4420--SPS Steam Water Heater (Equipment) - VAMC Chillicothe
Closed Solicitation Posted
- Solicitation number
- 36C25026Q1040
- Agency
-
Veterans Integrated Service Network 10
Veterans Health Administration, Department of Veterans Affairs
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 333415 Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing
- PSC
- 4420 Heat Exchangers And Steam Condensers
- Place of performance
- Department of Veterans Affairs Chillicothe Vamc Chillicothe, Ohio 45601, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Veterans Affairs Veterans Health Administration, Veterans Integrated Service Network 10, seeks two packaged steam water heaters for the Chillicothe VAMC, with quotations due September 23, 2026. The procurement is set-aside 100% for small business under NAICS code 333415, with a 1,250-employee size standard.
Place of performance is Chillicothe, Ohio (17273 OH-104). Each unit must be factory-assembled, capable of heating 42 GPM of water from 40°F to 140°F with outlet control within 5 degrees of setpoint when supplied 15 PSIG saturated steam, and capable of reaching 180°F for thermal eradication. All wetted parts, including the tube bundle, must be 316 or 316L stainless steel on ASME-stamped units rated for 150 psi working pressure. Control valves must be electronic with BAS interface functionality preferred but not required. The Government will accept delivery schedules exceeding the standard 90-day performance period if the vendor identifies the lead time in its quotation; vendors must notify the contracting officer within 14 calendar days of award if lead times exceed the period of performance. Units must comply with ANSI/AAMI ST108:2023 standards and include foam or fiberglass insulation with steel jacket, mounted on steel support skids with lifting lugs. Equipment delivery is required to Building 23 Warehouse with cut sheets and operations and maintenance manuals. Installation, rigging, setup, commissioning, and testing are excluded from scope. Quotations must include a statement of acceptance or exceptions to all solicitation terms and conditions. Evaluation prioritizes technical capability and past performance over price. The PSC code is 4420; the NAICS code is 333415.
Notice text
2 versions
Update #2 · Latest ·
The purpose of this amendment is to post questions received and provide the facilities responses. The response date and time remain unchanged.
1. DELIVERY / LEAD TIME
SOW paragraph 4 requires all wetted parts to be 316 or 316L
stainless steel on an ASME-stamped packaged unit. Manufacturers we
have approached indicate this is a made-to-order build rather than a
catalog item, with fabrication lead times that may exceed the
90-day period of performance stated in paragraph 11. Will the
Government accept a quoted delivery beyond 90 days after receipt of
order where the vendor identifies the lead time in its quotation,
or should quoters plan to invoke the 14-day notification provision
in paragraph 11 after award?
The facility has indicated either is sufficient. Please submit the most accurate delivery schedule possible with your quote.
2. SCOPE OF "ALL WETTED PARTS"
Please confirm whether the 316/316L stainless requirement extends to
the heat exchanger tube bundle and circulating pump, or whether it
applies to the vessel, connections and wetted piping with a
copper-alloy tube bundle remaining acceptable. Several standard
packaged units meet every other requirement in paragraph 4 but use a
copper U-bend coil or bronze circulator.
Tube-bundle must be stainless steel, as copper piping is not compatible with low conductivity water.
3. CONTROL VALVE CONFIGURATION
Paragraph 4 requires 1/3-2/3 control valves. Please confirm whether
the control valves are to be pneumatic, electronic, or vendor's
choice, and whether any BAS/BMS interface or signal type is required
at the control panel.
Electronic controls. BAS interface functionality (integration is not within scope) would be preferable but not required.
4. SOLICITATION NUMBER IN THE DESCRIPTION
The first paragraph of the attached OPPORTUNITIES-DESCRIPTION 02
document references "solicitation number 36C25026Q1034" and also
refers to providing "a Reverse Osmosis system." The CLIN schedule,
Statement of Work, title and submission instructions all reference
36C25026Q1040 and two packaged steam water heaters. Please confirm
that 36C25026Q1040 is the correct solicitation number and that the
Reverse Osmosis reference is not part of this requirement.
Reverse Osmosis system is a different requirement and not associated with 36C25026Q1040, which is limited to the two packaged steam water heaters.
Paragraph is hereby corrected to:
The contractor shall include all labor, materials, equipment, and shipping to comply with all applicable federal, state, local laws and regulations, and VA regulations as required to provide two packaged steam water heaters as outline in the SOW/SCHEDULE.:
5. INSTALLATION
SOW paragraph 3 states that equipment install and testing are not
within the scope of this contract. Please confirm that the vendor's
responsibility ends at delivery to the Building 23 Warehouse with
cut sheets and O&M manuals furnished, and that no rigging, setting,
startup or commissioning labor is to be priced.
Correct, install and setup is not required.
6. PAST PERFORMANCE
Please confirm the number of past performance references desired,
the relevancy period, and whether commercial references are
acceptable alongside federal references.
Past performance can be reviewed via CPARS. There is no specific number of references required.
7. EXISTING EQUIPMENT
If available, please provide the make and model of the existing
end-of-life units being replaced, and any connection sizes or
physical envelope constraints in the Sterile Processing mechanical
space, so that quoted units can be confirmed as a fit.
Current system is an electric tank-based water heater at end of life. New water heater is being installed parallel to existing prior to cut over. Physical constraints limited to passage through standard height (84 inch) double door.
Update #1 ·
Attachment 1: Combined Synopsis-Solicitation for Commercial Products
Page 1 of
Effective Date: 01/15/2026
Revision: 03
Page 1 of
See Attached OPPORTUNITIES-DESCRIPTION
Files
| File | Type | Posted |
|---|---|---|
| 36C25026Q1040_1.docx | DOCX document | |
| OPPORTUNITIES-DESCRIPTION 02.docx | DOCX document | |
| 36C25026Q1040.docx | DOCX document |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Radiant Heating Panel Replacement | Veterans Integrated Service Network 19 | Total Small Business | |
| Amendment CTX Steam Humidifier | Veterans Integrated Service Network 17 | Service-Disabled Veteran-Owned Small Business | |
| Heater, water, gas | Construction and Equipment | No set-aside | |
| Hubbell water heater | Naval Sea Systems Command | Total Small Business | |
| 16292 Steam Boiler Replacement | Air Force Sustainment Center | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity