ZEPH_SAMPLE_CHANGE_ORDER.pdf

PDF 119 KB Posted

Attached to
Zephyrhills City Parks Signage
Solicitation number
2025-012
Issued by
Pasco County, Florida

About this file

The document is an AIA (American Institute of Architects) Document G701 Change Order form from 2017, which is a standard template for documenting modifications to a construction contract. The form is designed to formally record changes to the original contract, including potential adjustments to the contract sum, guaranteed maximum price, and contract time. While the specific project details are not filled in, the document provides a structured framework for capturing and approving alterations to the original construction agreement.

The change order form includes sections for documenting the original contract sum, previously authorized change orders, and the impact of the current change order on the total contract sum and contract time. The form requires signatures from the Architect, Contractor, and Owner to validate the change, ensuring that all parties agree to the modifications. The document emphasizes that changes must be agreed upon by both the Owner and Contractor and that the change order is not valid until signed by all three parties. The form serves as a critical tool for maintaining transparency and mutual understanding during the construction process, allowing for documented adjustments to the original contract terms.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .