| EXAMPLE SUBMITTAL REGISTER | Project Title: | Contract Number: | |||||||||||||||||
| Project Location: | Contractor: | ||||||||||||||||||
| TO BE COMPLETED BY CONTRACTOR QUALITY CONTROL MANAGER OR PROJECT SUPERINTENDANT | |||||||||||||||||||
| Item Number | Specification Section | ||||||||||||||||||
| and Pargraph Number | DESCRIPTION OF ITEM SUBMITTED | CLASSIFICATION | TYPE OF SUBMITTALS | Contractor Action | Government Action | REMARKS | |||||||||||||
| Government Approval (GA) | For Information Only (FIO) | CERTIFICATIONS | SCHEDULE | SHOP DRAWINGS | SAMPLES | MANUFACTURER'S RECOMMENDATIONS/INSTRUCTIONS | O & M MANUALS, INSTRUCTIONS, AND WARRANTIES | PRODUCT DATA | TEST REPORTS | DESIGN DATA | PLANS | OTHER | Date Quality Control Review Completed | Date Submitted to Government | Date Submittal Returned to Contractor | Submittal Approval Code |
| 1 | 010150 - 2.2.A | Accident Prevention Plan | X | ||||||||||
| 2 | 010150 - 2.2.B | Mechanical Certificates | X | ||||||||||
| 3 | 010150 - 2.2.C | HAZMAT Test Reports | X | ||||||||||
| 4 | 010150 - 2.2.D | Safety Meeting and Inspection Reports | X | ||||||||||
| 5 | 010150 - 3.6 | Construction Schedule | X | ||||||||||
| 6 | 010150 - Part 6 | Operation and Maintenance Manuals | X | ||||||||||
| 7 | 010150 - 7.5 B | Project Record Documents | X | Due 15 days before Final Inspection | |||||||||
| 8 | 024116 - 1.4.A,B,C,D E | Structure Demolition | X | X | X | ||||||||
| 9 | 033000 - 1.2.A | Cast-In-Place Concrete | X | X | X | X | X | ||||||
| 10 | 061000 - 1.2.A | Rough Carpentry | X | X | |||||||||
| 11 | 061600 - 1.2.A | Sheathing | X | ||||||||||
| 12 | 061753 - 1.3.A | Shop-Fabricate Wood Trusses | X | X | |||||||||
| 13 | 066400 - 1.3.A & B | Fiberglass Reinforced Plastic Panels | X | X | X | X | |||||||
| 14 | 072100 - 1.2.A | Thermal Insulation | X | X | |||||||||
| 15 | 073113 - 1.3.A & B | Asphalt Shingles | X | X | X | X | X | Provide extra material. | |||||
| 16 | 074646 - 1.2.A & B | Fiber Cement Siding | X | X | X | X | X | Provide extra material. | |||||
| 17 | 076200 - 1.2.A | Sheet Metal Flashing and Trim | X | X | X | ||||||||
| 18 | 079200 - 1.2.A & B | Joint Sealants | X | X | X | X | Provide Joint-Sealant Schedule | ||||||
| 19 | 081113 - 1.2.A | Steel Doors and Frames | X | ||||||||||
| 20 | 083613 - 1.2.A & B | Sectional Doors | X | X | X | ||||||||
| 21 | 087110 - 1.3.A & B | Door Hardware | X | X | |||||||||
| 22 | 092900 - 1.2.A | Gypsum Board | X | X | |||||||||
| 23 | 099113 - 1.3 & 1.4 | Painting | X | X | X | X | Provide extra material | ||||||
| 24 | 102000 - 1.2 A | Louvers and Vents | X | ||||||||||
| 25 | 220500 - 1.2.A | Plumbing Products | X | ||||||||||
| 26 | 221116 - 1.2.A & B | Domestic Water Piping | X | X | X | ||||||||
| 27 | 221123 - 1.2.A & B | Domestic Water Pumps | X | X | X | X | |||||||
| 28 | 22136 - 1.4.A & B | Sanitary Waste and Vent Piping | X | X | |||||||||
| 29 | 223000 - 1.3.A, B, & C | Process Water Treatment Systems | X | X | X | X | |||||||
| 30 | 223050 - 1.2.A & B | Process Water System Controls | X | X | X | X | |||||||
| 31 | 230500 - 1.3.A & B | HVAC Products | X | X | |||||||||
| 32 | 231126 - 1.4.A & B | Liquefied-Petroleum Gas Tank and Piping | X | X | X | ||||||||
| 33 | 260500 - 1.5.A. & B | Electrical Products | X | X | |||||||||
| 34 | 262210 - 1.3.A. | Meter Socket | X | ||||||||||
| 35 | 267000 - 1.4.A & B | Off-Grid Power System | X | X | X | X | |||||||
| 36 | 312250 - 1.4.A & B | Earthwork | X | X | |||||||||
| 37 | 312317 - 1.3.A & B | Trenching, Bedding, and Backfill for Utilities | X | X | X | X | |||||||
| 38 | 312500 - 1.2.A | Temporary Erosion and Sedimentation Control | X | X |
NOTES: The contractor is ultimately responsible for identifying and providing all submittals required by this contract. Production of this document by the contractor does not relieve the contractor of this responsibility. The Contractor shall review the submittal register for completeness within 10 days of NTP. The Contractor shall notify the CO if any submittals are missing or if additional submittals need to be added to the register.