Hwy 24 Bypass Bush Hog and Clear Vegetation

Closed Solicitation Posted

Solicitation number
N4008519Q8056
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
561730 Landscaping Services
PSC
S Utilities And Housekeeping

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

SCOPE OF WORK: The contractor shall provide all material, labor, equipment and

supervision required to accomplish the following:

GENERAL DESCRIPTION: Remove vegetation for location listed below. All

measurements furnished in this scope of work are “approximate†and are for reference

only. Actual precise measurements shall be field verified by the contractor.

1. Hwy 24 Bell Fork Rd foot bridge to Wilson Blvd (approximately 6 miles) (see

reference map highlighting in green for fence lines)

DETAILED REQUIREMENTS AND SPECIFICATIONS:

1. The contractor shall clear vegetation on BOTH sides of the fence line on Hwy 24

(Base property side only). Fence lines are indicated with a green line along highway, per

reference map.

Fence must be kept clear of visual obstruction such as vines, shrubs, trees,

etc. Vegetation in these areas shall be cut not to exceed height of 2 – 4 inches to the

ground so that future maintenance can be accomplished with a tractor mower (bush hog).

2. Upon completion of work, there shall be a 20 feet clear zone on the inside perimeter

fence and 10 feet outside of fence not to exceed total 30 feet wide.

3. Vegetation that cannot be bush hogged or mowed shall be weed eat.

4. The contractor may remove vegetation that is cut, OR mulch vegetation and discard

into surrounding wood line a minimum of 10 feet, ensuring not to leave in piles or

discard into drainage ditches.

5. All grounds disturbed within working area shall be repaired by filling with clean

topsoil, raking, and reseeding with Coastal Lawn Mix applied at a rate of 50 pounds/acre.

6.

Disturbed areas include but are not limited to ruts, holes, gouges, scrapes, scratches

and tire tracks.

7. The contractor shall remove all trash within working areas and deposit at Base

Landfill.

8. Call POC: Jay Maddox (w) 450-1038 (c) 330-0512 Email: jay.maddox@usmc.mil

letting him know work start date and schedule.

SPECIAL INSTRUCTIONS:

Vegetation that cannot be mulched shall be weighed at the Base Sanitary Landfill located

on Piney Green Road and delivered to the Recycling Center on Piney Green Road (across

from the Landfill). Hours of operation: 0730 AM-1530 PM, Monday through Friday,

except holidays.

Update #1 ·

SCOPE OF WORK: The contractor shall provide all material, labor, equipment and

supervision required to accomplish the following:

GENERAL DESCRIPTION: Bush hog, weed eat and remove vegetation from fence at

various locations listed below:

1. Hwy 24 Bell Fork Rd foot bridge to Wilson Bay (approximately 3 miles, see map)

DETAILED REQUIREMENTS AND SPECIFICATIONS:

1. The contractor shall clear the fence line by cutting vegetation back on the inside of the

fence line 30 feet. Vegetation shall be cut to a height 4†with bush hog or other mowing

equipment.

2. Vegetation that cannot be bush hogged or mowed shall be weed eat.

3. Upon completion of work there shall be a 30 feet clear zone on the inside perimeter

fence and 20 feet outside of fence.

4.

The contractor may remove vegetation that is cut, OR mulch vegetation and discard

into surrounding wood line a minimum of 10 feet, ensuring not to leave in piles or

discard into drainage ditches.

5. All grounds disturbed within working area shall be repaired by filling with clean

topsoil, raking, and reseeding with Coastal Lawn Mix applied at a rate of 50 pounds/acre.

6. Disturbed areas include but are not limited to ruts, holes, gouges, scrapes, scratches

and tire tracks.

7. The contractor shall remove all trash within working areas and deposit at Base

Landfill.

Special Instructions:

Vegetation that cannot be mulched shall be weighed at the Base Sanitary Landfill located

on Piney Green Road and delivered to the Recycling Center on Piney Green Road (across

from the Landfill).

Hours of operation: 0730 AM-1530 PM, Monday through Friday,

except holidays.

Files

File Type Posted
N4008519Q8056_Amend_0001_N4008519Q8056.pdf PDF
198056_solicitation.pdf PDF
198056_map.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors