30 Day noise and vibration monitoring campaign at Stennis Space Center (SSC).

Closed Special Notice Posted

Solicitation number
80NSSC26935569Q
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Stennis Space Center, Mississippi 39529, United States

Notice details come from SAM.gov. Updated .

About this opportunity

NASA/NSSC announced a sole source intent for a 30-day noise and vibration monitoring campaign at Stennis Space Center, with responses due by 12:00 p.m. Central Standard Time on August 12, 2026. The Government has determined that HGC Noise Vibration Acoustics, Inc. is the sole provider capable of performing this requirement under FAR 12.102(a) authority for commercial items and services.

The campaign requires deployment, operation, and retrieval of 73 monitoring systems—38 sound level stations and 35 triaxial vibration stations—across 16 SSC buildings plus outdoor monitoring at New Enterprise Park. Multi-floor instrumentation is required in buildings B1111, B1021, and B8000. The contractor must install all systems within a five-day deployment window, conduct 30 days of continuous monitoring, and retrieve equipment within two weeks. Performance metrics include 95 percent data availability per station, 100 percent pre-deployment calibration verification, 90 percent telemetry uptime, and final report delivery within 4–6 weeks post-retrieval. Deliverables include deployment and status summaries, raw and processed datasets, noise and vibration maps, event-aligned test summaries synchronized with NASA engine test logs, and a final technical report with recommendations followed by presentation to NASA personnel.

Interested organizations may submit written capabilities and qualifications to demonstrate whether the Government should conduct this procurement on a competitive basis. NASA reserves discretionary authority to proceed with sole source award or convert to full and open competition. NAICS 541690; PSC Y1BG.

Notice text

NASA/NSSC has a requirement for 30 Day noise and vibration monitoring campaign at Stennis Space Center (SSC). See the attached SOW and capability statement for full details. 

All correspondence must reference the notice ID in the subject line to ensure visibility. 

THIS IS NOT A REQEST FOR QUOTES.

Files

File Type Posted
tab 04 SOW.pdf PDF
Tab 07 Capability Statement.pdf PDF

Similar open opportunities

Opportunity Agency Set-aside Responses due
Ground Recording System (GRS) United States · NAICS 334515 Armstrong Flight Research Center Total Small Business
Support design and structural analysis for Hiwrap, MBARS, CRS and COSSIR instruments on the NASA WB57 aircraft NAICS 541715 Shared Services Center No set-aside
Repair and replacement of existing MTS lab Equipment Hampton, Virginia 23681, United States · NAICS 334519 Shared Services Center No set-aside
Vision Procurement - CDAS expansion for KSC Launch Command Center United States · NAICS 541512 Shared Services Center 8(a) Sole Source
nTop License Renewal United States · NAICS 513210 Shared Services Center No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors