4120--Lease vs Purchase RFI for Temporary Chiller Plant Chillers

Closed Special Notice Posted

Solicitation number
36C24124Q0809
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Veterans Affairs (VA) Connecticut Healthcare System, West Haven Campus, has issued a Special Notice requesting information on leasing versus purchasing chillers for a temporary chiller plant facility. The temporary chiller plant will be operational for 3-5 years while the current plant is demolished and a new permanent plant is constructed.

The purpose of this Special Notice is to gather pricing and terms from vendors on various acquisition approaches, including short-term and long-term leases, lease-to-purchase options, and outright purchase of four 500-ton air cooled chillers with integral pumps. The VA is seeking details on monthly lease rates, freight costs, labor requirements, maintenance, warranties, trade-in/salvage values, and potential equipment obsolescence. Responses are due by August 30, 2024 at 4:00 pm ET so the VA can determine the most advantageous acquisition method prior to issuing a solicitation for the temporary chiller plant construction contract in September 2024. This Special Notice is for information gathering purposes only and does not constitute a solicitation.

Notice text

REQUEST FOR INFORMATION LEASE VERSUS PURCHASE OF CHILLERS FOR TEMPORARY CHILLER PLANT: The VA Connecticut Healthcare System, West Haven Campus, located at 950 Campbell Avenue, West Haven, CT, will soon have a requirement for a firm fixed price construction contract to construct a temporary chiller plant facility. It is anticipated that this temporary chiller plant will be operational for a period of three to five years while the current chiller plant is demolished, and a new plant is constructed for permanent operation. This temporary chiller plant facility will require four (4) 500 ton air cooled chillers with integral pumps.

Federal Acquisition Regulation (FAR) Part 7.401, Acquisition Considerations, requires agencies to acquire equipment using the method of acquisition most advantageous to the Government based on a case-by-case analysis of comparative costs and other factors. To determine the most advantage method of obtaining the required chillers for this temporary facility, the following information is requested:

Lease Option: Four (4) 500 ton air cooled chillers with integral pumps. All other requirements provided by others:

Short term rental or lease 3 years cost per month.

Long term rental or lease 5 years cost per month.

Freight Delivery for rental or lease.

Freight Return for rental or lease.

Labor required for delivery for rental or lease.

Labor required for return for rental or lease.

Maintenance requirement for rental or lease is it included or require a separate contract?

Does to VA perform preventative maintenance requirements? If so, add training costs.

Payment requirements for rental or lease.

Cancellation, extension and early return conditions and fees for 3 year rental or lease.

Cancellation, extension and early return conditions and fees for 5 year rental or lease.

Lease with Option to Purchase: Four (4) 500 ton air cooled chillers with integral pumps. All other requirements provided by others:

All costs associated with paragraph 1 above with a purchase price after 3 years.

All costs associated with paragraph 1 above with a purchase price after 5 years.

Purchase: Four (4) 500 ton air cooled chillers with integral pumps. All other requirements provided by others:

Net purchase price.

Freight delivery for purchase.

Available warranties length and details of what is covered.

Maintenance requirements for warranties.

Training and O&M Manuals

Service contract availability for purchased equipment.

Useful life expectancy for purchased equipment.

Trade in or salvage value after 3 years.

Trade in or salvage value after 5 years.

Potential obsolescence of the equipment if purchases due to imminent technological improvements.

A response is requested by August 30, by 4:00 pm ET, so that the Government can analyze the responses and make a determination of lease versus purchase prior to the solicitation for the construction of the temporary chiller plant, which is anticipated in September 2024. Please provide the requested information via email to Contract Specialist Judith.Ruggiero@va,gov. Subject line to read Lease versus Purchase Chiller Equipment .

DISCLAIMER

This request for information is issued solely for information and planning purposes only and does not constitute a solicitation. In accordance with FAR 15.201(e), responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. Responders are solely responsible for all expenses associated with responding to this notice.

Files

File Type Posted
36C24124Q0809.docx DOCX document

Similar open opportunities

Opportunity Agency Set-aside Responses due
Rental of two chillers for one year Asheville, North Carolina 28805, United States · NAICS 238220 Veterans Integrated Service Network 6 Service-Disabled Veteran-Owned Small Business
Z2NZ--Turn Key Chiller Equipment (Purchase and Install) NAICS 238220 Veterans Integrated Service Network 16 No set-aside
CON | Z1DA | replace or chillers | 580-23-105 | solicitation Houston, Texas 77030, United States · NAICS 238220 Veterans Integrated Service Network 16 Service-Disabled Veteran-Owned Small Business
Chiller NAICS 333415 Land and Maritime No set-aside
Construction of Chilled Water Plant and Site Utility Upgrades at VA Medical Center in West Haven, CT West Haven, Connecticut, United States · NAICS 236220 ENDIST New England No set-aside