside designation and is open to all qualified contractors. The project is driven by the substantial scale of the DUNE experiment, which requires approximately 40,000 metric tons of liquid argon to be transported and converted to gaseous form for underground distribution. While specific contract value information is not detailed in this pre-solicitation notice, the magnitude and complexity of the work—including supply, installation, and comprehensive testing of specialized piping infrastructure—suggests a significant capital investment. The detailed technical specifications and requirements are contained in the RFI.zip file posted alongside this notice, which prospective bidders should review thoroughly. Interested contractors should monitor for the formal Request for Proposal and ensure their submissions address the complete scope of work encompassing material procurement, installation logistics, pressure testing, and quality assurance documentation.

Notice text

As part of the DUNE experiment, approximately 40,000 metric tons of Argon is required to be transported from the surface to the Central Utility Cavern (CUC) at the 4850 Level. This Argon will arrive at the Ross Shaft Argon Receiving station in liquid form where it will be stored in tanks. It will then be converted to the gaseous phase, where it will be transported underground through a stainless-steel pipeline. This pipeline will be 8” diameter Schedule 10 between the Argon Receiving Facility and the Ross shaft, 6” diameter schedule 10 from Ross shaft collar to the 4850 Level, then return to 8” diameter schedule 10 from the Ross shaft to the CUC.

This SOW defined as “Argon Gas Piping Supply and Installation for LBNF” outlines the requirements for the supply, installation and testing of a stainless-steel pipeline at LBNF as described above

Files

File Type Posted
RFI.zip ZIP file

Similar open opportunities

Opportunity Agency Set-aside Responses due
PIP-II f-37 building LWC pump room piping system installation Batavia, Illinois 60510, United States · NAICS 23822 Fermi National Accelerator Laboratory No set-aside
LBNF/DUNE-US South Dakota Scaffolding Services Lead, South Dakota, United States · NAICS 332323 Fermi National Accelerator Laboratory No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity