127EAX24R0001 – willow creek habitat restoration
Closed Solicitation Posted
- Solicitation number
- 127EAX24R0001
- Agency
-
Region 3 - Southwestern Region
Forest Service, Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Reserve, New Mexico 87830, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Department of Agriculture Forest Service R3-Southwestern Region is seeking a contractor to complete final design and construct aquatic habitat restoration structures along a reach of Willow Creek in the Gila National Forest in New Mexico. The required work includes installing rock clusters, J-hook vanes, cross vane weirs, bank sloping, willow bundle installations, brush revetment installations, and native seeding to restore the natural stream morphology. The agency will award a firm fixed-price contract based on a best value tradeoff evaluation of technical factors and price. A site visit is scheduled for December 12, 2023, questions are due by December 15th, and proposals are due by January 9, 2024.
This is a 100% small business set-aside contract with a magnitude between $100,000 and $250,000. Davis-Bacon wage rates apply, and payment and performance bonds are required. The complete solicitation package will be available through the System for Award Management (SAM.gov) website on or around November 30, 2023. No potential incumbents were named in the documentation provided.
Notice text
127EAX24R0001 – Willow Creek Habitat Restoration
Description of Work: Construction
The intent of this contract is to secure services to complete final design and construct aquatic habitat restoration structures to restore the natural stream morphology of a reach of Willow Creek. High burn severity within Willow Creek’s watershed (from the 2012 Whitewater-Baldy fire) departed the hydrograph from natural conditions immediately following the fire and for several years afterwards. Loss of ground cover, loss of riparian vegetation, and temporary hydrophobicity in soils resulted in increased flows, which negatively altered the channel’s geometry, causing aquatic habitat to decline for the listed Gila trout. Proposed treatments to improve aquatic habitat and stabilize the stream channel include construction of rock clusters, J-hook vanes, cross vane weirs, bank sloping, willow bundle installations, brush revetment installations, and native seeding. Completion expected prior to 9/30/2024.
Design
Final design for this project is required for the work prior to implementation. This includes an estimate of materials required, exact locations of erosion control structures, and engineering designs for these structures.
Location: The project is located on the Gila National Forest, Reserve Ranger District.
To reach Willow Creek: From Reserve, NM take State Highway 435 going south for 6.5 miles until you reach FSR 141. Follow FSR 141 for approximately 30 miles going east until you reach FSR 28. Follow FSR 28 going south for approximately 15 miles to reach County Road 073. Follow County Road 073 for approximately 3.5 miles until the end of the road. The project area is about .10 miles long from where County Road 073 ends to the wilderness boundary.
Under normal conditions the project area is accessible with a 2-wheel drive vehicle. It shall be the responsibility of the contractor to determine the most suitable route to the project area. All of the transportation of equipment, personnel, and supplies will also be the responsibility of the contractor.
Basis for Award: The Government Anticipates awarding a Firm Fixed-Price Contract using RFP Best Value-Tradeoffs: Award will be made to the offer that meets or exceeds the requirements contained herein. This process permits tradeoffs among price and non-price technical factors and allows the Government to accept other than the lowest priced quote. The government will evaluate quotes based on the technical evaluation factors specified in this solicitation. The evaluation factors other than cost or price, when combined, are more important than cost or price. The Price reasonableness will be determined by using competitive solicitation process.
Site Visit has been scheduled:
Date: December 12, 2023
Time: 1:00 pm MT
Location: Meet in the parking lot next to the public restroom by the 2 cabins and a set of corrals.
Directions: To reach Willow Creek: From Reserve, NM take State Highway 435 going south for 6.5 miles until you reach FSR 141. Follow FSR 141 for approximately 30 miles going east until you reach FSR 28. Follow FSR 28 going south for approximately 15 miles to reach County Road 073. Follow County Road 073 for approximately 3.5 miles until the end of the road. The project area is about .10 miles long from where County Road 073 ends to the wilderness boundary.
Contact:
Contracting Officer Representative (COR):
Harley Allsup - harley.allsup@usda.gov or 575-388-8261
General Technical Manager (GTM)
Carolyn Koury - carolyn.koury@usda.gov or 575-388-8378
This project is a 100% Small Business Set-Aside. NAICS CODE 237990 45M
Magnitude of project is between $100,000 and $250,000.
Davis-Bacon wages apply.
Payment and Performance bonds are required.
Send questions to: michelle.l.bahr@usda.gov no later than December 15, 2023, at 1:00 pm MT.
In order to be eligible for award of a Federal Contract, potential vendors need to be registered in the System for Award Management (SAM) www.sam.gov at the time of offer submission.
Offer Submissions: Offerors shall submit the Return Packet – including a Business Proposal and a Technical Proposal. The required information SF1442, Section B and K (business proposal) and Section M (technical proposal) of the solicitation. Offers or responses to the solicitation (include the solicitation number in the name of the document – 127EAX24R0001 may be sent to the Contracting officer by email: michelle.l.bahr@usda.gov before the deadline.
The Deadline for receipt of responses to the RFP shall be January 9, 2024 @ 1:00 pm MT.
No Further information is available at this time. The complete solicitation package will be attached and made available only through SAM.gov, https://sam.gov/content/home on or within 15 days of this notice (November 30, 2023). Anyone wishing to participate in this proposed procurement must obtain their copy from SAM.gov. Copies will not be mailed from the Contracting Office. All amendments will be posted on SAM.gov.
Files
Show all 19
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Gusg habitat hydro-logic restoration 202 | Colorado Region | Total Small Business | |
| Hickman Wildlife Water Catchment and Pipe Fence | New Mexico Region | Total Small Business | |
| Access Road Repair National Elk Refuge | — | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity