77361 - FOM Cage with Installation

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
FA857125Q0006
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Warner Robins, Georgia 31098, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Air Force Materiel Command Air Force Sustainment Center is seeking a contractor to provide and install a Facilitate Other Maintenance (FOM) Cage at Building 149 for the Maintenance Support Group (AMXG) at Robins Air Force Base, Georgia. The contractor will be required to furnish all necessary tools, parts, materials, equipment, transportation, and labor to install approximately 700 linear feet of 10-foot tall galvanized chain link fencing with identified gates per the provided drawings. Evaluation will be based on price, and the deadline for submitting quotes is 3:00PM on October 16, 2024.

This is a total small business set-aside opportunity with a NAICS code of 238990 - All Other Specialty Trade Contractors and a $19 million size standard. The period of performance is from January 14, 2025 to March 17, 2025. The contractor will be required to comply with various safety, environmental, and training requirements, including submitting a Contractor Safety Plan, EMS Awareness Training Status Report, and ISO 50001 Energy Management Status Report. The place of performance is Robins Air Force Base in Georgia.

Notice text

4 versions

Update #4 · Latest ·

The Contractor shall provide all the: tools, parts, materials, equipment, transportation, and labor of the Facilitate Other Maintenance (FOM) Cage w/Install at Bldg 149 for the Maintenance Support Group (AMXG) at Robins Air Force Base (AFB), Georgia.

Please see the attached files for additional information.

Update: 22 October 2024

The solicitation close date has been extended to Tuesday, 29 October 2024 at 3:00pm EST.

NOTICE OF SITE VISIT OPPORTUNITY

Where: Watson Gate Visitor Center, Robins AFB

When: Friday, 25 October 2024

  • Vendors shall meet the Govt POCs at the Visitor Center at 7:30am EST
  • All parties will head to the jobsite at 8:30am EST

Govt POCs: Please call the following if there any delays to timely arrival:

  • Joe Hendrix: 478-256-2993
  • Chris Gilliland: 864-313-6857

Important Information:

  • Photos will NOT be allowed.
  • Additional documents will NOT be provided. If needed, please bring a printed copy of the documents attached to the original solicitation post on SAM.gov.
  • Background checks will be performed during check-in. Any individuals with felonies or warrants that show up will be detained at the gate.

RSVP: Please RSVP NLT Thursday, 24 October 2024 at 12:00pm EST.

  • RSVP shall be accomplished by emailing Patrick Hulett at patrick.hulett@us.af.mil using the following format:

Email Title: RSVP_77361 - FOM Cage with Installation

Name:

Business Name:

CAGE Code:

Phone Number:

Number of Attendees:

Name and Phone Number of Each Attendee:

Update: 16 October 2024

The purpose of this update is to extend this combined synopsis/ solicitation. Any questions asked by contractors will be provided below with the answers.  Any contractor that has submitted a quote is free to make updates and resubmit by the requested time and date.

FAQ:

  • Q: The post will be plated but it is ok to drill the post in the ground and anchor them?
  • A: The post plates will be anchored to the floor; posts will not penetrate floor.
  • Q: How should the quote be submitted?
  • A: Please submit your quote to the primary point of contact listed within this solicitation. PDF or Word document is preferred. Just provide a price based on the line items found within the Letter RFQ, but feel free to provide a more detailed breakdown if preferred.
  • Q: What gauge wired is required for the fencing?  Will that be 9 gauge?
  • A: The Fence will be 9Ga wire.
  • Q:Should barb wire be installed at the top of the fence?
  • A: No, barb wire is not needed.
  • Q:How big should the corner, end, and line posts be?  Should the terminal posts all be 3” and line posts 2.5”?
  • A: Sizes on the posts are 2 ½”  Terminal Post , 2” Line Post &  1 5/8” Top Rail
  • Q:Will there only be two man gates?
  • A: 2 Ea. 10’ Sliding Gates , 2 Ea.  20’ Sliding Gates , 2  Ea.  3’ Personnel (swinging) Gates
  • Q:Should anchors be used to secure the posts in lieu of core drilling into the slab?
  • A: All posts will need to be flanged and anchored into the concrete.
Update #3 ·

The Contractor shall provide all the: tools, parts, materials, equipment, transportation, and labor of the Facilitate Other Maintenance (FOM) Cage w/Install at Bldg 149 for the Maintenance Support Group (AMXG) at Robins Air Force Base (AFB), Georgia.

Please see the attached files for additional information.

Update: 16 October 2024

The purpose of this update is to extend this combined synopsis/ solicitation. Any questions asked by contractors will be provided below with the answers.  Any contractor that has submitted a quote is free to make updates and resubmit by the requested time and date.

FAQ:

  • Q: The post will be plated but it is ok to drill the post in the ground and anchor them?
  • A: The post plates will be anchored to the floor; posts will not penetrate floor.
  • Q: How should the quote be submitted?
  • A: Please submit your quote to the primary point of contact listed within this solicitation. PDF or Word document is preferred. Just provide a price based on the line items found within the Letter RFQ, but feel free to provide a more detailed breakdown if preferred.
  • Q: What gauge wired is required for the fencing?  Will that be 9 gauge?
  • A: The Fence will be 9Ga wire.
  • Q:Should barb wire be installed at the top of the fence?
  • A: No, barb wire is not needed.
  • Q:How big should the corner, end, and line posts be?  Should the terminal posts all be 3” and line posts 2.5”?
  • A: Sizes on the posts are 2 ½”  Terminal Post , 2” Line Post &  1 5/8” Top Rail
  • Q:Will there only be two man gates?
  • A: 2 Ea. 10’ Sliding Gates , 2 Ea.  20’ Sliding Gates , 2  Ea.  3’ Personnel (swinging) Gates
  • Q:Should anchors be used to secure the posts in lieu of core drilling into the slab?
  • A: All posts will need to be flanged and anchored into the concrete.
Update #2 ·

The Contractor shall provide all the: tools, parts, materials, equipment, transportation, and labor of the Facilitate Other Maintenance (FOM) Cage w/Install at Bldg 149 for the Maintenance Support Group (AMXG) at Robins Air Force Base (AFB), Georgia.

Please see the attached files for additional information.

Update: 16 October 2024

The purpose of this update is to extend this combined synopsis/ solicitation. Any questions asked by contractors will be provided below with the answers.  Any contractor that has submitted a quote is free to make updates and resubmit by the requested time and date.

FAQ:

  • Q: The post will be plated but it is ok to drill the post in the ground and anchor them?
  • A: The post plates will be anchored to the floor; posts will not penetrate floor.
  • Q: How should the quote be submitted?
  • A: Please submit your quote to the primary point of contact listed within this solicitation. PDF or Word document is preferred. Just provide a price based on the line items found within the Letter RFQ, but feel free to provide a more detailed breakdown if preferred.
  • Q: What gauge wired is required for the fencing?  Will that be 9 gauge?
  • Q:Should barb wire be installed at the top of the fence?
  • Q:How big should the corner, end, and line posts be?  Should the terminal posts all be 3” and line posts 2.5”?
  • Q:Will there only be two man gates?
  • Q:Should anchors be used to secure the posts in lieu of core drilling into the slab?
  • A: **The previous 5 questions are currently awaiting answers. As soon as a response from the mission partner is received the answers will be posted below each question.**
Update #1 ·

The Contractor shall provide all the: tools, parts, materials, equipment, transportation, and labor of the Facilitate Other Maintenance (FOM) Cage w/Install at Bldg 149 for the Maintenance Support Group (AMXG) at Robins Air Force Base (AFB), Georgia.

Please see the attached files for additional information.

Files

Notice history

Notice Type Posted
77361 - FOM Cage with Installation Award Award Notice
This notice Latest solicitation Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
10-Miler Fencing Patrick AFB, Florida 32925, United States · NAICS 532490 Air Force Space Command Total Small Business
PKA Relocatable Facility FE Warren AFB, Wyoming 82005, United States · NAICS 332311 Global Strike Command Total Small Business
Fence Repair BPA Fort Drum, NY Fort Drum, New York, United States · NAICS 238990 MICC Fort Drum Total Small Business
Building 231 Audio and Video Equipment Warner Robins, Georgia 31088, United States · NAICS 517810 Air Force Sustainment Center No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity