Aquilla Crest Shoulder Repairs and Whitney Shoreline Abatement
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W9126G26RA107
- Agency
-
ENDIST Fort Worth
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Aquilla Lake Texas 76334
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Army Corps of Engineers Engineering District Fort Worth seeks shoulder repairs at Aquilla Dam Crest and shoreline abatement at multiple Whitney Lake parks near Clifton, Texas, with proposals due September 18, 2026 at 10:00 a.m. CST. The procurement is a total small business set-aside, foreclosing competition outside that category.
Place of performance includes Aquilla Dam Crest located 6 miles northeast of Aquilla, Texas and Lofers Day Use, Lofers West, and McCown Valley Parks at Whitney Lake, Clifton, Texas. Work encompasses all management, labor, tools, equipment, materials, and incidentals for the repairs and abatement. The NAICS code is 237310, Highway, Street, and Bridge Construction, with a $45 million size standard. The PSC is Z2LB, Repair or Alteration of Highways/Roads/Streets/Bridges/Railways.
The contract is firm fixed price with a performance period of 165 calendar days inclusive of all CLINs. Bid bond is 20% or $3 million, whichever is less. Contractors must demonstrate bonding capacity with a minimum of $1 million and $2.5 million annual aggregate. Amendment 1 updated the closing date to September 18, 2026 at 10:00 a.m. CST; no other terms or conditions changed.
Notice text
2 versions
Update #2 · Latest ·
AMD01 - Updating the closing date in PIEE to reflect the correct closing date of 18 Sept 2026 at 10:00am CST. NO CHANGES TO THE SOLICITATION. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED. Aquilla Crest Shoulder Repairs and Whitney Shoreline Abatement See Specification Div 00 PROJECT DESCRIPTION: The work includes providing all management, labor, tools, equipment, materials and incidentals to perform the following work at the Aquilla Dam Crest located 6 miles Northeast of Aquilla, TX and at Lofers Day Use, Lofers West, and McCown Valley Parks at Whitney Lake, Clifton, TX. Product Service Code : Z2LB - REPAIR OR ALTERATION OF HIGHWAYS/ROADS /STREETS/BRIDGES/RAILWAYS 1. NAICS: 237310 Highway, Street, and Bridge Construction / SIZE STANDARD - $45M AND IS A SMALL BUSINESS SET ASIDE 2. CONTRACT TYPE: FIRM FIXED PRICE. 3. PERFORMANCE PERIOD IS 165 CALENDAR DAYS INCLUSIVE OF ALL CLINS 4. BID BOND IS 20% OR $3M, WHICHEVER IS LESS 5. BONDING CAPACITY MUST BE DEMONSTRATED (MINIMUM OF $1M, AND $2.5M ANNUAL AGGREGATE)
Update #1 ·
Aquilla Crest Shoulder Repairs and Whitney Shoreline Abatement See Specification Div 00 PROJECT DESCRIPTION: The work includes providing all management, labor, tools, equipment, materials and incidentals to perform the following work at the Aquilla Dam Crest located 6 miles Northeast of Aquilla, TX and at Lofers Day Use, Lofers West, and McCown Valley Parks at Whitney Lake, Clifton, TX. Product Service Code : Z2LB - REPAIR OR ALTERATION OF HIGHWAYS/ROADS /STREETS/BRIDGES/RAILWAYS 1. NAICS: 237310 Highway, Street, and Bridge Construction / SIZE STANDARD - $45M AND IS A SMALL BUSINESS SET ASIDE 2. CONTRACT TYPE: FIRM FIXED PRICE. 3. PERFORMANCE PERIOD IS 165 CALENDAR DAYS INCLUSIVE OF ALL CLINS 4. BID BOND IS 20% OR $3M, WHICHEVER IS LESS 5. BONDING CAPACITY MUST BE DEMONSTRATED (MINIMUM OF $1M, AND $2.5M ANNUAL AGGREGATE)
Notice history
| Notice | Type | Posted |
|---|---|---|
| Synopsis of award for aquilla crest shoulder repairs and whitney shoreline abatement | Award Notice | |
| This notice | Solicitation | |
| Aquilla Crest Shoulder Repairs and Whitney Shoreline Abatement | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| FY27 Texas City Ship Channel Main Channel and Turning Basin | ENDIST Galveston | No set-aside | |
| FY26 Harlingen Placement Area (PA)13 and 10 Improvements | ENDIST Galveston | No set-aside | |
| YELL 338223 - Bridge Preservation | — | No set-aside | |
| GAOA Tony Grove Dam Spillway Capacity & Seismic Mitigation, Uinta/Wasatch/Cache National Forest | Forest Service | Total Small Business | |
| Canonsburg-Houston, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation | ENDIST Pittsburgh | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity