137th SOW Building 1040 Communications Infrastructure
Closed Pre-Solicitation Posted
- Solicitation number
- W50S8T-26-R-COMM
- Agency
-
Army National Guard
Department of the Army, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 541519 Other Computer Related Services
- Place of performance
- Oklahoma City, Oklahoma 73179, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The 137th Special Operations Wing (Army National Guard) is conducting market research through June 11, 2026, to identify contractors capable of designing, procuring, and installing communications infrastructure at Building 1040, Will Rogers Air National Guard Base, with anticipated total small business set-aside. The scope encompasses network cables, switches, audio-visual control systems, monitors, and fiber infrastructure, with the contractor responsible for full design, procurement, installation, testing, and three-year sustainment. Performance occurs at Will Rogers Air National Guard Base in Oklahoma, primarily in Buildings 1040 and 1035, Monday through Friday, 0800–1700 hours, excluding federal holidays. The Tactical Training Center infrastructure must support two interconnected rooms (174A and 174B) with mirrored audio-visual control systems, local network infrastructure using CAT6 ethernet and duplex single-mode fiber, connectivity for at least 20 workstation monitors (Dell U3219Q 4K 32-inch displays per room), one control station per room, and curved LED video walls with minimum four inputs. Each floor-mounted workstation drop requires two ethernet ports and two duplex LC/APC fiber ports, with all pathways tested to EIA/TIA standards. The contractor must deliver engineered designs, schematics, test results, and technical documentation. All contractor personnel require background investigations and personal identity verification per Department of Defense and Army requirements. Interested contractors should submit a capabilities statement and address any questions or concerns regarding the draft Statement of Work and technical drawings by the June 11 deadline.
Notice text
The 137th SOW is seeking contractors that can quickly design, procure, and install communication infrastructure that will include but not limited to network cables, switches, audio-visual control systems, monitors, and fiber to name a few. If your company can design an network infrastrastructure and test/install all designed equipment please provide your companies capabilities statement.
Additionally, please review the attached draft Statement of Work and Drawings and reply with any questions, concerns, or clarifications about the requirements when sending in your cabilities statement.
This posting is only for the purpose of market research.
Files
| File | Type | Posted |
|---|---|---|
| T-101 and T-102.pdf | ||
| SOW 1040 TTC Draft.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity