6515--Guldmann Patient Ceiling Lift Motors

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
36C25026Q0410
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Department of Veterans Affairs Dayton VA Medical Center Dayton, Ohio 45428, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Veterans Affairs, Veterans Integrated Service Network 10, is seeking quotations for Guldmann GH3+ patient ceiling lift motors and certified installation services for the Dayton VA Medical Center. The procurement includes 127 units of Guldmann GH3+ 605lbs SWL Hoist with Scale, Ceiling Lift Motor (CLM), and Hanger Bar; 1 unit of Guldmann GH3+ Twin 1100lbs SWL Hoist with Scale and Hanger Bar; and certified installation, hoist replacement, weight testing, and training services for 128 installations. Quoters must be authorized suppliers and installers for Guldmann lifts and must provide documentation from Guldmann, Inc., confirming their authorization status. Award will be based on lowest price for the exact items specified, with pricing to be reviewed against recent VA purchases to ensure fairness and reasonableness. Quotations must be submitted by April 16, 2026, at 5:00 PM Eastern Time to jeffrey.rozema@va.gov, with this RFQ serving as the only solicitation document.

This solicitation is not set-aside for small business due to the nonmanufacturer rule, as Guldmann lifts are manufactured in Denmark and the SBA has not waived the rule for patient lifts under NAICS 339113. The current contractor is Guldmann, with Premier Medical Distributors, LLC identified as the only authorized SDVOSB dealer for Guldmann products involving installation services. No specific budget range or award value is disclosed in the solicitation documents. All work must be completed within 180 calendar days of receipt of order, with deliveries occurring in batches determined by the medical center, and the contractor must replace 128 end-of-life ceiling lift systems across various hospital departments. The place of performance is the Dayton VA Medical Center located at 4100 West 3rd Street, Dayton, Ohio 45428.

Notice text

Combined Synopsis-Solicitation for Commercial Products and Commercial Services

Dayton VA Medical Center

Guldmann Patient Ceiling Lift Motors

Effective Date: 01/15/2026

Revision: 03

Description

This is a combined synopsis/solicitation for commercial products and commercial services prepared in accordance with the format Revolutionary FAR Overhaul (RFO) in Federal Acquisition Regulation (FAR) subpart 12.202, Streamlined Procedures for Evaluation and Solicitation for Commercial Products and Commercial Services, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation document will not be issued.

This solicitation is issued as an RFQ. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2026-01 effective March 13, 2026.

This solicitation is not set-aside for small business.

The associated North American Industrial Classification System (NAICS) code for this procurement is 339113 Surgical Appliance and Supplies Manufacturing, with a small business size standard of 800 employees.

The FSC/PSC is 6515 Medical and Surgical Instruments, Equipment, and Supplies.

The Department of Veterans Affairs, Regional Procurement Office Central, Network Contracting Office 10, 5500 Armstrong Road, Battle Creek, MI 49037 is seeking to purchase Guldmann GH3+ patient ceiling lift motors including installation for the Dayton VA Medical Center located at 4100 West 3rd Street, Dayton, OH 45428.

All interested and qualified companies shall provide quotations for the following:

Supplies/Services

Line Item

Description

Quantity

Unit of Measure

Unit Price

Total Price

0001

Guldmann GH3+ 605lbs SWL Hoist w/Scale CLM and Hanger Bar

127

EA

0002

Guldmann GH3+ Twin 1100lbs SWL Hoist w/Scale & Hanger Bar

1

EA

0003

Certified Installation - Hoist Replacement and Weight Test (includes Twin Swap)

128

EA

Statement of Work

Background

Dayton VAMC is soliciting quotes for a contractor to provide all labor and materials to replace 128 end of life ceiling lift systems. Various lift weight capacities are required. New units to match existing lifts in the hospital to avoid misuse of unfamiliar equipment and allow for patient transfer between different lifts using a mutually compatible sling.

Scope

Contractor will provide equipment and services listed in this statement of work.

The Contractor will provide all necessary supplies, materials, equipment, qualified personnel, supervision, management, and transportation.

All work is to be performed in accordance with the guidelines established by Federal, State, and local ordinances and The Joint Commission. The Contractor s work procedures and quality control procedures shall conform to these guidelines.

Specific Tasks

Replacement of 128 lift motors as detailed in Tables A-B. All lifts to undergo Certified Installation - Hoist Replacement and Weight Testing.

Table A. GH3+ 605lbs SWL Hoist w/Scale & Hanger Bar

CLC Main Tower

Quantity: 38

5D126-330

5C113-330

5C117-330

5C12-330

5D101-330

5D104-330

5D117-330

5C118-330

5C119-330

5C127-330 (2x)

5C127-330

5C128-330

5C129-330

5C130-330

5C133-330

5C137-330

5C138-330

5C141-330

5C142-330

5C143-330

5C144-330

5C145-330

5C147-330

5D107-330

5D108-330

5D109-330

5D116-330

5D118-330

5D122-330

5D140-330

5D130-330

5D131-330

5D132-330

5D133-330

5D134-330

5D136-330

5D138-330

CLC Building

Quantity: 47

1A174-320

1E124-320

1A110-320

1A113-320

1A118-320

1A120-320

1A122-320

1A126-320

1A129-320 (2x)

1A133-320

1A134-320

1D166-320

1A137-320

1A141-320

1A159-320

1A162-320

1A163-320

1A166-320

1A167-320

1A171-320

1A176-320

1B120-320

1B137-320

1B138-320

1B141-320

1B159-320

1B162-320

1B166-320

1B170-320

1B174-320

1B175-320

1C111-320

1C115-320

1C117-320

1C118-320

1C120-320

1C121-320

1C122-320

1C123-320

1C124-320

1C136-320

1C138-320

1C139-320

1C140-320

1C141-320

1C142-320

Dental Clinic

Quantity: 1

2B132-330

Emergency Department

Quantity: 1

1G105-310

GI Clinic

Quantity: 1

GI125-330

MED 1 Unit

Quantity: 20

4C132-330

4C145-330

4C111-330

4C112-330

4C116-330

4C118-330

4C122-330

4C130-330

4C131-330

4C134-330

4C136-330

4C139-330

4C141A-330

4C146-330

4C147-330

4C148-330

4C150-330

4C152-330

4C153-330

4C154-330

Radiation Oncology

Quantity: 2

1-322

30-322

Radiology

Quantity: 3

1B114-330

1B115-330

1B123-330

Renal Clinic

Quantity: 1

3C159-330

SAM Unit

Quantity: 7

3D111-330

3D134-330

3D137-330

3D119-330

3D121-330

3D133-330

3D142-330

Simulation Center

Quantity: 6

114-315

116-315

118-315

119-315

120-315

124-315

Table B. GH3+ Twin 1100lbs SWL Hoist w/Scale & Hanger Bar

Morgue

Quantity: 1

2E142-310

Disposal of old systems being removed from service.

Provide education and training:

One session of training for biomedical engineering staff.

Training must include each new type of equipment and sling used in an area.

Perform weight and function testing for each lift after installation in compliance with the VHA checklist required by Patient Safety Alert AL14-07. Each checklist shall be provided to Contracting Officer Representative within 7 days of installation along with any checklist required by the manufacturer. Any changes in inspection requirements during the period of installation will be communicated to the Contractor immediately.

Provide the below deliverables.

Electronic copies of the user manuals and repair manuals for each different model of lift installed under this order or contract at no additional cost to the government

This is a brand-name only solicitation for Guldmann GH3+ patient ceiling lifts/lift systems, which include equipment and installation for the Dayton VAMC.

System Specifications:

Each handset must have an integrated scale for patient weight built into the handset controller without compromising bed to hangar bar height and the ability to be safely secured to the lift when not in use.

The lift hand control must be attached to the lift hanger bar to avoid it from coming dislodged when not in use, potentially causing patient and/or healthcare worker injury.

A wide range of mounting options (such as a lift system which can offer a combined wall and ceiling mount configuration) to accommodate the various patient room environments which exist within our facility.

The ability for full XY coverage in all patient care rooms, including therapy areas and maximum coverage in patient bathrooms.

Operation of the system must allow for a minimum of 24 lifting height for transfer of patient from wheelchair/exam table/toilet, as well as adequate lifting height for the turning and repositioning of the patient on the exam table or lowering height for fall recovery off the floor.

The hanger bars must be able to be changed out by the medical center s staff without the assistance of contractors, vendors, or special tools.

Hangar bars must have 2- or 4-point hooks with secondary security measures, such as a steel or metal clip or double hook.

Lift systems must have software that allows for automatic tracking of preventative maintenance requirements as outlined in the National Patient Safety Alert AL 10-07 (2014). Tracking data must include the following: when service is next due, number of weighings, total lifetime lifts, dates of last timing belt and battery change and number of lifts since reset.

Technology that allows lift data to be viewed in Excel such as day & time of lifts, how long transfers are taking, height of the transfers, & weight of the transfers

Emergency stopping device.

The emergency lowering feature must be operable without the use of any additional tools and the lift motor must be able to be reset by staff without any additional tools, allowing immediate use of the lift after activation of the emergency stop/lowering feature, without the need to call engineering or the manufacturer to reset the lift.

Safety device that stops the motor lifting when batteries are low.

Lifting speed options up to 60mm/sec must be available.

Plug and play technology must be employed to facilitate ease and reduced costs in system repairs and maintenance, one person replacement on current rail system.

The hoist must maintain a continuous charge on the rail.

Operation of the system must be smooth with no fast or jerky starts and stops.

Ceiling lifts shall meet all Underwriters Laboratory requirements, life safety codes, national electric codes, fire safety codes, and all other applicable federal, state and local codes. Appropriate documentation should be provided.

Ceiling lifts shall comply with ISO 10535 (Hoists for the transfer of disabled persons Requirements and test methods).

Ceiling lifts must include a 2-point hanger bar, suitable and allowable for use with the full range of loop-based Guldmann slings, with 2 hooks facing different directions on each end of the bar and without easily breakable parts such as rubber flaps.

The lifts shall be mounted (using ceiling, wall, or floor support as determined by building structure and room covering layout needs) to provide lifting capability for the maximum area possible within each room which means wall to wall not just over the bed.

Lifts must be capable of picking patients up off the floor.

Lifts must not beep or flash during normal operation.

Lifts must be able to lift a full-capacity load at least 21 times on a full, new battery charge.

Ceiling lift motors shall be capable of lifting a weight no less than as specified in the replacement and installation tables.

New lifts shall accept generic type replacement batteries without voiding any warranties.

Motors shall be GFCI protected.

Ceiling lifts vertical motion must be motorized.

Ceiling lifts that connect from one room to another must be designed so that they cannot come off the rail system while in use, and the connecting rail and the systems in both rooms must all hold at least as much weight as the lift motor.

Ceiling lifts must recharge automatically, by recharging at any location on the rail without employee action.

Ceiling lifts must include safeguards to prevent patients from being trapped or hurt, such as emergency stop buttons and emergency lowering devices in case of power failure. Use of emergency lowering devices must not require tools or ladders.

Performance Monitoring

Healthcare Technology Management (HTM) will complete incoming inspection of the delivered units per manufacturer guidelines. Project COR and Patient Safe Handling and Mobility will monitor the project and coordinate installations with contractor personnel.

Security Requirements

The C&A requirements do not apply, and a Security Accreditation Package is not required.

Government-Furnished Equipment (GFE)/Government-Furnished Information (GFI)

N/A

Other Pertinent Information or Special Considerations

All work shall be in direct compliance in accordance with the VHA Safe Patient Handling and Mobility Directive 1611 (7/11/2023), and National Patient Safety Alert AL 14-07 (2014).

Equipment and supplies must not be shipped before designs are approved and contractor has approval to install. Dayton VAMC cannot store uninstalled equipment for a significant length of time.

All contractors must pass VA adjudication and credentialing process.

All employees and subcontractors must wear a visible name and company identification when onsite. When more than one person is onsite performing work under this contract, one must be designated as a supervisor and must be fully responsible for the work to be performed.

Contractor personnel must conduct their work so as not to interfere with the normal functioning of the facility and will stop work if asked by Dayton VAMC personnel. Hours of work will need to be limited to daytime on units where patients sleep or to nighttime or weekends in areas where patients would be exposed by daytime work.

The Contractor shall take all precautions necessary to protect the lives and health of occupants of the building.

The Contractor must follow procedures required by Dayton VAMC Infection Control personnel and the construction safety committee, to include any required dust control specified in the Infection Control Risk Assessment.

The Contractor must state what efforts will be made to minimize noise during installation of equipment.

The Contractor shall immediately correct any fire and safety deficiencies caused by his personnel. If the contractor fails or refuses to correct deficiencies promptly, the Contracting Officer may issue an order stopping all or any part of the work and may hold the contractor in default of the contract.

The Contractor shall comply with applicable Federal, State, and local safety and fire regulations and codes which are in effect at the beginning of the contract period. The contractor shall keep abreast of any changes in these regulations and codes applicable to the contract. The contractor shall keep abreast of any changes in these regulations and codes applicable to the contract.

All material and equipment will be removed from the facility or stored properly at the end of each workday and secured during the workday in the areas specified by the Contracting Officer s Technical Representative.

The Contractor is responsible for supplying, completing, and submitting all reports required or requested by Federal, State, or local ordinances which pertain to any duties contained in the contract.

The Contractor will be required to furnish the Dayton VAMC with material safety data sheets for all chemicals used during installation. This information is required by the VA for emergency treatment in the event of ingestion of and/or contact with the material by humans and is required by OSHA regulations.

The Contractor s onsite lead installer must attend a Dayton VAMC construction safety orientation and supply job hazard analyses as required by Construction Safety Officer to show how hazards to Contractor and VHSO personnel are being minimized.

All Contractor personnel must have OSHA 10-hour construction safety training cards.

The Contractor s personnel shall follow applicable policies of the Dayton VAMC, to include policies concerning fire and disaster preparedness programs.

The contractor shall furnish at his own expense all labor, materials, machinery, and appliances which may be necessary or appropriate in the performance of this contract.

All accumulated rubbish is to be collected and placed in the dumpster provided by the Government. Large quantities need to be disposed of in ways that do not overload the dumpsters.

The contractor must have visited the sites and assessed the structure of each ceiling lift location to ensure safe installation of the equipment and shall supply the installation plans to the Dayton VAMC HTM Service, who must accept them before installation.

Ceiling lift installations shall comply with NFPA 13 for fire sprinklers and with NFPA 99 and NFPA 70 for proper grounding and bonding and access to electrical and safety systems.

The contractor should not require movement of any lights, sprinklers, televisions, or other fixtures in order to install ceiling lifts. If movement of preexisting fixtures is unavoidable, the contractor must include such notice when the bid is submitted.

Wall mounted lifts are acceptable in the place of ceiling mounts where they are more effective or cause less risk to install.

Ceiling lifts must not add obstacles or impair any normal operations in patient care rooms.

It is permissible to raise the lifting height or extend the range of a lift system that is being replaced, so long as designs are approved by the facility in advance and all obstacles are avoided to avoid interference with the operation of curtains, ventilation, or other moving or ceiling mounted items.

All installations that affect existing areas and electrical work shall be coordinated with Dayton VAMC HTM service.

The contractor will install all necessary mounts, braces, and any other components needed for full lift function and safety.

Changes to Statement of Work: Any changes to this SOW shall be authorized and approved only through written correspondence from the CO. A copy of each change will be kept in a project folder along with all other products of the project. Costs incurred by the contractor through the actions of parties other than the CO shall be borne by the contractor.

Reporting Requirements: The VHA checklist and any manufacturer s checklist are the sole report and must be provided to the COR within 1 week of installation. Lift installation is not considered complete and cannot be paid for until the checklist is complete and provided to the COR.

Risk Control

Contractor will be installing units in an active healthcare environment and will be required to comply with VAMC required above ceiling work permits, infection control procedures, and all OSHA requirements.

Place of Performance

Dayton VAMC

4100 W. Third Street

Dayton OH 45428

Period of Performance

All work shall be completed and in compliance within 180 calendar days from the contractor s receipt of the order. If for any reason any deliverable cannot be delivered within the scheduled time frame, the contractor is required to explain why in writing to the CO, including a firm commitment of when the work shall be completed. This notice to the CO shall cite the reasons for the delay, and the impact on the overall project. The CO will then review the facts and issue a response, in accordance with applicable regulations.

Delivery Schedule

Delivery to take place in batches with batch size to be determined by Dayton VAMC to prevent storage demands exceeding the capacity of Dayton VAMC s warehouse space.

Delivery FOB Destination and installation no later than 180 days after receipt of order (ARO).

Place of Performance/Place of Delivery

Address:

Department of Veterans Affairs

Dayton VA Medical Center

4100 West 3rd Street

Dayton, OH

Postal Code:

45428

Country:

UNITED STATES

All quoters shall submit the following:

Price quote.

Documentation from the OEM, Guldmann, Inc., indicating your company is an authorized supplier and installer for Guldmann lifts.

All quotes shall be sent to the Contracting Officer, Jeffrey Rozema, via email at jeffrey.rozema@va.gov.

Award will be based on the lowest price for the exact items listed above.

Offerors must complete annual representations and certifications electronically via the System for Award Management (SAM) website located at https://sam.gov/.

To facilitate the award process, all quotes must include a statement regarding the terms and conditions herein as follows:

"The terms and conditions in the solicitation are acceptable to be included in the award document without modification, deletion, or addition."

OR

"The terms and conditions in the solicitation are acceptable to be included in the award document with the exception, deletion, or addition of the following:"

Quoters shall list exception(s) and rationale for the exception(s), if any.

Submission of your response shall be received not later than 5:00 PM Eastern Time, Thursday, April 16, 2026, by email at jeffrey.rozema@va.gov.

Late submissions shall be treated in accordance with the solicitation provision at FAR 52.212-1(f).

Any questions or concerns regarding this solicitation should be forwarded in writing via e-mail to the Point of Contact listed below.

Point of Contact

Point of contact for this solicitation is Jeffrey Rozema, Contracting Officer, email: jeffrey.rozema@va.gov.

Files

Notice history

Notice Type Posted
6515--Guldmann Patient Ceiling Lifts Motors Award Award Notice
This notice Latest solicitation Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
C1DA-- AE Replace Elevators 539-24-102 Cincinnati VA Medical Center 3200 Vine Street · NAICS 541330 Veterans Integrated Service Network 10 Service-Disabled Veteran-Owned Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity