Performance Work Statement – NASA Stennis Space Center 30-Day Acoustic and Vibration Monitoring Campaign
This Performance Work Statement (PWS) defines requirements for a comprehensive 30-day noise and vibration monitoring campaign at NASA's Stennis Space Center (SSC) to quantify acoustic and ground-borne vibration exposure from rocket engine testing operations. The Contractor shall deploy, operate, and retrieve 73 total monitoring systems consisting of 38 sound level monitoring stations and 35 triaxial vibration stations across 16 SSC buildings (B2204, B3418, B3205, B3226, B4400, B4010, B1111, B1021, B3308, B3305, B8000, B8100, B9166, B9324, B5100, and a new potential lab location) plus outdoor monitoring at the New Enterprise Park location. Multi-floor instrumentation is specifically required in buildings B1111, B1021, and B8000. All sensors must capture very high acoustic pressure levels with broad frequency response; wired telemetry for health monitoring and remote data retrieval; solar power for outdoor systems and mains power for indoor systems.
The Contractor is responsible for all labor, equipment, transportation, tools, and technical resources required for system preparation, calibration, synchronization, installation (within a five-day deployment window), continuous monitoring over 30 days, equipment retrieval (within two weeks of data collection), and comprehensive reporting. Performance is evaluated against Technical Performance Measures including ≥95% data availability per station, 100% pre-deployment calibration verification, ≥90% telemetry uptime, all required floors instrumented, and final report delivery within 4–6 weeks post-retrieval. Deliverables include deployment summary, mid-deployment status update, raw and processed measurement datasets, noise and vibration distribution maps, event-aligned test summaries synchronized with NASA engine test logs, and a final technical report with methodology, analysis results, building assessments, and recommendations, followed by a presentation to NASA personnel. NASA shall provide building access, escorting, safety training, badging, power access for indoor systems, equipment staging workspace, and daily engine test logs.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Tab 07 Capability Statement.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Overview
NASA requires a comprehensive 30 Day noise and vibration monitoring campaign at Stennis Space Center (SSC) to quantify acoustic and ground-borne vibration exposure resulting from rocket engine testing operations. SSC conducts 1–5 engine tests per day, each lasting up to eight minutes, producing significant airborne noise, acoustic loading, and vibration across the center that may aƯect building components and personnel.
The Contractor shall provide all labor, materials, equipment, analysis, and reporting necessary to design, install, monitor, and remove acoustic and vibration instrumentation across multiple SSC facilities and at the Enterprise Park site.
2. Required Outcomes
The Contractor shall deliver the following measurable outcomes:
2.1 Comprehensive Measurement Data
• Continuous measurement of indoor and outdoor noise and ground vibration levels at all specified buildings and locations for the duration of 30 days.
• Multi-floor acoustic measurements in buildings with multiple stories (B1111, B1021, B8000).
• Collection of spectral, time-history, and statistical data suƯicient to assess acoustic loading and vibration transmission.
2.2 Facility-Specific Impact Assessment
• Quantitative assessment of acoustic and vibration exposure levels at each monitored building.
• Analysis of external acoustic loading and potential structural implications.
• Building-to-building comparison assessing influence of structure type and foundation.
2.3 Site-Wide Acoustic & Vibration Mapping
• Development of noise and vibration distribution maps integrating indoor and outdoor measurements.
• Inclusion of data for both existing and future development sites (e.g., Enterprise Park and proposed lab location).
2.4 Final Technical Report
• A complete report summarizing methodology, deployment, equipment, data, analysis results, building assessments, and recommendations.
• Event-based summaries synchronized with the NASA engine test log.
• Identification of trends related to test stand operations and environmental conditions.
3. Performance Indicators
The Contractor’s performance shall be evaluated using the following indicators:
3.1 Data Quality Indicators
• Less than 5% data loss per instrument during the monitoring period.
• All sensors calibrated within manufacturer-verified tolerances prior to deployment.
• Continuous system uptime verified by site visits.
3.2 Deployment & Retrieval Indicators
• All instruments installed, verified, and operational within the five-day deployment window.
• Complete removal and data retrieval at the end of the 30 day period with no equipment left on site.
3.3 Reporting Indicators
• Delivery of the final report within 4–6 weeks after monitoring concludes.
• Inclusion of all required technical analyses, maps, and event-synchronized summaries.
4. Technical Performance Measures (TPMs)
TPM Requirement Acceptable Threshold
Data Capture Completeness
Continuous sound & vibration data from all stations
≥ 95% data availability per station
Calibration Accuracy Instruments calibrated pre-deployment
100% instruments pass verification
Telemetry Reliability Remote health monitoring capability ≥ 90% telemetry uptime
Multi-Floor Coverage Correct installation in B1111, B1021, B8000
All required floors instrumented
TPM Requirement Acceptable Threshold
Reporting Timeliness Final report delivery 4–6 weeks post-retrieval
5. Performance Requirements
5.1 Measurement Locations
The Contractor shall install and operate acoustic and vibration instrumentation inside and outside the following SSC buildings:
• B2204
• B3418
• B3205
• B3226
• B4400
• B4010
• B1111 (first and top floors)
• B1021 (first and top floors)
• B3308
• B3305
• B8000 (first and top floors)
• B8100
• B9166
• B9324
• B5100
• New potential lab location
5.2 Additional Measurement Sites
• Outdoor monitoring station(s) at the New Enterprise Park location as shown in provided mapping materials.
5.3 Instrumentation Requirements
The Contractor shall provide:
38 sound level monitoring stations and 35 triaxial vibration stations (total 73 systems).
Sensors capable of capturing very high acoustic pressure levels with broad frequency response.
Wired telemetry for health monitoring and remote data retrieval.
Solar power for outdoor systems; mains power for indoor systems.
5.4 Deployment Requirements
• Personnel shall complete preparation, calibration, and synchronization of all systems.
• Contractor shall complete installation within up to five days.
• Full deployment logs shall be maintained including serial numbers, mounting locations, and power configurations.
5.5 Monitoring & Maintenance Requirements
• Contractor shall monitor system status through telemetry as required to verify functions and correct issues.
5.6 Retrieval Requirements
• Contractor shall remove all equipment within 2 weeks of Data Collection.
• All local data shall be downloaded and verified.
• NASA will supply workspace for packing and staging.
6. Inspection & Acceptance Criteria
• NASA will inspect and accept services upon verification that:
All specified locations were instrumented correctly.
• Multi-floor measurements were completed in B1111, B1021, and B8000.
• Data completeness thresholds were met per TPMs.
• Final report meets all Required Outcomes and includes all requested analyses.
7. Data and Reporting Requirements
The Contractor shall deliver:
• Deployment summary
• Mid-deployment status update
• Full measurement dataset (raw + processed)
• Noise and vibration maps
• Event-aligned test summaries
• Final technical report (PDF + native files if applicable)
• Presentation/briefing to NASA personnel
8. Risk & Safety Requirements
• Contractor shall comply with NASA-provided PPE, site access rules, and safety training.
• Contractor shall follow all NASA SSC safety, electrical, and outdoor equipment requirements.
• No work may begin until safety orientations are completed.
9. Government Responsibilities
NASA shall provide:
• Access to all listed buildings and outdoor areas.
• Required escorting, safety training, and badging.
• Access to power for indoor systems.
• Workspace for equipment staging.
• Daily engine test logs synchronized with test operations.
10. Contractor Responsibilities
The Contractor shall:
Provide all labor, equipment, transportation, tools, and technical resources.
Ensure system calibration and accuracy.
Ensure secure handling of data and documentation.
Meet all performance indicators and TPM thresholds.
Deliver all required reports and briefings.