Notice text
Title I, II and III Architect-Engineer (A-E) Services for the UnitedStates
Department of Energy, Western Area Power Administration, Desert Southwest
Customer Service Region (DSW) located in Phoenix, Arizona. This office
serves
Arizona, California and Nevada.. The Work will cover all engineering
disciplines, architectural, surveying, geotechnical, and environmental
services. A majority of the work includes surveying and construction
inspection
services. Work may consist of site investigation, design analysis, project
design and specifications preparation, cost estimates, construction
inspection,
hazardous material evaluation, testing, commissioning, as-built drawings,
telecommunications and power system studies associated with high-voltage
power
transmission lines, substations, and related facility projects. Work for
the
DSW will emphasize surveying, construction inspection, architectural,
civil,
mechanical, and structural disciplines.
One contract will be awarded from this announcement for an estimated $6
million
per year with four 1-year options. The total estimated dollar amount of the
contract will not exceed $30 million. Estimated award date is on or after
June
1, 2010. Individual task orders will be issued against an
Indefinite-delivery
Indefinite-quantity, fixed-price labor hour contract.
This acquisition is set-aside for small business concerns. The North
American
Industry Classification System Code is 541330 and the size standard is $4.5
million. In addition, to be considered for award, the offerors principal
office shall be within a 300-mile radius of the DSW office in Phoenix,
Arizona.
This is not a request for proposal. Firms interested in being considered
for
this procurement should submit four copies of form name SF 330 (Parts I &
II)
within 30 days of this notice. Standard Form (SF) 330 submissions must be
legible and must not exceed 50 double-sided pages or 100 single-sided pages
(standard size paper 8 x 11). The SF 330 shall indicate specific power
system or facility related work experience for the firm, proposed firm
personnel, and proposed consultants and subcontractors.
Responses received after 3:30 p.m., Arizona Time, July 14, 2009, will not
be
considered. Electronic submissions will not be considered. Only hard copies
of
the SF 330 will be accepted and must be mailed or hand delivered to the
Department of Energy, Western Area Power Administration, Attention: Lary
Martin, P.O. Box 6457, Phoenix, AZ 85005-6457. The SF 330 Parts I & II may
be
downloaded using this link: http://www.gsa.gov/forms. Click on Form
Library,
select Standard Forms, and then scroll down to SF 330, or go to the DOE
Industry Interactive Procurement System (IIPS) Website at
http://e-center.doe.gov to obtain the electronic file of the SF 330. Click
on
browsing opportunities by number. The link to the form will be found
under
DE-RP65-09WG81915. Prior to the final selection, the Government will hold
an
oral presentation and discussions with at least three of the most highly
qualified firms. A solicitation will only be provided to the most highly
qualified firm after discussions. E-mail inquiries may be made to the
Contract
Specialist at the e-mail addresses listed in this notice.
Firms will be evaluated on the following criteria:
A. GENERAL QUALIFICATIONS, INCLUDING:
1. reputation and standing of the firm and its principal members;
2. experience and technical competence of the firm in comparable work;
3. firms past record in performing work for DOE, other Government
agencies,
and private industry, including projects or contracts implemented with no
overruns; performance from the standpoint of cost including cost overruns
(last
5 years); the nature, extent, and effectiveness of contractors cost
reduction
program; quality of work; and ability to meet schedules including schedule
of
overruns (last 5 years) (where applicable);
4. the volume of past and present workloads;
5. interest of company management in the project and expected participation
and
contribution of top officials;
6. adequacy of central or branch office facilities for the proposed work,
including facilities for any special services that may be required;
7. geographic location of the home office and familiarity with the locality
in
which the project is located; and
8. firms experience in energy efficiency, pollution prevention, waste
reduction, and the use of recovered and environmentally preferable
materials in
design.
B. PERSONNEL AND ORGANIZATION:
1. specific experience and qualifications of personnel proposed for
assignment
to the project, and/or various phases of the work.
a. Technical skills and abilities in planning, organizing, executing, and
controlling.
b. Abilities in overall project coordination and management.
c. Experience in working together as a team.
2. proposed project organization, delegations of responsibility, and
assignments of authority.
3. availability of additional competent, regular employees for support of
the
project, and depth and size of the organization so that any necessary
expansion
or acceleration could be handled adequately.
4. experience, qualifications and past performance of proposed consultants
and
subcontractors.
5. ability to assign adequate qualified personnel from the proposed
organization (firms own organization, joint-venture organizations,
consulting
firms, etc.) including key personnel and a competent supervising
representative.
The total scoring will be based on a maximum of 100 points. The evaluation
factors are listed in order of importance. Full references to the specific
factors listed below can be found in the paragraphs immediately above.
The most significant factors (weighted at 20 points each) are:
A2: Experience and technical competence of the firm in comparable work.
B1: Specific experience and qualifications of personnel proposed for
assignment
to the project, and/or various phases of the work to include technical
skills
and abilities in planning, organizing, executing, and controlling;
abilities in
overall project coordination and management; and experience in working
together
as a team.
The next most important factor (weighted at 15 points) is:
A3: Firms past record in performing work for DOE, other Government
agencies,
and private industry, including projects or contracts implemented with no
overruns; performance from the standpoint of cost including cost overruns
(last
5 years); the nature, extent, and effectiveness of contractors cost
reduction
program; quality of work; and ability to meet schedules including schedule
of
overruns (last 5 years) (where applicable).
The next most important factors (weighted at 10 points each) are:
A7: Geographic location of the home office and familiarity with the
locality in
which the project is located.
B4: Experience, qualifications and past performance of proposed consultants
and
subcontractors.
The next most important factors (weighted at 5 points each) are:
A1: Reputation and standing of the firm and its principal members.
B2: Proposed project organization, delegations of responsibility, and
assignments of authority.
B3: Availability of additional competent, regular employees for support of
the
project, and depth and size of the organization so that any necessary
expansion
or acceleration could be handled adequately.
The next most important factors (weighted at 2 points each) are:
A4: The volume of past and present workloads.
A5: Interest of company management in the project and expected
participation
and contribution of top officials.
A6: Adequacy of central or branch office facilities for the proposed work,
including facilities for any special services that may be required.
A8: Firms experience in energy efficiency, pollution prevention, waste
reduction, and the use of recovered and environmentally preferable
materials in
design.
B5: Ability to assign adequate qualified personnel from the proposed
organization (firms own organization, joint-venture organizations,
consulting
firms, etc.) including key personnel and a competent supervising
representative.
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Award Notice | |
| Architect-engineering service title I, II, III | Award Notice |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity