10T Hoist Replacement at Nolin River Lake, Bee Spring, KY.

Closed Solicitation Posted

Solicitation number
W912QR20Q0012
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
811310 Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance
PSC
J036 Maint/Repair/Rebuild Of Equipment- Special Industry Machinery
Place of performance
Bee Spring, Kentucky 42207, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

***Amendment 0001 attached 24 January, 2020.  Please see amendment for detailed specifics.***

Repair/Replace drive wheel, bearing and axle on Model 600SWJ wall crawler.

1. Contractor shall replace drive wheel, wheel bearing and axle on Cleveland Beacon model 600 SWJ sidewall travelling jib crane.
2. A site visit is recommended to establish precise measurements and develop a work plan.
3. A job plan should be included with bid for review to assure all safety guidelines are met
4. Prints below are what we have on file but winning bidder will be responsible for determining exact dimension of new parts.

After installation, contractor must perform a 125% load test with weights or water bags in the presence of U.S. Army Corps of Engineers personnel and then, with assistance from Corps personnel shall perform an operational test: lifting the emergency bulkhead and placing it in slot.  Scheduling of the load test and operational test must be coordinated with the POC noted above.  The load test will require completion of a Critical Lift Plan as required by the USACE Safety Manual.

Update #1 ·

Repair/Replace drive wheel, bearing and axle on Model 600SWJ wall crawler.

1. Contractor shall replace drive wheel, wheel bearing and axle on Cleveland Beacon model 600 SWJ sidewall travelling jib crane.
2. A site visit is recommended to establish precise measurements and develop a work plan.
3. A job plan should be included with bid for review to assure all safety guidelines are met
4. Prints below are what we have on file but winning bidder will be responsible for determining exact dimension of new parts.

After installation, contractor must perform a 125% load test with weights or water bags in the presence of U.S. Army Corps of Engineers personnel and then, with assistance from Corps personnel shall perform an operational test: lifting the emergency bulkhead and placing it in slot.  Scheduling of the load test and operational test must be coordinated with the POC noted above.  The load test will require completion of a Critical Lift Plan as required by the USACE Safety Manual.

Files

File Type Posted
W912QR20Q0012 0001.pdf PDF
W912QR20Q0012-0000.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors