1240LT22Q0088 Amendment 0001 GAOA Whitestar CG Water System Maint
Closed Solicitation Posted
- Solicitation number
- 1240LT22Q0088
- Agency
-
Forest Service
Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
- PSC
- 4510 Plumbing Fixtures And Accessories
- Place of performance
- Twin Lakes, Colorado 81251, United States
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
Amendment 0001 : The purpose of Amendment 0001 is to provide prospective offerors the pre-bid meeting minutes held on August 30, 2022, and to remove references to a Bid Guarantee in the solicitation. See Amendment 0001, attached for important details.
The due date for quotes remains the same September 6, 2022 at 5:00 P.M. local time.
Period of Performance: 09/20/2022 to 09/19/2023
Contractor will supply all materials, personnel, equipment and supervision to complete all work as described within the attached Specifications and drawings to include and all necessary valid licenses and permits as required within the Specifications.
Work for this project requires the contractor to be responsible for supplying all labor, materials, equipment, utilities, miscellaneous items, freight and delivery to install water treatment facilities at White Star Campground, including new treatment process, connection to existing utilities, and removal of existing treatment process. All work performed shall be by state licensed contractors.
All work performed shall be per the latest edition of the international building codes. B. The contractor shall be responsible for supplying all labor, materials, equipment, utilities, disposal to abandon hand pump water wells per 2 CCR 402-2, Rule 16.
Proposals are due 06 SEP 2022. Period of Performance is 365 calendar days after Notice to Proceed (NTP)
Update #1 ·
Contractor will supply all materials, personnel, equipment and supervision to complete all work as described within the attached Specifications and drawings to include and all necessary valid licenses and permits as required within the Specifications.
Work for this project requires the contractor to be responsible for supplying all labor, materials, equipment, utilities, miscellaneous items, freight and delivery to install water treatment facilities at White Star Campground, including new treatment process, connection to existing utilities, and removal of existing treatment process. All work performed shall be by state licensed contractors.
All work performed shall be per the latest edition of the international building codes. B. The contractor shall be responsible for supplying all labor, materials, equipment, utilities, disposal to abandon hand pump water wells per 2 CCR 402-2, Rule 16.
Proposals are due 06 SEP 2022. Period of Performance is 365 calendar days after Notice to Proceed (NTP)
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity