Notice text
3 versions
Update #3 · Latest ·
Awarded Vendors: Atlantic Restoration & Development. Contract Award Dollar Amount: 107500. Contract Award Date: 2019-03-22.
Update #2 ·
SCOPE OF WORK: The contractor shall provide all material, labor, equipment and supervision required to accomplish the following:
GENERAL DESCRIPTION: The Contractor shall excavate / remove vegetation and sediment not to exceed culvert depth accumulated in the canal ditch.
1. Start excavating at lowest point (AS5019) end of Perimeter Rd to White St (AS120) to include two small sections indicated on the reference map (approximately 1.7 miles).
DETAILED REQUIREMENTS AND SPECIFICATIONS:
1. Contractor must comply within the Decision Memorandum ER-10-229-DM (see attachment 2).
2. Remove vegetation and sediment not to exceed below existing culvert depth.
3. All removed sediment shall be staged and dried and then hauled to the Base Landfill for disposal in accordance with Special Instructions.
4.
Clear vegetation on both sides of the ditch to where grass cutting contractor begins.
5. Repair eroded areas with a minimum of one-ply straw matting, seed, fertilize and staple
6. Vegetation that is mulched shall be discarded in a manner ensuring not to leave in piles or discard into drainage ditches.
7. Remove and properly dispose of any trash, garbage, paper, plastic, glass, wood, metal and concrete debris from inside of, near, or around the trash rack, inlet and outlet structures, safety benches, aquatic shelves, slopes, embankments, spillways, weirs, forebays and mainbays.
8. Before beginning clearing or cleaning operations, the contractor shall block off with a physical barrier, such as extended saw horses or caution tape, at all entry points to the work area to keep personnel from being exposed to the clearing and cleaning operations.
Signs shall be posted at the barriers warning personnel that the area is closed for maintenance. While working on gravel areas, the contractor shall provide personnel to
direct traffic around the work area. The contractor shall provide traffic control (i.e. cones, flagman, signs, etc.) sufficient to prevent injury to personnel, damage to property, and allow for safe flow of traffic. Notify the Base Provost Marshall’s Office (PMO), 451-3004/3005, prior to detouring or re-routing traffic.
9. All grounds disturbed by the contractor shall be repaired by filling with clean topsoil, raking, and reseeding with Coastal Lawn Mix applied at a rate of 50 pounds/acre. Disturbed areas include but are not limited to ruts, holes, gouges, scrapes, scratches and tire tracks.
10.
Contractor shall remove all trash that is laying within areas where work is being performed on a daily basis. The contractor shall clear all dirt, pine straw, and debris over the length of the entire trail and all debris that will interfere with future mowing operations. No equipment or material shall be stored on the work site without specific permission from the project manager or the performance assessment representative (PAR). The contractor shall ensure that all areas and systems contiguous to the work site remain undisturbed, or are returned to its original condition and operation as soon as practical.
11. Call POC(s): Brian Geller at 449-4550 email: brian.geller@usmc.mil OR Doss Comer 449-5401 email: dosie.comer@usmc.mil letting them know work start date and schedule.
SPECIAL INSTRUCTIONS: Vegetation that cannot be mulched shall be weighed at the Base Sanitary Landfill located on Piney Green Road and delivered to the Recycling Center on Piney Green Road (across from the Landfill).
Hours of operation: 0730 AM-1530 PM, Monday through Friday, except holidays..
Update #1 ·
SCOPE OF WORK: The contractor shall provide all material, labor, equipment and supervision required to
accomplish the following:
GENERAL DESCRIPTION: The Contractor shall excavate / remove vegetation and sediment not to exceed
culvert depth accumulated in the canal ditch.
1. Start excavating at lowest point (AS5019) end of Perimeter Rd to White St (AS120) to include two small sections
indicated on the reference map (approximately 1.7 miles).
DETAILED REQUIREMENTS AND SPECIFICATIONS:
1. Contractor must comply within the Decision Memorandum ER-10-229-DM (see attachment 2).
2. Remove vegetation and sediment back to original grade.
3. All removed sediment shall be staged and dried and then hauled to the Base Landfill for disposal in accordance
with Special Instructions.
4.
Clear vegetation on both sides of the ditch to where grass cutting contractor begins.
5. Vegetation that is mulched shall be discarded in a manner ensuring not to leave in piles or discard into drainage
ditches.
6. Remove and properly dispose of any trash, garbage, paper, plastic, glass, wood, metal and concrete debris from
inside of, near, or around the trash rack, inlet and outlet structures, safety benches, aquatic shelves, slopes,
embankments, spillways, weirs, forebays and mainbays.
7. Before beginning clearing or cleaning operations, the contractor shall block off with a physical barrier, such as
extended saw horses or caution tape, at all entry points to the work area to keep personnel from being exposed to the
clearing and cleaning operations.
Signs shall be posted at the barriers warning personnel that the area is closed for
maintenance. While working on gravel areas, the contractor shall provide personnel to direct traffic around the work
area. The contractor shall provide traffic control (i.e. cones, flagman, signs, etc.) sufficient to prevent injury to
personnel, damage to property, and
allow for safe flow of traffic. Notify the Base Provost Marshall’s Office (PMO), 451-3004/3005, prior to detouring
or re-routing traffic.
8. All grounds disturbed by the contractor shall be repaired by filling with clean topsoil, raking, and reseeding with
Coastal Lawn Mix applied at a rate of 50 pounds/acre. Disturbed areas include but are not limited to ruts, holes,
gouges, scrapes, scratches and tire tracks.
9.
Contractor shall remove all trash that is laying within areas where work is being performed on a daily basis. The
contractor shall clear all dirt, pine straw, and debris over the length of the entire trail and all debris that will interfere
with future mowing operations. No equipment or material shall be stored on the work site without specific
permission from the project manager or the performance assessment representative (PAR). The contractor shall
ensure that all areas and systems contiguous to the work site remain undisturbed, or are returned to its original
condition and operation as soon as practical.
10. Call POC(s): Brian Geller at 449-4550 email: brian.geller@usmc.mil OR Doss Comer 449-5401 email:
dosie.comer@usmc.mil letting them know work start date and schedule.
11.
Number of days to complete the work is 120 days from the date the project is awarded.
SPECIAL INSTRUCTIONS: Vegetation that cannot be mulched shall be weighed at the Base Sanitary Landfill
located on Piney Green Road and delivered to the Recycling Center on Piney Green Road (across from the Landfill).
Hours of operation: 0730 AM-1530 PM, Monday through Friday, except holidays..
Files
| File | Type | Posted |
|---|---|---|
| N40085/N4008519Q8002amend0001198002.pdf | ||
| solicitation19q8002.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Award Notice | |
| MCAS Excavate Veg Canal Street | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity