Annual Utility Tunnel Safety & Health Audits (Audit)

Closed Pre-Solicitation Posted

Solicitation number
AOCACB26R0034
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
541690 Other Scientific and Technical Consulting Services
PSC
H947 Other Qc/Test/Inspect- Pipe, Tubing, Hose, And Fittings
Place of performance
Washington, District of Columbia, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Architect of the Capitol intends to solicit annual utility tunnel safety and health audits for the US Capitol Power Plant, with responses to this pre-solicitation notice due May 26, 2026.

The audit shall assess current conditions and operational practices within utility tunnels for compliance with local, state, and federal safety and health regulations, documenting all areas of non-compliance and identifying probable causes. The report must address condition changes relative to past audits, including acceleration of concrete spalling and de-laminations, cracks, pipe insulation damage, and electrical conduit conditions, and evaluate potential for tunnel or pipe failure or other imminent concerns. Digital photographs are required.

Work is performed at the US Capitol Power Plant. Health and Safety Audits shall be completed under the direction of a Certified Industrial Hygienist and/or Safety Specialist, and Mechanical and Electrical Engineer(s).

NAICS 541690 (Other Scientific and Technical Consulting Services); PSC H947 (Other QC/Test/Inspect—Pipe, Tubing, Hose, and Fittings).

Notice text

The objective of the Audit is to inform US Capitol Power Plant (CPP) management regarding the current conditions and operational practices within the utility tunnels in terms of safety and health compliance to local, state, and federal regulations. The Audit shall identify and document all current areas of non-compliance. Findings shall address condition changes as related to past reports, new deterioration or safety concerns, and the probable cause. The report shall also identify if there is a potential for tunnel or pipe failure or other imminent concerns. The report shall also address noted changes in the condition of the tunnel as it relates to past reports or audits, including but not limited to the acceleration of concrete spalling de-laminations, cracks, damages to pipe insulation, and conditions of electrical conduits. The Audit Report shall contain digital photograph(s). Health and Safety Audits shall be completed under the direction of a Certified Industrial Hygienist and/or Safety Specialist, and Mechanical and Electrical Engineer(s).

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors