2019 Clear Vegetation at Various Locations

Closed Solicitation Posted

Solicitation number
N4008519Q8060
Agency
Naval Facilities Engineering Command Department of the Navy, Department of Defense
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
561730 Landscaping Services
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

SCOPE OF WORK: The contractor shall provide all material, labor, equipment and supervision
required to accomplish the following:
GENERAL DESCRIPTION: Contractor shall clear and remove all undergrowth and overhanging
trees, brush/limbs, and vegetation to provide clear line of sight so future maintenance can be
accomplished with afinished mower.
1. Paradise Pt Service Roads (General area of Seth Williams Blvd - See 5 Maps)
(approximately 7.5 miles)
2. Bldg 575 Security Fence (approximately 1,691 LF)
3. Bldg A66 and A11 Security Fence (approximately 2,145 LF)
GENERAL REQUIREMENTS:
1. Vertical cut any brush and limbs that extends into the areas to be cleared up to a height of 10-
12 feet.
All trails shall be cleared of vegetation not to exceed 8 feet from center of asphalt to hard
tree line on BOTH side of trail edge, boardwalks and drainage ditch (total 16 feet clearance) to
the hard tree lines. Trees and brush shall be cut between 2†â€" 6†in height.
2. Hand trim vegetation around bridges, fences, poles and any permanent structures located
within the cleared areas.
3. For this Scope of Work, hard tree line is defined as trees with a diameter greater than 3 inches.
All hard trees lines shall be left in place.
4. All live or dead trees, logs, limbs or branches resting on the ground at the shoulder or in the
drainage ditch shall be placed at least 10 feet into the tree line.
Vegetation that is mulched may
discard into surrounding wood line at a minimum of 10 feet, ensuring not to leave in piles or
discard into drainage ditches. Any vegetation removed from the site shall be removed in
accordance with Special Instructions.
5. Before beginning clearing or cleaning operations, the contractor shall block off with a physical
barrier, such as extended saw horses or caution tape, at all entry points to the work area to keep
personnel from being exposed to the clearing and cleaning operations. Signs shall be posted at
the barriers warning personnel that the area is closed for maintenance. While working on gravel
areas, the contractor shall provide personnel to direct traffic around the work area.
The
contractor shall provide traffic control (i.e. cones, flagman, signs, etc.) sufficient to prevent
injury to personnel, damage to property, and allow for safe flow of traffic. Notify the Base
Provost Marshall’s Office (PMO), 451-3004/3005, prior to detouring or re-routing traffic.
6. All grounds disturbed by the contractor shall be repaired by filling with clean topsoil, raking,
reseeding, grading, and compacting. Seed with Coastal Lawn Mix applied at a rate of 50
pounds/acre. Disturbed areas include but are not limited to ruts, holes, gouges, scrapes, scratches
and tire tracks.
7. Contractor shall remove all trash that is laying within areas where work is being performed on
a daily basis.
The contractor shall clear all dirt, pine straw, and debris over the length of the
entire trail and all debris that will interfere with future mowing operations. No equipment or
material shall be stored on the work site without specific permission from the project manager or
the performance assessment representative (PAR). The contractor shall ensure that all areas and
systems contiguous to the work site remain undisturbed, or are returned to its original condition
and operation as soon as practical.
SPECIFICATIONS FOR PARADISE PT (AMCC):
WO#4879293
1. Contractor shall clear along the Service Roads, Jogging Trails and along Seth Williams Blvd.
a. SERVICE ROADS â€" WOOD LINE side only
b.
JOGGING TRAILS ALONG SETH WILLIAMS BLVD â€" BOTH SIDES
2. Call POC(s): Mr. Jared Sabo (910) 219-6363 or email: Jared.Sabo@atlanticmcc.com letting
him know work start date and schedule.
SPECIFICATIONS FOR BLDG 575 SECURITY FENCE:
WO#4849722-Child tkt
1. PHYSCIAL SECURITY REQUIREMENTS (MCO P5530.14): Fence must be kept clear of
visual obstruction such as vines, shrubs, trees, etc. Vegetation will not exceed 6 inches in height,
Interior clear zone shall not be less than 30 feet trees and/or limbs located outside of and within
15 feet and at least 20 feet outside of perimeter barriers.
2. Call POC(s): Sergeant Kevin Simek 450-5836 letting them know work start date and schedule.
SPECIFICATIONS FOR BLDG A66 and A11 SECURITY FENCE:
WO#4876561 (A66) and WO# 4876563 (A11)-Child tkt
1.
PHYSCIAL SECURITY REQUIREMENTS (MCO P5530.14): Fence must be kept clear of
visual obstruction such as vines, shrubs, trees, etc. Vegetation will not exceed 6 inches in height,
Interior clear zone shall not be less than 30 feet trees and/or limbs located outside of and within
15 feet and at least 20 feet outside of perimeter barriers.
2. Call POC(s): Terry Alexander 440-7759 email: terry.alexander.ctr@socom.mil letting them
know work start date and schedule.
SPECIAL INSTRUCTIONS: Vegetation that cannot be mulched shall be weighed at the Base
Sanitary Landfill located on Piney Green Road and delivered to the Recycling Center on Piney.
Green Road (across from the Landfill). Hours of operation: 0730 AM-1530 PM, Monday
through Friday, except holidays..

Attachments

Files attached to this notice, newest first
File Type Posted
solicitation_198060.pdf PDF
MAP_198060.PDF PDF

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity