190th CE FY16 190th CE Fencing Repairs, Forbes Field, Topeka, KS
Award Notice Posted
- Solicitation number
- FMATOC-16-R-0001
- Agency
-
Kansas National Guard
Army National Guard, Department of Defense
- Awarded
- to Mohan Construction, Inc.
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- W912JC12D5312-0016 Federal contract award
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Not on record
- Place of performance
- 190th CE Basewide locations as listed in Bid Items 1- 4., Forbes Field. Topeka, Kansas 66619, United States
Notice details come from SAM.gov. Updated .
Notice text
6 versions
Update #6 · Latest ·
Amendment 4- Proposal Due Date is Revised to Monday, May 23, 2016 at 2:00 pm CT.
The following questions were asked:
Referring to Bid Item 2, Drawing 2, Note: "Re-Install roller gate and receiver"
Bid Item 4, Drawing 1, Note: "Cut fence opening into
brick and remove full depth. Pavement traffic lane will be installed by
other contract. Re-Install Advantor gate and hardware".
Where are the locations preferred/suggested to get power for relocating the
gate motors?
The answer to this question is shown in the new attachment " Gate Power Feed.pdf" which is added to this Solicitation.
Additionally - To be considered responsive to this solicitation, Offerors must provide past performance information. This needs to include Relevant past performance which should include similarity of service/support, complexity, dollar value, and contract type on projects performed within the last 3 years. This can include other MATOC project, other open market projects, other National Guard projects, or projects performed for other agencies.
The offerors should also include information that can be verified to allow the government to determine how well your company has performed on proejcts in the past. This can include contact information for project managers and contracting officers on past projects.
Update #5 ·
AMENDMENT 3 - Due date is revised to May 19, 2016 at 2:00 CT. Additional questions have been received and answers to those questions are pending. Another Amendment will be posted when the answers become available.
THIS PROJECT IS OPEN ONLY TO THE KSARNG AND KSANG APPROVED MATOC CONTRACTORS.
This project is for the 190th CE FY 16 Fencing Repairs.
PRE-BID MEETING will be held on Tuesday, 19 Apr 16 at 10:00 a.m. CST, CE Bldg 760, Classroom Forbes Field, Topeka, KS.
PROPOSALS will be due on Tuesday, May 19, 2016 at 2:00 p.m., CST.
Project Title and Project Description:
PROJECT DESCRIPTION: Submit a bid for each line item of work to be done. The purpose of this contract is to install, modify existing, or replace force protection measures around designated facilities in accordance with UFC 4-022-03. This contract will also repair sections of failing asphalt near the flight line side of building 662. Fence product used will be Type A, galvanized, 2 inch square mesh, woven 9 gauge steel wire fabric chain link fence 7 feet high, surmounted by three strands of barbed wire angled outward at 45 degrees for a total height of 8 feet. Chain-link fabric tautness requirements can be found in UFGS (32 3100.00 10 / 32 31 13.00 20 / 32 31 13.00 40). Provide chain link fencing components and accessories in accordance with ASTM standards F1043, F626, A817, A824, F1083 and F1664. All fencing and components will be commercial grade. Use non-reflective coating for fences to reduce glare that could affect remote camera and visual assessment.
ITEMS AND SPECIFICATION QUANTITY UNIT UNIT PRICES TOTAL PRICE |
Bid 1: POL Fence and 665 Gate Repair 1 LS $ $ |
Bid 2: Flight Line Fence 1 LS $ $ |
Bid 3: AGE Fencing 1 LS $ $ |
Bid 4: 665 Gate Relocation 1 LS $ $ |
ESTIMATED TOTAL: |
Update #4 ·
Amendment 2 dated 05/03/2016:
Question received from Concrete Unlimited Construction, Inc. :
"Are there any design requirements and or details available for the mow strip and the new footings for the brick column?"
Answer provided:
1. All mow strip thicknesses shall be 3.5" minimum thickness. Width shall either match existing in areas that will be repaired/patched or shall be 20" min. with in areas requiring the creation of a new mow strip.
2. At the brick decorative fence, concrete foundation beneath northwest column shall be adequately constructed to fully support the load of the column and the attached fence.
Also in regards to the AT Level I Training requirements - this amendment removes the requirement for Subcontractor employees to complete AT Level I Awareness Training. ONly the general contractor employees will be required to complete the AT Level I Awareness Training.
All other terms, conditions, and deadlines remain unchanged.
Update #3 ·
The following updates are attached and should be reviewed by all offeror's on this project:
Statement of work revised, Dated April 19, 2016- Bid Item # 3 removed in it's entirety.
Wage Determination, revised, Dated 04/15/2016
Pre-Bid Meeting Attendance Roster attached
Notice of Proposed Task Order Proposal, revised April 21, 2016
Due Date is Changed from May 10, 2016 to May 16, 2016
Evaluation factors have been revised. Past Performance is significantly more importmant than Price.
Update #2 ·
THIS PROJECT IS OPEN ONLY TO THE KSARNG AND KSANG APPROVED MATOC CONTRACTORS.
This project is for the 190th CE FY 16 Fencing Repairs.
PRE-BID MEETING will be held on Tuesday, 19 Apr 16 at 10:00 a.m. CST, CE Bldg 760, Classroom Forbes Field, Topeka, KS.
PROPOSALS will be due on Tuesday, 10 May 16 at 2:00 p.m., CST.
Project Title and Project Description:
PROJECT DESCRIPTION: Submit a bid for each line item of work to be done. The purpose of this contract is to install, modify existing, or replace force protection measures around designated facilities in accordance with UFC 4-022-03. This contract will also repair sections of failing asphalt near the flight line side of building 662. Fence product used will be Type A, galvanized, 2 inch square mesh, woven 9 gauge steel wire fabric chain link fence 7 feet high, surmounted by three strands of barbed wire angled outward at 45 degrees for a total height of 8 feet. Chain-link fabric tautness requirements can be found in UFGS (32 3100.00 10 / 32 31 13.00 20 / 32 31 13.00 40). Provide chain link fencing components and accessories in accordance with ASTM standards F1043, F626, A817, A824, F1083 and F1664. All fencing and components will be commercial grade. Use non-reflective coating for fences to reduce glare that could affect remote camera and visual assessment.
ITEMS AND SPECIFICATION QUANTITY UNIT UNIT PRICES TOTAL PRICE |
Bid 1: POL Fence and 665 Gate Repair 1 LS $ $ |
Bid 2: Flight Line Fence 1 LS $ $ |
Bid 3: AGE Fencing 1 LS $ $ |
Bid 4: 665 Gate Relocation 1 LS $ $ |
ESTIMATED TOTAL: |
Update #1 ·
THIS PROJECT IS OPEN ONLY TO THE KSARNG AND KSANG APPROVED MATOC CONTRACTORS.
This project is for the 190th CE FY 16 Fencing Repairs.
Project Title and Project Description:
PROJECT DESCRIPTION: Submit a bid for each line item of work to be done. The purpose of this contract is to install, modify existing, or replace force protection measures around designated facilities in accordance with UFC 4-022-03. This contract will also repair sections of failing asphalt near the flight line side of building 662. Fence product used will be Type A, galvanized, 2 inch square mesh, woven 9 gauge steel wire fabric chain link fence 7 feet high, surmounted by three strands of barbed wire angled outward at 45 degrees for a total height of 8 feet. Chain-link fabric tautness requirements can be found in UFGS (32 3100.00 10 / 32 31 13.00 20 / 32 31 13.00 40). Provide chain link fencing components and accessories in accordance with ASTM standards F1043, F626, A817, A824, F1083 and F1664. All fencing and components will be commercial grade. Use non-reflective coating for fences to reduce glare that could affect remote camera and visual assessment.
ITEMS AND SPECIFICATION QUANTITY UNIT UNIT PRICES TOTAL PRICE |
Bid 1: POL Fence and 665 Gate Repair 1 LS $ $ |
Bid 2: Flight Line Fence 1 LS $ $ |
Bid 3: AGE Fencing 1 LS $ $ |
Bid 4: 665 Gate Relocation 1 LS $ $ |
ESTIMATED TOTAL: |
Files
| File | Type | Posted |
|---|---|---|
| Gate_Power_Feed.pdf | ||
| Wage_Determination_update_04152016.pdf | ||
| SOW_2016_Fencing_Repairs_April_19 _2016.pdf | ||
| Amendment_1_to_the_solicitation.docx | DOCX document | |
| April_19_Pre-bid_attendance_roster.pdf | ||
| MATOC_TO_Project_ATFP_Base_Fencing_Prg.docx | DOCX document | |
| Wage_Rates_for_ATFP_Fencing_Prj.pdf | ||
| SOW_2016_Fencing_Repairs.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| 2016 Fencing Repairs, Forbes Field, Topeka KS | Award Notice | |
| This notice | Award Notice |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity