zS02 PAST PERFORMANCE INFORMATION FORM.pdf
PDF 100 KB Posted
- Solicitation number
- 36C10D23R0007
- Issued by
-
Department of Veterans Affairs
About this file
This Past Performance Information Form requests details on a previous construction project to replace the membrane on the roof of Building 47 for the Department of Veterans Affairs. It asks for the project name and location, owners' names and contact information, whether the contractor was prime or sub, percentage of self-performed work, contract number and dates, new and total square footage built, scope of work description, and photos. The related federal contract opportunity is solicitation number 36C10D23R0007 for the replacement of the membrane on the roof top of Building 47 at a Department of Veterans Affairs facility. It provides the solicitation number, project name, opportunity type as a solicitation, and contracting agency.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C10D23R0007 0004.docx | DOCX document | |
| 36C10D23R0007 0003.docx | DOCX document | |
| S05 RFI Questions Solicitation 36C10D23R0007 Replacement of Membrane in Building 47 on roof top.docx | DOCX document | |
| 36C10D23R0007 0002.docx | DOCX document | |
| 36C10D23R0007 0001.docx | DOCX document | |
| 317 VA Bay Pines Site Visit Instructions and Sign In Sheet Roof Membrane.docx | DOCX document | |
| P09 final SOW Roof membrane Replacement Restoration 01.03.2023.docx | DOCX document | |
| RC SOW Roof membrane Replacement Restoration 01.03.2023.docx | DOCX document | |
| 36C10D23R0007_1.docx | DOCX document | |
| S02 Drawing 47 Roof.pdf | ||
| S02 FL20230222 01.13.2023.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAST PERFORMANCE INFORMATION FORM
1. Project name and location (City, State, County):
2. Project owners name and address: (Government Agency, commercial firm or other organization):
3. Project owners point of contact information: (name, phone, e‐mail address):
4a. Were you the prime contractor? Yes ❑ No ❑
4b. Percentage of work that was self‐performed? %
5. Contract number for project: 6. Date of contract:
7a. Period of performance: 7b. Completion Date Initial: 7b. Completion Date Actual:
8a. Contract value at time of award: 8b. Final contract value:
9a. New square footage built on project: 9b. Total square footage built on project:
10. Provide a brief description of construction scope of work:
* Attached Photo(s) on blank sheet
File details come from the government source that posted it. Updated .