zmp-1203733-m001 Rev A Signed.pdf
PDF 590 KB Posted
- Solicitation number
- 697DCK-25-R-00392
About this file
This engineering drawing details a boiler stack and breeching replacement project for the Federal Aviation Administration's Air Route Traffic Control Center (ARTCC) in Minneapolis. The technical drawing provides a comprehensive plan for replacing the existing boiler exhaust stack in the Admin Wing basement, including specific requirements for new 20" ID stainless steel double-walled metal vent stacks, new metal breeching, and associated supporting infrastructure. Key technical specifications include removing the existing 30" OD stack, installing new stack pipes with 1" air space between walls, adding a 15"x15" bolted hand door, providing steel supports and bracing, and ensuring proper flashing, insulation, and weather sealing.
The drawing includes detailed notes requiring the contractor to verify existing conditions, coordinate work with the FAA Contracting Officer's Representative (COR) to minimize operational disruptions, perform boiler tuning and combustion reports after installation, and conform to all applicable ordinances and codes. The project is part of a broader solicitation (697DCK-25-R-00392) for multiple improvement projects at the Minneapolis ARTCC, with an estimated price range between $400,000-$500,000. The technical documentation emphasizes professional workmanship, precise measurements, and maintaining existing system functionality during the replacement process.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
8'-0" 12'-0" 20'-0" 20'-0" 16'-0"
WATER HEATERS
DOMESTIC HOT
SOFTENER
WATER
SEE DETAIL 2
BUS
ESSENTIAL
WALL STACK
NEW DOUBLE
M024
B
BOILER ROOM
ROOM
MONITORING
CHILLER ROOM
B116
VESTIBULE
MECHANICAL ROOM
B O
IL
E R
B
B
B O
IL
E R
B
A B
O
IL
E R
B
C
COVERED DRAINAGE TRENCH
PUMP
P-2C
PUMP
P-2B
PUMP
P-2A
A C
A
A C
B
(7' ABV FLOOR)
EXPANSION TANK
HOT WATER
DOMESTIC
FUEL TANK
285 GALLON
A-6A-5A-4A-3A-2A-1
C H
IL
L E
R
C H
IL
L E
R
C H
IL
L E
R
C H
IL
L E
R
B115
COMPRESSORS
CAFETERIA
P-1D
PUMP
P-1C
PUMP
P-1B
PUMP
P-1A
PUMP
B117
DOWN
RAMP
DN
UP
B118
B119
AHU-24 AH-23
AHU-21 AH-22
ABOVE
ROOF
CONC
UP
PUMPS
SUMP
N
SCALE: 1/8" = 1'-0"
PARTIAL ADMIN WING BASEMENT PARTIAL PLAN
A
1 8
TO BLR 1A
TANK
BRINE
ELEV. 86.5' BASEMENT FLOOR
ELEV. 100.5' FIRST FLOOR
ELEV. 112.0' TPO ROOF
ENCLOSURE
EXISTING
ELEV. 123.0' ADMIN ROOF
BALL VALVE
EXISTING AND NEW WORK
POINT OF CONTACT BETWEEN
WING
ADMINISTRATION
CONTROL WING
WING
AUTOMATION
NOT TO SCALE
ELEVATION VIEW - CHIMNEY STACKB
LEGEND:
BLR 1C
TO
BLR 1B
TO
1A
TO BLR
WITH LIMITED SPACE
CONE ANGLE EVEN
MAX 10 DEGREE
KEY PLAN
8' 0 8' 16'
SCALE: 1/8" = 1'-0"
2 4 5
SEE DETAIL 1 (TYP)
WALL STACK
NEW DOUBLE
WALL STACK
NEW DOUBLE
WALL STACK
NEW DOUBLE
NOT TO SCALE
STACK/BREECHING TRANSITION DETAIL
NOT TO SCALE
CLEANOUT WITH DRAIN
EXIST BRICK WALL
L4x4x1/4"
VERTICAL ANGLE)
EMBED = 3 1/8" (AT EACH
W/ A36 ROD AND A MIN
HILTI 1/2" DIAM HY270(6)
DIAGONAL STRIPES AT 4" OC
YELLOW WITH 1" WIDE BLACK
PAINT MTL FRAMING HAZARD
L6x6x5/16"
STACK,TYP
NEW FLUE
MTL HOOD
NEW FIELD FABRICATED
ROOF ASSEMBLY
ROOF DECKING
PATCH AND REPAIR
EXISTING ROOF JOIST
M
IN
SCALE: 1/2" = 1'-0"-
5/16"
5/16"
5/16"
5/16"
FLUE STACK SUPPORT DETAIL
L4x4x1/4"
HOOD BELOW
NEW METAL RAIN
WALL
EXIST BRICK
STACK, TYP
NEW BOILER
L4x4x1/4"
L6x6x5/16"
FLUE STACK
WELDED TO METAL
CONTINUOUSLY
HATCHING
AS INDICATED BY
SHEET METAL CAP
FRAME, TYP
WELD TO NEW
(VIF)
TYP
1/4"
SCALE: 1/2" = 1'-0"-
WELD BAND TO FRAME
EXIST HOT WATER VENT
FLUE STACK SUPPORT PLAN DETAIL
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
/1
/2
:4
:3
P
M P lo tt e d b y S
R V
C -C
A E
G -E
D M
S -C
O O
R D
DATE
APPROVED
z m p -1
-m
.d w g
8 234567
H
G
F
E
D
C
A
B
GENERAL NOTES:
NEW WORK NOTES:
1) ALL WORK, MATERIAL AND INSTALLATION SHALL CONFORM TO THE
REQUIREMENTS OF THE ORDINANCE AND CODE HAVING JURISDICTION.
2) ALL WORK SHALL BE IN ACCORDANCE WITH THE PROJECT SPECIFICATION.
3) ALL WORK SHALL BE PERFORMED IN A NEAT, ACCURATE, WORKMAN-LIKE AND
PROFESSIONAL MANNER.
4) CONTRACTOR SHALL VERIFY ALL DEMOLITION WORK, EXISTING CONDITIONS,
DIMENSIONS AND NEW INSTALLATION PRIOR TO COMMENCEMENT OF WORK.
EXISTING HOT WATER HEATER VENT IS TO BE REMAIN IN PLACE AND
PROTECTED.
5) CONTRACTOR SHALL COORDINATE AND SCHEDULE ALL DEMOLITION & NEW
CONSTRUCTION WORK WITH FAA COR TO MINIMIZE OPERATION DISRUPTIONS
WHILE WORK IS IN PROGRESS.
TRANSITIONS, ELBOWS, ETC.
FIBER INSULATOR. REPLACEMENT SHALL INCLUDE ALL REQUIRED STEEL SUPPORTS,
METAL BREECHING WITH 1" SPACING BETWEEN WALLS AND FILLED WITH HIGH TEMPERATURE
REMOVE EXISTING BREECHING AND REPLACE WITH 16" ID STAINLESS STEEL DOUBLE WALLED
TEE AND ONE 45 DEGREE TEE FOR CONNECTIONS AND ALL REQUIRED TRANSITION PIECES.
1" AIR SPACE BETWEEN WALLS. PROVIDE CLEAN OUT SECTION, BOLT FLANGE, ONE 90 DEGREE
NEW STACK SHALL TO BE 20" ID STAINLESS STEEL DOUBLE WALLED METAL VENT STACKS WITH
REMOVE EXISTING 30" OD STACK INCLUDING RAIN HOOD AND REPLACE WITH NEW STACK PIPE.
FOR VALVES.
DEGREE ELBOW PIPE, 1 1/2" DRAIN LINE WITH BALL VALVE AND PIPE CAP. PROVIDE SUPPORTS
MODIFY STACK ENCLOSURE TO INCLUDE A ACCESSIBLE 15"X15" BOLTED HAND DOOR, 90
PROVIDE BRACING FOR VERTICAL VENT STACK.
SUPPORT TO CHIMNEYS AT EACH FLOOR AND PROVIDE EXPANSION JOINT/BAND AS REQUIRED.
NEW VENT STACKS INSTALLATION. PROVIDE GUY WIRES AND RIGID BRACES TO GIVE LATERAL
MODIFY EXISTING SUPPORTS OR PROVIDE ADDITIONAL STEEL SUPPORTS AS REQUIRED TO FIT
STACK HEIGHT AND ELEVATION. NEW STACK HEIGHT SHOULD BE SIMILAR TO EXISTING.
ELEVATION AND DIMENSIONS SHOWN ARE APPROXIMATE. CONTRACTOR TO VERIFY EXISTING
STEEL.
LIGHTNING RODS AND CABLES PER EXISTING CONDITIONS. RAIN HOOD TO BE 304 STAINLESS
PROVIDE REQUIRED RAIN HOODS AND SUPPORTS. CONTRACTOR TO RECONNECT ALL EXISTING
REMOVE AND DISPOSE OF EXISTING ENCLOSURE.
PROVIDE NEW HANGERS FOR SUPPORT OF HORIZONTAL BREECHING RUNS.
THERMAL PROTECTION.
FLASHING FOR WEATHER PROTECTION. PROVIDE INSULATION BELOW NEW METAL CAP TO ENSURE
PROVIDE 22-GA ALUMINIZED STEEL ROOF FLASHING AND 20-GA ALUMINIZED STEEL COUNTER
PROVIDE COMBUSTION REPORTS FOR BOTH FUELS.
AFTER INSTALLATION OF NEW BOILER BREECHING AND STACKS PERFORM BOILER TUNING AND
IS
S
U E
D F
O R
E D
M
06/30/2022
MGR: ENGINEERING
FARMINGTON
AZMP-1203733-M001
ARTCC
ADMIN WING BASEMENT
BOILER STACK & BREECHING REPLACEMENT
PLAN, ELEV. VIEWS, DETIALS AND NOTES
z m p -1
-m
.d w g
ENROUTE/FSS
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA
C O
N S
T R
U C
T
IO
N
THIS DRAWING PRODUCED ON THE AGL REGION MICROSTATION SYSTEM
PROJECT ENGINEER
1203733
A 01/08/2024 ADDENDUM REPLACE BOILER STACK 1203733 01/08/2024 CAO
MN
10 PROVIDE FIRESTOP AND WEATHER SEAL FOR ALL PENETRATIONS.
zmp-1203733-m001
| 2025-07-09T10:01:49-0500 | |
| FRANCISCO MONTES |
| 2024-01-19T13:53:32-0600 | |
| CODY A OLSON |
File details come from the government source that posted it. Updated .