7020--PIV Readers with Installation

Closed Pre-Solicitation Posted

Solicitation number
36C26320Q0587
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
541519 Other Computer Related Services
PSC
7020 Information Technology Central Processing Unit (Cpu, Computer), Analog
Place of performance
4801 Veterans Drive St Cloud MN 56303 USA

Notice details come from SAM.gov. Updated .

Notice text

THIS IS A SOURCES SOUGHT NOTICE ONLY. This is not a solicitation for bids, proposals, proposal abstracts, or quotations. The purpose of this Sources Sought Notice is to obtain information regarding the availability and capability of all qualified sources to perform a potential requirement. The responses received from interested contractors will assist the Government in determining the appropriate method. The Department of Veterans Affairs (VA), NCO 23- St Cloud is requesting procurement information for Avigilon or Equal PIV Reader with Installation for the St Cloud VA Health Care System located in St Cloud MN. The VA is in search of SDVOSB/VOSB organizations that are capable of servicing the St Cloud VA Health Care System, St Cloud s need to procure the following:

Requirements

Access Control System with Installation

Currently the St. Cloud VA Health Care System (STC VAHCS) has an existing Facility Commander WXN access control system that is no longer supported for software or repair parts.

Requesting Avigilon Brand or Equal

Requesting contractor to provide all equipment, licenses, software, hardware, installation, programming and training to upgrade the access control system.

Requirements:

A minimum of 128 Card Reader Licenses

Hardware License

Controller with 2-Door Interface (26 Each)

2-Door Controller Enclosure (26 Each)

M2000 Replacement Controller (10 Each)

M5 Communication Board (6 Each)

M5 Controller CPU (6 Each)

M5 2RP Replacement (9 Each)

M5 8RP Replacement (2 Each)

HID PIV Reader (35 Each)

HID Wall Style PIV Reader (48 Each)

HID Wall Style PIV Card/Keypad Reader (16 Each)

Cable (may reuse some existing cable if applicable)

Provide new controllers that fit into existing controller housing (W X H X D: 2-door: 9 X 10 X 3 ; 4-door: 14 X 14 X 3.5 )

Provide remote access to add and delete users

Provide remote access to program timed access to lock and unlock doors

Provide remote maintenance access to check status of controllers and readers

Provide 100% browser-based system

Provide more secured LINUX based operating system

Incorporate ability to add licenses due to expansion project

Provide capability to interface with Security Operations Center without the use of middle ware for a future project

Provide ability to integrate with facility lock down by VA Police

Replacement system needs to work with Federal Information Processing Standard (FIPS) 201 Government Personal Identity Verification (PIV) cards

Installation, Programming and Training:

Installation will comply with any and all state and Federal electrical requirements

ICRA requirements must be met when working in public areas

Installers must be Avigilon certified or equal manufacturer brand certified, depending on award and provide certification before work begins

Contractor will replace all existing controllers and card readers throughout the facility, along with remote access for controlling and monitoring system from Building 3, Room 215A

Contractor will add remote maintenance access for checking status of controllers and/or readers in Building 48, Room 214

Contractor will coordinate with Curtis Gregory to verify functionality of card access system in each building before proceeding to next location

Contractor must coordinate with IT/Daniel Dillman for any networking/IP changes

Contractor will program the new access system

Upon completion of contract, contractor shall demonstrate and verify a proper and fully functional access control system with VA POC

Contractor will remove all generated waste and dispose of any debris off-site

Contractor will provide training for the new access system

General Information:

Contractor is responsible to provide all the labor, tools, parts, and equipment to provide fully functional, installed card access system at the St Cloud VA Healthcare System, 4801 Veterans Drive, St Cloud, MN 56303

Contractor is responsible for all costs for transportation, lodging, meals and other personal necessities for its employees and subcontractors (as applicable)

Contractor is responsible for the shipping costs and logistics for all tools and equipment necessary for the performance of this contract

A VA St. Cloud Contractor badge shall be worn by all Contractor employees while on premises. Contractor badges are issued in B-3, second floor, Facilities Maintenance and Operations Office

Work shall be performed during normal business hours Monday through Friday 8:00 am to 4:30 pm excluding Federal Holidays, unless otherwise authorized by the site's POC

Contractor is required to check in with the Bio-Electric Shop each day of service

Work must be completed within 90 days of award

Timeline schedule to be provided to STC VAHCS two (2) weeks before start of work

Building

Level

Door / Room #

Door / Room Description

Controller Number

Controller Location

Reader Number

Reader Model

Â

Â

Â

Â

Â

Â

Â

Â

1A

Basement

A03

Telephone Closet

10

A03

R1

T-500-PIV

Â

Â

Â

Â

Â

Â

Â

Â

1A

Basement

A064

Microbiology Room

33

A03

R1

T-520-PIV

Â

Â

Â

Â

Â

Â

R2

T-520-PIV

1

Main Floor

A101

Tele-Comm

11

A101

R1

T-500-PIV

Â

Â

Â

Â

Â

Â

Â

Â

1

Main Floor

127A

Telephone Closet

12

127A

R1

T-500-PIV

Â

Â

Â

Â

Â

Â

Â

Â

1

Main Floor

127A

B.1 Front Door

8

127A

R1

T-520-PIV

Â

Â

Â

Ambulance Garage

Â

Â

R2

T-520-PIV

Â

Â

Â

Â

Â

Â

Â

Â

1A

2nd Floor

A216

Data

13

A216

R1

T-500-PIV

Â

Â

Â

Â

Â

Â

Â

Â

1A

2nd Floor

A210

Surgery Nurse Desk

7

A216

R1

T-520-PIV

Â

Â

A218

Clean Core

Â

Â

R2

T-520-PIV

Â

Â

Â

West Ramp to Surgery

Â

Â

R3

T-520-PIV

Â

Â

226A

B.4 Ramp door

Â

Â

R4

T-520-PIV

Â

Â

Â

Â

Â

Â

Â

Â

1A

2nd Floor

A223

OR # 3

9

A216

R1

T-520-PIV

Â

Â

A222

OR # 2

Â

Â

R2

T-520-PIV

Â

Â

A219

OR # 1

Â

Â

R3

T-520-PIV

Â

Â

Â

Â

Â

Â

Â

Â

1A

2nd Floor

229

Data

14

229

R1

T-500-PIV

Â

Â

Â

Â

Â

Â

Â

Â

2

Main Floor

1A

Data

15

1A

R1

T-500-PIV

Â

Â

Â

Â

Â

Â

Â

Â

4

Main Floor

123C

Data

16

123C

R1

T-500-PIV

Â

Â

Â

Â

Â

Â

Â

Â

4

2nd Floor

222A

Data

17

222A

R1

T-500-PIV

Â

Â

Â

Â

Â

Â

Â

Â

4

1ST FLR

185

DATA

60

185

R1

MTK15

Â

Â

186

ELECTRICAL

Â

Â

R2

MTK15

Â

Â

187

MECHANICAL

Â

Â

R3

MTK15

Â

Â

185

DATA

Â

Â

R4

MTK15

4

Basement

40

DEMARK

61

185

R1

MTK15

Â

Â

185

Elect to Data Door

Â

Â

R2

MTK15

Â

Â

Â

Â

Â

Â

R3

Â

5

Main Floor

RM 117

Low Voltage RM

3

117

R1

T-520-PIV

Â

Â

Â

Â

Â

Â

R2

Â

Â

Â

RM 114

IT Closet

Â

Â

R3

T-520-PIV

Â

Â

VAULT

Vault

Â

Â

R4

T-525-PIV

Â

Â

RM 102 N

Pharmacy Outside Door N.

Â

Â

R5

T-525-PIV

Â

Â

RM 102 SW

Â

Â

Â

R6

T-525-PIV

Â

Â

RM 120

Agent Cashier

Â

Â

R7

T-525-PIV

Â

Â

B.3 N

B. 3 N Entrance

Â

Â

R8

T-520-PIV

Â

Â

Â

Â

Â

Â

Â

Â

5

Main Floor

114

Outer new hall

32

117

R1

T-500-PIV

Â

Â

Â

Inner New Hall

Â

Â

Â

T-525-PIV

Â

Â

RM 117

Security Closet

Â

Â

Â

T-520-PIV

Â

Â

RM 104A

Mixing Room

Â

Â

R2

MTK15

Â

Â

Â

Â

Â

Â

Â

Â

7

Main Floor

105

KEY CABINET

2

103

R1

T-500-PIV

Â

Â

Â

Â

Â

Â

Â

Â

8

Basement

12A

Telephone Closet

18

12A

R1

T-500-PIV

Â

Â

Â

Â

Â

Â

Â

Â

9

Basement

16

Data

19

16

R1

T-500-PIV

Â

Â

Â

Â

Â

Â

Â

Â

9

Basement

3

Badge Room

35

16

R1

T-500-PIV

Â

Â

13D

Armory

Â

Â

R2

T-525 PIV

Â

Â

Â

Â

Â

Â

Â

Â

10

Basement

6

Data

20

6

R1

T-500-PIV

Â

Â

Â

Â

Â

Â

Â

Â

14

Main Floor

101A

Data

23

101A

R1

T-500-PIV

Â

Â

100

West Entrance

Â

Â

R2

T-500-PIV

Â

Â

100

East Entrance

Â

Â

R3

T-500-PIV

Â

Â

Â

Â

Â

Â

Â

Â

28

Basement

68A

Data

21

68A

R1

T-500-PIV

Â

Â

228

Data

Â

Â

R2

T-520-PIV

Â

Â

Â

Â

Â

Â

Â

Â

29

Basement

15

Data

22

15

R1

T-500-PIV

Â

1st floor

144

Data

Â

Â

R2

T-520-PIV

Â

Â

Â

Â

Â

Â

Â

Â

29

Basement

Â

N/A

4

15

R1

Â

Â

Â

Â

Â

Â

Â

R2

Â

Â

Â

Â

Â

Â

Â

Â

Â

48

Main Floor

123

Data

24

123

R1

T-500-PIV

Â

Â

Â

Â

Â

Â

Â

Â

48

2nd Floor

221

Data

25

221

R1

T-500-PIV

Â

Â

Â

Â

Â

Â

Â

Â

49

Main Floor

177

Data

28

177

R1

T-500-PIV

Â

Â

177

Data

Â

Â

R2

T-500-PIV

Â

Â

Â

Â

Â

Â

Â

Â

49

2nd Floor

277

Data

40

277

R1

T-500-PIV

Â

Â

277

Data

Â

Â

R2

T-500-PIV

Â

Â

Â

Â

Â

Â

Â

Â

49

Basement

15

Satellite Pharmacy

5

33

R1

T-525 PIV

Â

Â

48/49 Ent

Exterior Entrance

Â

Â

R3

T-520-PIV

Â

Â

50/51 Ent

Exterior Entrance

Â

Â

R4

T-520-PIV

50

Main Floor

103A

Closet

27

103A

R1

T-500-PIV

Â

Â

103A

Closet

Â

Â

R2

T-500-PIV

Â

Â

Â

Â

Â

Â

Â

Â

51

Main Floor

103

Telephone Closet

26

103

R1

T-500-PIV

Â

Â

Â

Â

Â

Â

Â

Â

59

1st Floor

101

Laundry Distribution

34

012-008

R1

T-500-PIV

Â

Â

103

Laundry

Â

Â

R2

T-500-PIV

Â

Â

5

Basement Storeroom

Â

Â

R3

T-500-PIV

Â

Â

102

Receiving

Â

Â

R4

T-500-PIV

Â

Â

Â

Â

Â

Â

Â

Â

95

Main Floor

7

Retail Store Front

36

15-095

R1

T-520-PIV

Â

Â

8

Retail Storage

Â

Â

R2

T-520-PIV

Â

Â

Â

Â

Â

Â

Â

Â

95

Main Floor

25

ACCOUNTING ROOM

37

15-095

R1

MTK15

Â

Â

24

OFFICE

Â

Â

R2

T-500-PIV

Â

Â

Â

Â

Â

Â

Â

Â

95

Main Floor

11

IT CLOSET

29

15-095

R1

T-500-PIV

Â

Â

Â

Â

Â

Â

Â

Â

108

Â

112

Switch Room

1

112-108

R1

T-520-PIV

Â

Â

110

Computer Room

Â

Â

R2

T-520-PIV

Â

Â

104

B14 Pharmacy Cache

Â

Â

R3

T-525-PIV

109

Main Floor

100

Phone/Data within Rm100

31

100

R1

T-500-PIV

Â

Â

Â

Â

Â

Â

Â

Â

115

Main Floor

Â

N. Main Entrance

42

160

R1

T-520-PIV

Â

Â

104

Security desk and Break RM

Â

Â

R2

T-520-PIV

Â

Â

Â

Â

Â

Â

Â

Â

115

Main Floor

101

E. Outside Door

41

160

R1

T-520-PIV

Â

Â

103

Bldg. 111 Corridor Door

Â

Â

R2

T-520-PIV

Â

Â

115

Loading Dock Door

Â

Â

R3

T-520-PIV

Â

Â

107

IT CLOSET

Â

Â

R4

T-520-PIV

Â

Â

Â

SPARE

Â

Â

R5

Â

Â

Â

127

SW. Outside Door

Â

Â

R6

T-520-PIV

Â

Â

127

SW. Inside Door

Â

Â

R7

T-520-PIV

Â

Â

145

Med Room Door

Â

Â

R8

T-520-PIV

Â

Â

117

S. Sally Port

Â

Â

R1-2

T-520-PIV

Â

Â

117

S. Sally Port

Â

Â

R2-2

T-520-PIV

Â

Â

117

S. Sally Port

Â

Â

R3-2

T-520-PIV

Â

Â

117

S. Sally Port

Â

Â

R4-2

T-520-PIV

Â

Â

146

N. Sally Port

Â

Â

R5-2

T-520-PIV

Â

Â

146

N. Sally Port

Â

Â

R6-2

T-520-PIV

Â

Â

146

N. Sally Port

Â

Â

R7-2

T-520-PIV

Â

Â

146

N. Sally Port

Â

Â

R8-2

T-520-PIV

Â

Â

Â

Â

Â

Â

Â

Â

116

Main Floor

111

It Closet

44

112

R1

T-520-PIV

Â

Â

Â

Tunnel Door North

Â

Â

R2

T-520-PIV

Â

Â

Â

Tunnel Door South

Â

Â

R3

T-520-PIV

Â

Â

121

OP GYM

Â

Â

R4

T-520-PIV

Â

Â

Â

Â

Â

Â

Â

Â

118

Basement

5

basement data

44

5

R1

T-520-PIV

Â

Â

100

S.E. Entrance

Â

Â

R2

T-520-PIV

Â

Â

115

1st Floor Data

Â

Â

R3

T-520-PIV

Â

Â

Â

N.W. Entrance

Â

Â

R4

T-520-PIV

Files

File Type Posted
36C26320Q0587.docx DOCX document

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity