2018 Reservoir Spillway Repair, Phillips County, M

Closed Pre-Solicitation Posted

Solicitation number
140L3118Q0023
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Contract number
140L3118P0035 Federal contract award
Awardee
BDJ Partners LLP
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record
More information

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

2018 Reservoir Spillway Repair, Phillips County, Montana.

Update #2 ·

2018 Reservoir Spillway Repair, Phillips County, Montana.

Update #1 ·

This is a pre-solicitation notice only. This is not a Request for Quotes (RFQ) and does not commit the Government to award any contracts now or in the future.
The Bureau of Land Management, Malta Field Office, has a requirement for intends to award a contract to furnish labor, equipment, supplies and materials to repair five (5) reservoirs located in Phillips County, Montana approximately 61 miles south of Malta, Montana.
Big D:
¿ If necessary, dewater reservoir and construction area.
¿ Excavate new spillway to the east of the existing spillway.
¿ Add fill to the top of the embankment.
¿ Plug the existing spillway across the head cut.
¿ Build dike between the existing and new spillway.
¿ Reclaim all disturbed areas including staging areas and temporary roads. Reclamation consists of preparation of the soil for seeding and placement of erosion control mats.
Batosh:
¿ If necessary, dewater reservoir and construction area.
¿ Remove and stockpile existing riprap.
¿ Excavate spillway so that top of riprap is level with crest of the spillway.
¿ Fill cut with compacted embankment.
¿ Build dike along left side of spillway.
¿ Install geotextile on bottom and up sides of spillway.
¿ Spread stockpiled riprap and haul in additional riprap for the bottom and sides of spillway.
¿ Reclaim all disturbed areas including staging areas and temporary roads. Reclamation consists of preparation of the soil for seeding.
Rotator Cup:
¿ If necessary, dewater reservoir and construction area.
¿ Relocate Class III (greater than 24 inch diameter) riprap from the center of spillway to the edges of the base of the spillway.
¿ Fill cuts with compacted embankment.
¿ Build dike along length of left side of spillway.
¿ Grade the length of the right side of spillway to a 3:1 to a height of four feet.
¿ Install geotextile fabric along both banks of spillway and center section currently without.
¿ Place riprap along both banks of spillway and center section.
¿ Reclaim all disturbed areas including staging areas and temporary roads. Reclamation consists of preparation of the soil for seeding.
Rebate:
¿ If necessary, dewater reservoir and construction area.
¿ Fill cuts with compacted embankment. Finished surface shall be smooth.
¿ Build a dike along the left and right sides of the lower 100 feet of the spillway.
¿ Grade dike banks and existing banks of spillway to a smooth surface at a 3:1 slope.
¿ Install Flexamat erosion control mats along both banks for the length of the spillway and upper portion of spillway that does not currently have riprap.
¿ Reclaim all disturbed areas including staging areas and temporary roads. Reclamation consists of preparation of the soil for seeding.
Spanky:
¿ If necessary, dewater reservoir and construction area.
¿ Relocate Class III (greater than 24 inch diameter) riprap from the center of spillway to the edges of the base of spillway.
¿ Fill cut with compacted embankment.
¿ Build a dike along the right side of the spillway.
¿ Grade dike banks and existing banks of spillway to a smooth surface at a 3:1 slope.
¿ Install Flexamat erosion control mats along both banks of spillway.
¿ Reclaim all disturbed areas including staging areas and temporary roads. Reclamation consists of preparation of the soil for seeding.
The government intends to award this contract as a small business set-aside under NAICS code 237990. The corresponding small business size standard is $36.5 million. This project is anticipated to be between $100,000 and $250,000.
The solicitation is tentatively scheduled to be available on or around August 02, 2018 at http://www.fedconnect.net/FedConnect and https://www.fbo.gov. No hard copies of the solicitation will be issued. Please check the solicitation for more information and all required documentation to be submitted.
.

Files

File Type Posted
FedConnect File —

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors