Air Traffic Control Tower Seymour-Johnson AFB, NC

Award Notice Posted

Solicitation number
W912HN-17-R-0011
Agency
Awarded
to Odyssey International, Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
W912HN19C3005 Federal contract award
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Not on record
Place of performance
Seymour-Johnson Air Force Base, North Carolina Sj Afb, North Carolina United States, United States

Notice details come from SAM.gov. Updated .

Notice text

4 versions

Update #4 · Latest ·

Awarded Vendors: Walsh Federal JV. Contract Award Dollar Amount: $24,929,000 (Inclding Options). Contract Award Date: 2019-06-28.

Update #3 ·

Awarded Vendors: Odyssey International, Inc.. Contract Award Dollar Amount: $22,444,000.00 (Including Options). Contract Award Date: 2019-03-27.

Update #2 ·

Magnitude of the project: $10M-$25M
Period of Performance: 540 days after the issuance of Notice to Proceed (NTP)
Method of Procurement: Lowest price Technically Acceptable (LPTA)
2 Technical Factors: 1. Past Performance, 2. Corporate Relevant Specialized Experience
Scope of Work
PN: VKAG 01-3004R5, Seymour Johnson AFB, NC
Air Traffic Control Tower/Base Operations Complex
New construction of an eleven story air traffic control tower. The site is in a high risk zone for other on-going airfield-related operations in associated existing facilities as well as the immediately adjacent active airfield. The tower portion of the project includes erection of complex progressive collapse structural building framing, all dedicated heating ventilation, air conditioning (HVAC), emergency auto-start back-up electrical power for multiple functions, dedicated air traffic electronics communications infrastructure, and specialized control tower cab space to accommodate customized installation of new control systems/hardware. This tower has an added degree of complexity in that it is to be constructed as an integral part (within the same building footprint) of a 25,000 square feet base operations facility supporting tower and airfield operations. All other supporting building site improvements and infrastructure are also included. Following acceptance and operational activation of the complex, the project includes demolition of existing air traffic control tower, Radar Approach Control (RAPCON), base operations and related buildings and infrastructure. The new construction must be completed within 540 calendar days of notice to proceed..

Update #1 ·

Magnitude of the project: $10M-$25M
Period of Performance: 540 days after the issuance of Notice to Proceed (NTP)
Method of Procurement: Lowest price Technically Acceptable (LPTA)
2 Technical Factors: 1. Past Performance, 2. Corporate Relevant Specialized Experience

Scope of Work
PN: VKAG 01-3004R5, Seymour Johnson AFB, NC
Air Traffic Control Tower/Base Operations Complex
New construction of an eleven story air traffic control tower. The site is in a high risk zone for other on-going airfield-related operations in associated existing facilities as well as the immediately adjacent active airfield. The tower portion of the project includes erection of complex progressive collapse structural building framing, all dedicated heating ventilation, air conditioning (HVAC), emergency auto-start back-up electrical power for multiple functions, dedicated air traffic electronics communications infrastructure, and specialized control tower cab space to accommodate customized installation of new control systems/hardware. This tower has an added degree of complexity in that it is to be constructed as an integral part (within the same building footprint) of a 25,000 square feet base operations facility supporting tower and airfield operations. All other supporting building site improvements and infrastructure are also included. Following acceptance and operational activation of the complex, the project includes demolition of existing air traffic control tower, Radar Approach Control (RAPCON), base operations and related buildings and infrastructure. The new construction must be completed within 540 calendar days of notice to proceed.

Files

File Type Posted
A.07.24_W912HN17R00110010_Conformed_Copy.pdf PDF
A.07.24_W912HN17R00110010.pdf PDF
17R11vol1.pdf PDF
amd9.pdf PDF
amd8.pdf PDF
17R11vol1.pdf PDF
amd7.pdf PDF
17R11vol1.pdf PDF
amd6.pdf PDF
17R11vol1.pdf PDF
17R11vol4.pdf PDF
amd5.pdf PDF
17R11vol1.pdf PDF
amd4.pdf PDF
17R11vol1.pdf PDF
amd3.pdf PDF
Asbuilts_FIO.zip ZIP file
W912HN-17-R-0011_AMD2.PDF PDF
17R11vol2.pdf PDF
17R11vol4.pdf PDF
17R11vol3.pdf PDF
RFPLetter_R2.pdf PDF
17R11vol1.pdf PDF
17R11vol1.pdf PDF
W912HN-17-R-0011_AMD1.PDF PDF
amd1.pdf PDF
17R11vol4.pdf PDF
17R11vol3.pdf PDF
17R11vol1.pdf PDF
W912HN-17-R-0011.PDF PDF
17R11vol2.pdf PDF
Show all 31

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors