506-18-1-1527-0016 - Medrad Service Contract Perform preventive maintenance and unlimited emergency repairs on the Government owned MedRad angiographic injectors

Award Notice Posted

Solicitation number
VA25017Q0998
Agency
Awarded
to Imed Biomedical Inc.
Set-aside
Service-Disabled Veteran-Owned Small Business

Opportunity facts

Contract number
VA25017C0224 Federal contract award
NAICS code
811219 Other Electronic and Precision Equipment Repair and Maintenance
PSC
Not on record
Place of performance
Ann Arbor VA Medical Center 2215 Fuller Road Ann Arbor, MI 48105 48105 USA

Notice details come from SAM.gov. Updated .

Notice text

The Solicitation for VA250-17-Q-0998 will be posted to FBO NLT 2:00pm EST on 09/15/2017.









Statement of Work



I. SCOPE OF WORK:



The Contractor shall provide all parts, materials, labor, supervision, test equipment, technical manuals and transportation necessary to perform preventive maintenance and unlimited emergency repairs on the Government owned MedRad angiographic injectors listed in Attachment A at the Ann Arbor VA Medical Center located at 2215 Fuller Road, Ann Arbor, MI 48105. The period of performance shall be October 1, 2017 - September 30, 2022.



II. CONFORMANCE STANDARDS:



All services provided under this contract shall be performed in conformance with the National Fire Protection Agency (NFPA), Occupational Safety and Health Administration (OSHA), and Original Equipment Manufacturer standards and specifications.



III. HOURS OF WORK:



A. Hours of Work for preventive maintenance and emergency repairs are defined as Monday through Friday from 8:00am to 5:00pm, excluding federal holidays or as otherwise arranged with the Contracting Officer Representative (COR).



B. The ten holidays observed by the Federal Government are New Year's Day, Martin Luther King Day, President's Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, and Christmas Day. Also, any other day declared by the President of the United States to be a national holiday.



C. Work performed outside of normal working hours of coverage at the request of the COR shall be billed separately.



IV. PREVENTIVE MAINTENANCE:



A. The Contractor shall perform annual preventive maintenance procedures during the contract year as arranged with the COR. Preventive maintenance procedures shall be in accordance with the published preventive maintenance manuals for the equipment listed in the schedule. The Contractor shall utilize the Original Equipment Manufacturer's established procedures and checklists or Contractor-supplied equivalent satisfactory to the COR. A Field Service Report shall be supplied to the COR at the completion of each preventive maintenance procedure. Preventive maintenance procedures shall include, but is not limited to, the following:



1. Cleaning of equipment (not housekeeping).



2. Completing Original Equipment Manufacturer field service updates for operational and reliability engineering change notices.



3. Calibrating and lubricating the equipment.



4. Performing remedial maintenance of non-emergent nature.



5. Testing and replacing faulty and worn parts.



6. Inspecting/replacing electrical wiring and cables for wear and fraying.



7. Inspecting all mechanical components including, but not limited to; cables and mounting hardware, chains, belts, bearings and tracks, interlocks, clutches, and motors for mechanical integrity, safety, and performance to Original Equipment Manufacturer specifications.



8. Returning the equipment to operating condition defined in Original Equipment Manufacturer specifications.



9. Replacing any Original Equipment Manufacturer labels, decals, or warning tags that are not legible.



10. Providing documentation of services performed.



B. The Contractor shall notify the COR of the existence or development of any defects in or repairs to the equipment covered under this contract which the Contractor considers he/she is not responsible for under the terms of the contract (such as operator misuse).



C. All exceptions to the Preventive Maintenance Inspection schedule shall be arranged and approved in advance with the COR.



V. EMERGENCY REPAIR SERVICE:



A. Service shall consist of maintaining the equipment in accordance with the Conformance Standards Section (Section II). Repair service shall consist of replacing parts, calibration, cleaning, oiling, adjusting and maintaining the equipment except those services necessitated by accident, fire or abuse.



B. The Contracting Officer and the COR have the authority to approve/request a service call from the Contractor.



C. Response Time: The Contractor's Field Service Engineer must respond with a phone call to the COR within two (2) hour after receipt of notification in an effort to correct the problem by phone. If the problem can not be corrected by phone, the Field Service Engineer shall commence work (on-site physical response) within twenty four (24) hours after receipt of notification and shall proceed progressively to completion without undue delay.



VI. PARTS:



The Contractor shall furnish all parts as necessary to maintain the equipment, covered by this contract, in accordance with the Conformance Standards Section (Section II). The Contractor stipulates that he/she has ready access to new standard parts (manufactured, supplied by the manufacturer). All parts supplied shall be of current manufacture and have full compatibility with existing equipment. Documentation of intended parts source(s) shall be provided to the COR upon request.



VII. DOCUMENTATION/REPORTS:



The Contractor shall submit a legible field service report, which shall include detailed descriptions of the preventive maintenance inspection or emergency repair services performed, including replaced parts and estimated prices required for the service call. NOTE: Any additional charges to be claimed must have been approved by the COR before service was performed.



VIII. REPORTING REQUIREMENTS:



The Contractor shall report to the Biomedical Engineering Shop, Rm. BB30 or Maintenance & Repair Office, Rm. BB49, to obtain a contractor badge and to log in and out during normal business hours (8:00am 5:00pm). On weekends, holidays, or outside of normal business hours, contractor shall obtain the contractor badge and log in and out with the VA Police, Rm. BB78. This check in and out is mandatory. When the service is completed, the Contractor shall document services rendered on a legible field service report which will be submitted at the time of logging out.



IX. COMPETENCY OF PERSONNEL SERVICING EQUIPMENT:



A. The Contractor's staff shall include a "fully qualified" Field Service Representative assigned to this area and a "fully qualified" Field Service Representative who shall serve as the backup.



B. Fully qualified" is based upon training and on experience in the field. For training, the Field Service Representatives must have successfully completed a formalized training program for the equipment covered under this contract. For field experience, the Field Service Engineers must have a minimum of one (1) year of experience providing preventive maintenance and emergency repair services on the same make and model of equipment covered under this contract.



C. The contractor shall provide written assurance of the competency of their personnel by detailing a list of Field Service Representatives along with applicable training and years of service experience on the specific devices covered in this agreement (Attachment A) and provide Medrad training certificate(s). This information shall be included in the quoted proposal for providing service.



X. TEST EQUIPMENT:



Upon request of the COR, the Contractor shall provide copy of the current Calibration Certification of all test equipment which is to be used by the Contractor to perform service under this contract. Calibration of equipment shall be traceable and in conformance with test equipment Original Equipment Manufacturer standards.



XI. SAFETY REQUIREMENTS:



In the performance of this contract, the Contractor shall take such safety precautions as the COR may determine to be reasonably necessary to protect the lives and health of occupants of the building. The COR shall notify the Contractor of any safety issues and the action necessary to correct these issues. Such notice, when served on the Contractor or his representative at the work site shall be deemed sufficient for the corrective actions to be taken. If the Contractor fails or refuses to comply promptly, the Contracting Officer may issue an order stopping all or part of the work, and hold the Contractor in default.

Attachment A



Injector

SN

Location

EE



Stellant DCB-SCTD

39559

D330

 



Ceiling mount arm

0712/15515

D330

 



Stellant DCB-SCTD

28154

AB80

38190



Stellant DCB-SCTD

30454

D326

48690



Ceiling mount arm

0108/00047

D326

 



Stellant D

35527

D762

55723



Stellant D

39519

D758

62814



Provis DCB-PRO

106067

E746

46703



Provis DCB-PRO

105623

D521

43959



Ceiling mount arm

4061665602

E748

 



Provis

107106

D318

51870



Provis

107728

D319A-1E

51870



SPECTRIS SOLARIS EP

62780

C304-1

69311



SPECTRIS SOLARIS EP

100938

C304-1

72588



MARK 7 ARTERION

3034873100544/100335

E747A-1

70519



MARK 7 ARTERION

3034672100341/100335

E747-1

70527

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors