Amistad and Falcon Hydroelectric Power Plants NERC and TRE Compliance Consulting

Award Notice Posted

Solicitation number
191BWC18R0002
Agency
Awarded
to HSI Workplace Compliance Solutions, Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
191BWC18C0003 Federal contract award
NAICS code
541690 Other Scientific and Technical Consulting Services
PSC
Not on record
Place of performance
Amistad Power Plant 670 Texas Spur 349 Del Rio, TX 78840 Falcon Hydroelectric Power Plant FM2098, 1 Reservoir Rd Falcon Heights, TX 78545, United States

Notice details come from SAM.gov. Updated .

Notice text

5 versions

Update #5 · Latest ·

Amistad and Falcon Hydroelectric Power Plants NEWC and Texas Reliability Entity Compliance Services Contract

The USIBWC, Amistad and Falcon Hydroelectric Power Plants are located at 670 Texas Spur 349, Del Rio, TX 78840 and FM2098, 1 Reservoir Rd. Falcon Heights, TX. 78545, respectively.   Both Power Plants have a requirement under this Statement of Work (SOW) for a qualified Contractor with extensive experience (5 years or more) in North American Electric Reliability Corporation (NERC) Reliability Standards identified in Federal Energy Regulation Commission (FERC). 


The Contractor shall assist USIBWC to resolve current possible violations and comply with federal and regional reliability standards for two hydroelectric plants: Falcon and Amistad Dams. These two hydroelectric plants are located in the state of Texas and monitored by Texas Reliability Entity, Inc. (Texas RE). Texas RE is the regional entity served by the Electric Reliability Council of Texas (ERCOT) through a Delegation Agreement with the North American Electric Reliability Corporation (NERC), approved by the Federal Energy Regulation Commission (FERC). Texas RE is authorized to develop, monitor, assess, enforce compliance with NERC Reliability Standards, develop regional standards, assess and periodically report on the reliability and adequacy of the bulk power system (BPS).  Texas RE complies with the NERC Reliability Standards through various compliance monitoring tools. One of these compliance monitoring tools is an annual audit in which USIBWC experienced in 2016.  During the audit, Texas RE documented various possible noncompliance standards listed as possible violations. USIBWC is currently working to resolve these possible noncompliance standards, using a mitigation process detailed in a milestone plan with activities to resolve each specific possible violations.


The Contractor will assist USIBWC to develop, implement policies, processes, and procedures to prevent recurrence.  This will include training employees as required by the mitigation plan.  The Contractor will provide all labor, software recommendations, material, equipment, supervision, and management to comply with the Statement of Work (SOW). To access both Hydroelectric Power Plants, vendors need to cross through the United States Port of Entry and must comply with proper documentation (passports or other) as required by U.S. Customs and Border Protection officials.


Solicitation, SOW and attachments are expected to be posted on or about December 15, 2017 (this is a target date which may slip or change; if the solicitation is not posted on Federal Business Opportunities by August 2, 2017 that is because the solicitation is not available for posting).  The solicitation will be available for a minimum of thirty (30) calendar days.


This is a Presolicitation Notice.  The Solicitation will include information on how to obtain the plans and specifications.  All responsible sources may submit a proposal which will be considered by the agency. 


This is not a Request for Proposal.  Please do not submit a proposal in response to this Presolicitation Notice. 

THIS IS THE SOLICITATION.  The USIBWC is requesting proposals at this time.  Please review to section L.03 on how to obtain Attachments A, B, & C.

Any questions pertaining to this solicitation shall be submitted in writing to Lanisa.McCollum@ibwc.gov no later than 4:00pm MST on Wednesday, January 24, 2018.

The purpose of this Amendment 0001 is to post the questions and answers received against this solicitation.

The purpose of this amendment is to provide answers to additional questions received against this solicitation and provide the full text of the solicitation provisions and contract clauses as per a request received.

Update #4 ·

Amistad and Falcon Hydroelectric Power Plants NEWC and Texas Reliability Entity Compliance Services Contract

The USIBWC, Amistad and Falcon Hydroelectric Power Plants are located at 670 Texas Spur 349, Del Rio, TX 78840 and FM2098, 1 Reservoir Rd. Falcon Heights, TX. 78545, respectively.   Both Power Plants have a requirement under this Statement of Work (SOW) for a qualified Contractor with extensive experience (5 years or more) in North American Electric Reliability Corporation (NERC) Reliability Standards identified in Federal Energy Regulation Commission (FERC). 


The Contractor shall assist USIBWC to resolve current possible violations and comply with federal and regional reliability standards for two hydroelectric plants: Falcon and Amistad Dams. These two hydroelectric plants are located in the state of Texas and monitored by Texas Reliability Entity, Inc. (Texas RE). Texas RE is the regional entity served by the Electric Reliability Council of Texas (ERCOT) through a Delegation Agreement with the North American Electric Reliability Corporation (NERC), approved by the Federal Energy Regulation Commission (FERC). Texas RE is authorized to develop, monitor, assess, enforce compliance with NERC Reliability Standards, develop regional standards, assess and periodically report on the reliability and adequacy of the bulk power system (BPS).  Texas RE complies with the NERC Reliability Standards through various compliance monitoring tools. One of these compliance monitoring tools is an annual audit in which USIBWC experienced in 2016.  During the audit, Texas RE documented various possible noncompliance standards listed as possible violations. USIBWC is currently working to resolve these possible noncompliance standards, using a mitigation process detailed in a milestone plan with activities to resolve each specific possible violations.


The Contractor will assist USIBWC to develop, implement policies, processes, and procedures to prevent recurrence.  This will include training employees as required by the mitigation plan.  The Contractor will provide all labor, software recommendations, material, equipment, supervision, and management to comply with the Statement of Work (SOW). To access both Hydroelectric Power Plants, vendors need to cross through the United States Port of Entry and must comply with proper documentation (passports or other) as required by U.S. Customs and Border Protection officials.


Solicitation, SOW and attachments are expected to be posted on or about December 15, 2017 (this is a target date which may slip or change; if the solicitation is not posted on Federal Business Opportunities by August 2, 2017 that is because the solicitation is not available for posting).  The solicitation will be available for a minimum of thirty (30) calendar days.


This is a Presolicitation Notice.  The Solicitation will include information on how to obtain the plans and specifications.  All responsible sources may submit a proposal which will be considered by the agency. 


This is not a Request for Proposal.  Please do not submit a proposal in response to this Presolicitation Notice. 

THIS IS THE SOLICITATION.  The USIBWC is requesting proposals at this time.  Please review to section L.03 on how to obtain Attachments A, B, & C.

Any questions pertaining to this solicitation shall be submitted in writing to Lanisa.McCollum@ibwc.gov no later than 4:00pm MST on Wednesday, January 24, 2018.

The purpose of this Amendment 0001 is to post the questions and answers received against this solicitation.

Update #3 ·

Amistad and Falcon Hydroelectric Power Plants NEWC and Texas Reliability Entity Compliance Services Contract

The USIBWC, Amistad and Falcon Hydroelectric Power Plants are located at 670 Texas Spur 349, Del Rio, TX 78840 and FM2098, 1 Reservoir Rd. Falcon Heights, TX. 78545, respectively.   Both Power Plants have a requirement under this Statement of Work (SOW) for a qualified Contractor with extensive experience (5 years or more) in North American Electric Reliability Corporation (NERC) Reliability Standards identified in Federal Energy Regulation Commission (FERC). 


The Contractor shall assist USIBWC to resolve current possible violations and comply with federal and regional reliability standards for two hydroelectric plants: Falcon and Amistad Dams. These two hydroelectric plants are located in the state of Texas and monitored by Texas Reliability Entity, Inc. (Texas RE). Texas RE is the regional entity served by the Electric Reliability Council of Texas (ERCOT) through a Delegation Agreement with the North American Electric Reliability Corporation (NERC), approved by the Federal Energy Regulation Commission (FERC). Texas RE is authorized to develop, monitor, assess, enforce compliance with NERC Reliability Standards, develop regional standards, assess and periodically report on the reliability and adequacy of the bulk power system (BPS).  Texas RE complies with the NERC Reliability Standards through various compliance monitoring tools. One of these compliance monitoring tools is an annual audit in which USIBWC experienced in 2016.  During the audit, Texas RE documented various possible noncompliance standards listed as possible violations. USIBWC is currently working to resolve these possible noncompliance standards, using a mitigation process detailed in a milestone plan with activities to resolve each specific possible violations.


The Contractor will assist USIBWC to develop, implement policies, processes, and procedures to prevent recurrence.  This will include training employees as required by the mitigation plan.  The Contractor will provide all labor, software recommendations, material, equipment, supervision, and management to comply with the Statement of Work (SOW). To access both Hydroelectric Power Plants, vendors need to cross through the United States Port of Entry and must comply with proper documentation (passports or other) as required by U.S. Customs and Border Protection officials.


Solicitation, SOW and attachments are expected to be posted on or about December 15, 2017 (this is a target date which may slip or change; if the solicitation is not posted on Federal Business Opportunities by August 2, 2017 that is because the solicitation is not available for posting).  The solicitation will be available for a minimum of thirty (30) calendar days.


This is a Presolicitation Notice.  The Solicitation will include information on how to obtain the plans and specifications.  All responsible sources may submit a proposal which will be considered by the agency. 


This is not a Request for Proposal.  Please do not submit a proposal in response to this Presolicitation Notice. 

THIS IS THE SOLICITATION.  The USIBWC is requesting proposals at this time.  Please review to section L.03 on how to obtain Attachments A, B, & C.

Any questions pertaining to this solicitation shall be submitted in writing to Lanisa.McCollum@ibwc.gov no later than 4:00pm MST on Wednesday, January 24, 2018.

Update #2 ·

Amistad and Falcon Hydroelectric Power Plants NEWC and Texas Reliability Entity Compliance Services Contract

The USIBWC, Amistad and Falcon Hydroelectric Power Plants are located at 670 Texas Spur 349, Del Rio, TX 78840 and FM2098, 1 Reservoir Rd. Falcon Heights, TX. 78545, respectively.   Both Power Plants have a requirement under this Statement of Work (SOW) for a qualified Contractor with extensive experience (5 years or more) in North American Electric Reliability Corporation (NERC) Reliability Standards identified in Federal Energy Regulation Commission (FERC). 


The Contractor shall assist USIBWC to resolve current possible violations and comply with federal and regional reliability standards for two hydroelectric plants: Falcon and Amistad Dams. These two hydroelectric plants are located in the state of Texas and monitored by Texas Reliability Entity, Inc. (Texas RE). Texas RE is the regional entity served by the Electric Reliability Council of Texas (ERCOT) through a Delegation Agreement with the North American Electric Reliability Corporation (NERC), approved by the Federal Energy Regulation Commission (FERC). Texas RE is authorized to develop, monitor, assess, enforce compliance with NERC Reliability Standards, develop regional standards, assess and periodically report on the reliability and adequacy of the bulk power system (BPS).  Texas RE complies with the NERC Reliability Standards through various compliance monitoring tools. One of these compliance monitoring tools is an annual audit in which USIBWC experienced in 2016.  During the audit, Texas RE documented various possible noncompliance standards listed as possible violations. USIBWC is currently working to resolve these possible noncompliance standards, using a mitigation process detailed in a milestone plan with activities to resolve each specific possible violations.


The Contractor will assist USIBWC to develop, implement policies, processes, and procedures to prevent recurrence.  This will include training employees as required by the mitigation plan.  The Contractor will provide all labor, software recommendations, material, equipment, supervision, and management to comply with the Statement of Work (SOW). To access both Hydroelectric Power Plants, vendors need to cross through the United States Port of Entry and must comply with proper documentation (passports or other) as required by U.S. Customs and Border Protection officials.


Solicitation, SOW and attachments are expected to be posted on or about December 15, 2017 (this is a target date which may slip or change; if the solicitation is not posted on Federal Business Opportunities by August 2, 2017 that is because the solicitation is not available for posting).  The solicitation will be available for a minimum of thirty (30) calendar days.


This is a Presolicitation Notice.  The Solicitation will include information on how to obtain the plans and specifications.  All responsible sources may submit a proposal which will be considered by the agency. 


This is not a Request for Proposal.  Please do not submit a proposal in response to this Presolicitation Notice. 

THIS IS THE SOLICITATION.  The USIBWC is requesting proposals at this time.  Please review to section L.03 on how to obtain Attachments A, B, & C.

Update #1 ·

Amistad and Falcon Hydroelectric Power Plants NEWC and Texas Reliability Entity Compliance Services Contract

The USIBWC, Amistad and Falcon Hydroelectric Power Plants are located at 670 Texas Spur 349, Del Rio, TX 78840 and FM2098, 1 Reservoir Rd. Falcon Heights, TX. 78545, respectively.   Both Power Plants have a requirement under this Statement of Work (SOW) for a qualified Contractor with extensive experience (5 years or more) in North American Electric Reliability Corporation (NERC) Reliability Standards identified in Federal Energy Regulation Commission (FERC). 


The Contractor shall assist USIBWC to resolve current possible violations and comply with federal and regional reliability standards for two hydroelectric plants: Falcon and Amistad Dams. These two hydroelectric plants are located in the state of Texas and monitored by Texas Reliability Entity, Inc. (Texas RE). Texas RE is the regional entity served by the Electric Reliability Council of Texas (ERCOT) through a Delegation Agreement with the North American Electric Reliability Corporation (NERC), approved by the Federal Energy Regulation Commission (FERC). Texas RE is authorized to develop, monitor, assess, enforce compliance with NERC Reliability Standards, develop regional standards, assess and periodically report on the reliability and adequacy of the bulk power system (BPS).  Texas RE complies with the NERC Reliability Standards through various compliance monitoring tools. One of these compliance monitoring tools is an annual audit in which USIBWC experienced in 2016.  During the audit, Texas RE documented various possible noncompliance standards listed as possible violations. USIBWC is currently working to resolve these possible noncompliance standards, using a mitigation process detailed in a milestone plan with activities to resolve each specific possible violations.


The Contractor will assist USIBWC to develop, implement policies, processes, and procedures to prevent recurrence.  This will include training employees as required by the mitigation plan.  The Contractor will provide all labor, software recommendations, material, equipment, supervision, and management to comply with the Statement of Work (SOW). To access both Hydroelectric Power Plants, vendors need to cross through the United States Port of Entry and must comply with proper documentation (passports or other) as required by U.S. Customs and Border Protection officials.


Solicitation, SOW and attachments are expected to be posted on or about December 15, 2017 (this is a target date which may slip or change; if the solicitation is not posted on Federal Business Opportunities by August 2, 2017 that is because the solicitation is not available for posting).  The solicitation will be available for a minimum of thirty (30) calendar days.


This is a Presolicitation Notice.  The Solicitation will include information on how to obtain the plans and specifications.  All responsible sources may submit a proposal which will be considered by the agency. 


This is not a Request for Proposal.  Please do not submit a proposal in response to this Presolicitation Notice. 

Files