Add Alter Paint Barn Decontamination Area for B406

Closed Pre-Solicitation Posted

Solicitation number
EEPZ132020
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Columbus, Mississippi 39710, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Air Force Air Education and Training Command is seeking a contractor to perform an addition and alteration to the Paint Barn Decontamination Area at Building 406 on Columbus Air Force Base in Mississippi. The project involves renovating the Paint Hangar Administration and Decontamination area, installing a new fire alarm and mass notification system, and conducting control work on the mechanical system in the paint bays. The contractor will be required to comply with all applicable Unified Facilities Criteria, Engineering Technical Letters, local and national codes, and the Columbus AFB Installation Facility Standards. Key requirements include verifying existing conditions, submitting as-built drawings, and notifying the Contracting Officer of any unforeseen site conditions.

This is a firm-fixed price renovation and construction contract with a designated NAICS code of 236220 and a size standard of $45M. The Range of Magnitude for this project is between $1,000,000 and $5,000,000. There is no set-aside designation, and the government has not identified any potential incumbents or current contractors. Interested parties are asked to provide business details, past experience, bonding capacity, and information on their ability to team with small businesses to meet subcontracting limitations.

Notice text

(See SOW for further description)

The Contractor must provide all plant, labor, equipment, transportation, and tools required to complete the addition and alteration to B406 Paint Barn. Perform all work according to this Statement of Work (SOW), the 100% Design, 100% Specifications, and all related AF requirements and other codes and references. Contruction must be accomplished in accordance with applicable UFC’s, ETL’s, (UFC’s and ETL’s may be found on-line at www.wbdg.org) local and national codes, Columbus AFB Installation Facility Standards (IFS) and all Appendices (Special Construction, Mechanical, and Electrical) and other guidance as modified by this SOW. The IFS document may be found at the following location: http://www.wbdg.org/ffc/af-afcec/installation-facilities-standardsifs/columbus-afb-ifs.

The government will furnish 100% design documents to the contractor, including drawings (PDF and CAD) and specifications. The contractor is expected to keep accurate redline drawings during construction and submit As-Builts upon project completion. Deliver two (2) hard copies of As-Builts (24”x36”) and one (1) digital copy via DoD SAFE containing each drawing sheet in both PDF and CAD file format directly to the CO, along with AF Form 3000. For uploading to DoD SAFE, the Contractor must request an upload link from the CO and then upload the files using the details in the subsequent email from DoD SAFE. For the As-Built submittal, the contractor is to provide, in addition to the hard copies and digital copies via DoD SAFE, (1) CD-ROM containing the PDF file as well as the associated CAD files in AutoCAD (Release 2020) .dwg file format. Hard copy submittals and CD-ROMs must be delivered to:

14th Contracting Squadron

495 Harpe Blvd, Suite 293

Columbus, MS 39710

The contractor is responsible for verification of existing dimensions, conditions, etc., and constructability based on provided design, and bids should reflect all costs necessary to complete construction. If the contractor encounters any unforeseen site conditions at any time, prior to or after contract award, the contractor must notify the CO immediately before proceeding with any work.

BACKGROUND

The facility is currently not configured to adequately allow for proper decontamination of personnel engaged in painting operations. Additionally, the facility is currently experiencing air flow issues in the paint process supply/exhaust system. The goal of this project is to configure the PPE locker/decontamination area to meet current requirements and to provide a solution for the issues with the supply/exhaust system in the paint bays.

SCOPE OF PROJECT

The Project involves a renovation and addition to B406 Paint hangar Administration and Decontamination area. A new fire alarm and mass notification system will be installed through the administration and decontamination area, while existing fire alarm system components will remain as-is in the paint bays. The project involves control work on the mechanical system in the paint bays.

Files

File Type Posted
SOW Add Alter Paint Barn B406.docx DOCX document
EEPZ132020 Sources Sought.pdf PDF