FedConnect File
54 KB Posted
- Solicitation number
- 140L3118Q0023
About this file
Click here to see more information about this opportunity on FedConnect
Text of this file
Opportunity: 2018 Reservoir Spillway Repair, Phillips County, M
Description
This is a pre-solicitation notice only. This is not a Request for Quotes (RFQ) and does not commit the Government to award any contracts now or in the future.
The Bureau of Land Management, Malta Field Office, has a requirement for intends to award a contract to furnish labor, equipment, supplies and materials to repair five (5) reservoirs located in Phillips County, Montana approximately 61 miles south of Malta, Montana.
Big D:
¿ If necessary, dewater reservoir and construction area.
¿ Excavate new spillway to the east of the existing spillway.
¿ Add fill to the top of the embankment.
¿ Plug the existing spillway across the head cut.
¿ Build dike between the existing and new spillway.
¿ Reclaim all disturbed areas including staging areas and temporary roads. Reclamation consists of preparation of the soil for seeding and placement of erosion control mats.
Batosh:
¿ If necessary, dewater reservoir and construction area.
¿ Remove and stockpile existing riprap.
¿ Excavate spillway so that top of riprap is level with crest of the spillway.
¿ Fill cut with compacted embankment.
¿ Build dike along left side of spillway.
¿ Install geotextile on bottom and up sides of spillway.
¿ Spread stockpiled riprap and haul in additional riprap for the bottom and sides of spillway.
¿ Reclaim all disturbed areas including staging areas and temporary roads. Reclamation consists of preparation of the soil for seeding.
Rotator Cup:
¿ If necessary, dewater reservoir and construction area.
¿ Relocate Class III (greater than 24 inch diameter) riprap from the center of spillway to the edges of the base of the spillway.
¿ Fill cuts with compacted embankment.
¿ Build dike along length of left side of spillway.
¿ Grade the length of the right side of spillway to a 3:1 to a height of four feet.
¿ Install geotextile fabric along both banks of spillway and center section currently without.
¿ Place riprap along both banks of spillway and center section.
¿ Reclaim all disturbed areas including staging areas and temporary roads. Reclamation consists of preparation of the soil for seeding.
Rebate:
¿ If necessary, dewater reservoir and construction area.
¿ Fill cuts with compacted embankment. Finished surface shall be smooth.
¿ Build a dike along the left and right sides of the lower 100 feet of the spillway.
¿ Grade dike banks and existing banks of spillway to a smooth surface at a 3:1 slope.
¿ Install Flexamat erosion control mats along both banks for the length of the spillway and upper portion of spillway that does not currently have riprap.
¿ Reclaim all disturbed areas including staging areas and temporary roads. Reclamation consists of preparation of the soil for seeding.
Spanky:
¿ If necessary, dewater reservoir and construction area.
¿ Relocate Class III (greater than 24 inch diameter) riprap from the center of spillway to the edges of the base of spillway.
¿ Fill cut with compacted embankment.
¿ Build a dike along the right side of the spillway.
¿ Grade dike banks and existing banks of spillway to a smooth surface at a 3:1 slope.
¿ Install Flexamat erosion control mats along both banks of spillway.
¿ Reclaim all disturbed areas including staging areas and temporary roads. Reclamation consists of preparation of the soil for seeding.
The government intends to award this contract as a small business set-aside under NAICS code 237990. The corresponding small business size standard is $36.5 million. This project is anticipated to be between $100,000 and $250,000.
The solicitation is tentatively scheduled to be available on or around August 02, 2018 at http://www.fedconnect.net/FedConnect and https://www.fbo.gov. No hard copies of the solicitation will be issued. Please check the solicitation for more information and all required documentation to be submitted.
Overview
Reference number:
140L3118Q0023
Issue date:
07/19/2018
Response due:
09/03/2018 05:00 PM US/Eastern
Set Aside:
Total Small Business
NAICS:
237990
PSC / FSC:
Y1KA-CONSTRUCTION OF DAMS
Agency:
DOI
Contracting office:
BLM CENTRAL MT DISTRICT OFC(MTL000)
920 NE MAIN STREET
LEWISTOWN, MT 59457
Place of Performance:
Phillips County Montana
59538
Contact:
Gina Merwin
Phone:
Fax:
Email:
gmerwin@blm.gov
Vendors conference:
Location:
Details:
What do I do now?
This is the opportunity summary page. To the left you will see a description and an overview of this opportunity.
To the right you will see a list of the attached documentation. To view any of the attachments, simply click the attachment name.
Registered Users
To register interest in this opportunity or to electronically respond, you must first sign in. Click the Sign In button below.
Non Registered Users
You can view this or any other public opportunity. However, registered users have numerous added benefits including the ability to submit questions to the agency, receive emails concerning updates and amendments, create and manage a response team and submit responses directly through this site.
Becoming a registered user is fast, free and takes only a few minutes. To get started, click the Register Now button below.
Documentation
140L3118Q0023
Pre-solicitation Notice
Overview
Solicitation
Overview
140L3118Q0023
B03 DOL Wage Determination
B08 Quote Sheet
A06 2018 Reservoir Spillway Repair Drawings
B08 Experience&PastPerformanceQuestion
B08 SubContractorInfoRequest
A04 2018 Reservoir Repair Specifications
© 2018 Compusearch Software Systems, Inc. All rights reserved.
Terms of Service and Use
About FedConnect
Videos
Help
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it.