20250630_-_Zephyrhills_City_Parks_Signage_CDs.pdf
PDF 20 MB Posted
- Attached to
- Zephyrhills City Parks Signage
- Solicitation number
- 2025-012
- Issued by
- Pasco County, Florida
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Zephyrhills_City_Parks_Signage.pdf | ||
| ZEPH_SAMPLE_CHANGE_ORDER.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
O U
O U
O U
O U
O U
O U
O U
O U
O U
O U
O U
O U
O U
O U
O U
OUOUOUOUOUOUOUOUOUOUOUOUOU
OUOU
PONCAN CIRCLE
PROJECT
SITE
N O
R
TH
M O
N U
M
EN
T
SI
G N
C O
VE
R
S H
EE
T
C-0
LI
C
EN
SE
D P
R O
FE
SS
IO
N
AL
C
IT
Y
PA
R
KS
S
IG
N
AG
E
PR
EP
AR
ED
F
O R
C
IT
Y O
F
ZE
PH
YR
H
IL
LS
FOR
CITY OF ZEPHYRHILLS
June 30, 2025 NORTH
PROJECT LOCATION
PASCO COUNTY
FOR
WWW.KIMLEY-HORN.COM
1800 SECOND STREET, SUITE 900, SARASOTA, FL 34236
PHONE: 941-379-7600
KIMLEY-HORN AND ASSOCIATES, INC.
GALL BOULEVARD AND PONCAN CIRCLE
ZEPHYRHILLS, FL 33542
CONSTRUCTION PLANS
G
AL
L
BO
U
LE
VA
R
D
O U
O U
O U
PO
N
C
AN
C
IR
C
LE
FR
O
N
TA
G E
R O
AD
APPROXIMATE LOCATION OF FDOT R.O.W.
NORTH MONUMENT SIGN
PROJECT TEAM PROJECT DATA
ENGINEER
KIMLEY HORN AND ASSOCIATES, INC
ADDRESS: 200 CENTRAL AVE SUITE 600, ST. PETERSBURG, FL 33701
CONTACT: DUSTIN BALLARD, P.E .
TEL: (941) 379-7600
PROJECT TEAM
PARCEL ID #:
12-26-21-0000-04200-0000 12-26-21-0000-04900-0050
PROJECT DATA
CONTACTS
OWNER
CITY OF ZEPHYRHILLS
ADDRESS: 5335 8TH STREET, ZEPHYRHILLS, FLORIDA 33542
TEL: (813) 780-0000
SURVEYOR
CITY OF ZEPHYRHILLS
ADDRESS: 5335 8TH STREET, ZEPHYRHILLS, FLORIDA 33542
TEL: (813) 780-0000
CITY OF ZEPHYRHILLS PUBLIC WORKS
ADDRESS: 39421 SOUTH AVENUE, ZEPHYRHILLS, FL 33542
CONTACT: SHANE LEBLANC
TEL: 813-780-0022
CABLE/FIBER
CHARTER COMMUNICATIONS
ADDRESS: 37059 KINGS CROWN DRIVE, ZEPHYRHILLS, FL 33541
CONTACT: USIC DISPATCH OFFICE *
TEL: (800) 778-9140
SEWER/WATER
CITY OF ZEPHYRHILLS
ADDRESS: 5335 8TH STREET, ZEPHYRHILLS, FL 33542
CONTACT: BRUCE SELLARS
TEL: (813) 780-0000 X3567
ELECTRIC
DUKE ENERGY
ADDRESS: 299 1ST AVENUE N, ST. PETERSBURG, FL 33701
CONTACT: USIC DISPATCH
TEL: (800) 778-9140
CONTACT: DUKE'S CUSTOMER SERVICE CENTER
TEL: (407) 629-1010
CATV/COMMUNICATION LINES
FRONTIER COMMUNICATIONS
ADDRESS: 4911 BRUCE B DOWNS BOULEVARD, WESLEY CHAPEL, FL 33544
CONTACT: USIC DISPATCH
TEL: (800) 778-9140
CONTACT: ALBERT RIVAS
TEL: (813) 431-2909
GAS
TECO PEOPLES GAS
ADDRESS: 702 N FRANLKIN STREET, TAMPA, FL 33602
CONTACT: ROGER ROSELLO
TEL: (813) 422-2805
CONTACT: SHARON BECK
TEL: (813) 853-9337
CONTACT: TECO PEOPLES GAS CUSTOMER SERVICE**
TEL: (877) 832-6747
LANDSCAPE ARCHITECT
KIMLEY HORN AND ASSOCIATES, INC
ADDRESS: 1800 MAIN STREET, SUITE 900, SARASOTA, FL 34236
CONTACT: JAMES R. PANKONIN, P.L.A.
TEL: (941) 379-7620
SHEET LIST TABLE
Sheet Number Sheet Title
C-0 NORTH MONUMENT SIGN COVER SHEET
C-1 NORTH MONUMENT SIGN GENERAL NOTES
H-1 NORTH MONUMENT SIGN SITE PLAN
H-2 NORTH MONUMENT SIGN ELEVATIONS
H-3 NORTH MONUMENT SIGN ELEVATIONS
H-4 NORTH MONUMENT SIGN STRUCTURAL DETAILS
N
R
TH
M O
N U
M
EN
T
SI
G N
G
EN
ER
AL
N O
TE
S
C-1
LI
C
EN
SE
D P
R O
FE
SS
IO
N
AL
C
IT
Y
PA
R
KS
S
IG
N
AG
E
PR
EP
AR
ED
F
O R
C
IT
Y O
F
ZE
PH
YR
H
IL
LS
GENERAL CONSTRUCTION NOTES
1. THE CONTRACTOR AND SUBCONTRACTORS SHALL OBTAIN A COPY OF THE FLORIDA
DEPARTMENT OF TRANSPORTATION "STANDARD SPECIFICATIONS FOR ROAD AND
BRIDGE CONSTRUCTION" (LATEST EDITION) AND BECOME FAMILIAR WITH THE CONTENTS
PRIOR TO COMMENCING WORK, AND, UNLESS OTHERWISE NOTED, ALL WORK SHALL
CONFORM AS APPLICABLE TO THESE STANDARDS AND SPECIFICATIONS.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING ALL MATERIAL AND LABOR
TO CONSTRUCT THE FACILITY AS SHOWN AND DESCRIBED IN THE CONSTRUCTION
DOCUMENTS IN ACCORDANCE WITH THE APPROPRIATE APPROVING AUTHORITIES,
SPECIFICATIONS AND REQUIREMENTS. CONTRACTOR SHALL CLEAR AND GRUB ALL
AREAS UNLESS OTHERWISE INDICATED, REMOVING TREES, STUMPS, ROOTS, MUCK,
EXISTING PAVEMENT AND ALL OTHER DELETERIOUS MATERIAL.
3. EXISTING UTILITIES SHOWN ARE LOCATED ACCORDING TO THE INFORMATION AVAILABLE
TO THE ENGINEER AT THE TIME OF THE TOPOGRAPHIC SURVEY AND HAVE NOT BEEN
INDEPENDENTLY VERIFIED BY THE OWNER OR THE ENGINEER. GUARANTEE IS NOT
MADE THAT ALL EXISTING UNDERGROUND UTILITIES ARE SHOWN OR THAT THE
LOCATION OF THOSE SHOWN ARE ENTIRELY ACCURATE. FINDING THE ACTUAL LOCATION
OF ANY EXISTING UTILITIES IS THE CONTRACTOR'S RESPONSIBILITY AND SHALL BE
DONE BEFORE HE COMMENCES ANY WORK IN THE VICINITY. FURTHERMORE, THE
CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES DUE TO THE
CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL
UNDERGROUND UTILITIES. THE OWNER OR ENGINEER WILL ASSUME NO LIABILITY FOR
ANY DAMAGES SUSTAINED OR COST INCURRED BECAUSE OF THE OPERATIONS IN THE
VICINITY OF EXISTING UTILITIES OR STRUCTURES, NOR FOR TEMPORARY BRACING AND
SHORING OF SAME. IF IT IS NECESSARY TO SHORE, BRACE, SWING OR RELOCATE A
UTILITY, THE UTILITY COMPANY OR DEPARTMENT AFFECTED SHALL BE CONTACTED AND
THEIR PERMISSION OBTAINED REGARDING THE METHOD TO USE FOR SUCH WORK.
4. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE VARIOUS UTILITY
COMPANIES WHICH MAY HAVE BURIED OR AERIAL UTILITIES WITHIN OR NEAR THE
CONSTRUCTION AREA BEFORE COMMENCING WORK. THE CONTRACTOR SHALL
PROVIDE 48 HOURS MINIMUM NOTICE TO ALL UTILITY COMPANIES PRIOR TO BEGINNING
CONSTRUCTION. A LIST OF THE UTILITY COMPANIES WHICH THE CONTRACTOR MUST
CALL BEFORE COMMENCING WORK IS PROVIDED ON THE COVER SHEET OF THESE
CONSTRUCTION PLANS. THIS LIST SERVES AS A GUIDE ONLY AND IS NOT INTENDED TO
LIMIT THE UTILITY COMPANIES WHICH THE CONTRACTOR MAY WISH TO NOTIFY.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL REQUIRED
CONSTRUCTION PERMITS AND BONDS IF REQUIRED PRIOR TO CONSTRUCTION.
6. THE CONTRACTOR SHALL HAVE AVAILABLE AT THE JOB SITE AT ALL TIMES ONE COPY OF
THE CONSTRUCTION DOCUMENTS INCLUDING PLANS, SPECIFICATIONS, AND SPECIAL
CONDITIONS AND COPIES OF ANY REQUIRED CONSTRUCTION PERMITS.
7. ANY DISCREPANCIES ON THE DRAWINGS SHALL BE IMMEDIATELY BROUGHT TO THE
ATTENTION OF THE OWNER AND ENGINEER BEFORE COMMENCING WORK. NO FIELD
CHANGES OR DEVIATIONS FROM DESIGN ARE TO BE MADE WITHOUT PRIOR APPROVAL
OF THE OWNER AND NOTIFICATION TO THE ENGINEER.
8. ALL COPIES OF COMPACTION, CONCRETE AND OTHER REQUIRED TEST RESULTS ARE
TO BE SENT TO THE OWNER AND DESIGN ENGINEER OF RECORD DIRECTLY FROM THE
TESTING AGENCY.
9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUBMITTING TO THE ENGINEER A
CERTIFIED RECORD SURVEY SIGNED AND SEALED BY A PROFESSIONAL LAND
SURVEYOR REGISTERED IN THE STATE OF FLORIDA DEPICTING THE ACTUAL FIELD
LOCATION OF ALL CONSTRUCTED IMPROVEMENTS THAT ARE REQUIRED BY THE
JURISDICTIONAL AGENCIES FOR THE CERTIFICATION PROCESS. ALL SURVEY COSTS
WILL BE THE CONTRACTORS RESPONSIBILITY.
10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DOCUMENTING AND MAINTAINING
AS-BUILT INFORMATION WHICH SHALL BE RECORDED AS CONSTRUCTION PROGRESSES
OR AT THE COMPLETION OF APPROPRIATE CONSTRUCTION INTERVALS AND SHALL BE
RESPONSIBLE FOR PROVIDING AS-BUILT DRAWINGS TO THE OWNER FOR THE PURPOSE
OF CERTIFICATION TO JURISDICTIONAL AGENCIES AS REQUIRED. ALL AS-BUILT DATA
SHALL BE COLLECTED BY A STATE OF FLORIDA PROFESSIONAL LAND SURVEYOR WHOSE
SERVICES ARE ENGAGED BY THE CONTRACTOR.
11. ANY WELLS DISCOVERED ON SITE THAT WILL HAVE NO USE MUST BE PLUGGED BY A
LICENSED WELL DRILLING CONTRACTOR IN A MANNER APPROVED BY ALL
JURISDICTIONAL AGENCIES. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING
ANY WELL ABANDONMENT PERMITS REQUIRED.
12. ANY WELL DISCOVERED DURING EARTH MOVING OR EXCAVATION SHALL BE REPORTED
TO THE APPROPRIATE JURISDICTIONAL AGENCIES WITHIN 24 HOURS AFTER DISCOVERY
IS MADE.
13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THAT THE PROPOSED
IMPROVEMENTS SHOWN ON THE PLANS DO NOT CONFLICT WITH ANY KNOWN EXISTING
OR OTHER PROPOSED IMPROVEMENTS. IF ANY CONFLICTS ARE DISCOVERED, THE
CONTRACTOR SHALL NOTIFY THE OWNER PRIOR TO INSTALLATION OF ANY PORTION OF
THE SITE WORK THAT WOULD BE AFFECTED. FAILURE TO NOTIFY OWNER OF AN
IDENTIFIABLE CONFLICT PRIOR TO PROCEEDING WITH INSTALLATION RELIEVES OWNER
OF ANY OBLIGATION TO PAY FOR A RELATED CHANGE ORDER.
PAVING, GRADING AND DRAINAGE NOTES
1. ALL PAVING, CONSTRUCTION, MATERIALS, AND WORKMANSHIP WITHIN CITIES
RIGHT-OF-WAY SHALL BE IN ACCORDANCE WITH LOCAL OR CITY SPECIFICATIONS AND
STANDARDS (LATEST EDITION) OR FDOT SPECIFICATIONS AND STANDARDS (LATEST
EDITION) IF NOT COVERED BY LOCAL OR CITY REGULATIONS.
2. ALL UNPAVED AREAS IN EXISTING RIGHTS-OF-WAY DISTURBED BY CONSTRUCTION
SHALL BE REGRADED AND SODDED.
3. TRAFFIC CONTROL ON ALL FDOT, LOCAL AND CITY RIGHTS-OF-WAY SHALL MEET THE
REQUIREMENTS OF THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (U.S.
DOT/FHA) AND THE REQUIREMENTS OF THE STATE AND ANY LOCAL AGENCY HAVING
JURISDICTION. IN THE EVENT THAT THE CONTRACT DOCUMENTS AND THE
JURISDICTIONAL AGENCY REQUIREMENTS ARE NOT IN AGREEMENT, THE MOST
STRINGENT SHALL GOVERN.
4. THE CONTRACTOR SHALL GRADE THE SITE TO THE ELEVATIONS INDICATED AND SHALL
REGRADE WASHOUTS WHERE THEY OCCUR AFTER EVERY RAINFALL UNTIL A GRASS
STAND IS WELL ESTABLISHED OR ADEQUATE STABILIZATION OCCURS.
5. ALL OPEN AREAS WITHIN THE PROJECT SITE SHALL BE SODDED UNLESS INDICATED
OTHERWISE ON THE LANDSCAPE PLAN.
6. ALL AREAS INDICATED AS PAVEMENT SHALL BE CONSTRUCTED IN ACCORDANCE WITH
THE TYPICAL PAVEMENT SECTIONS AS INDICATED ON THE DRAWINGS.
7. WHERE EXISTING PAVEMENT IS INDICATED TO BE REMOVED AND REPLACED, THE
CONTRACTOR SHALL SAW CUT A MINIMUM 2" DEEP FOR A SMOOTH AND STRAIGHT JOINT
AND REPLACE THE PAVEMENT WITH THE SAME TYPE AND DEPTH OF MATERIAL AS
EXISTING OR AS INDICATED.
8. WHERE NEW PAVEMENT MEETS THE EXISTING PAVEMENT, THE CONTRACTOR SHALL
SAW CUT THE EXISTING PAVEMENT A MINIMUM 2" DEEP FOR A SMOOTH AND STRAIGHT
JOINT AND MATCH THE EXISTING PAVEMENT ELEVATION WITH THE PROPOSED
PAVEMENT UNLESS OTHERWISE INDICATED.
9. THE CONTRACTOR SHALL INSTALL FILTER FABRIC OVER ALL DRAINAGE STRUCTURES
FOR THE DURATION OF CONSTRUCTION AND UNTIL ACCEPTANCE OF THE PROJECT BY
THE OWNER. ALL DRAINAGE STRUCTURES SHALL BE CLEANED OF DEBRIS AS REQUIRED
DURING AND AT THE END OF CONSTRUCTION TO PROVIDE POSITIVE DRAINAGE FLOWS.
10. IF DEWATERING IS REQUIRED, THE CONTRACTOR SHALL OBTAIN ANY APPLICABLE
REQUIRED PERMITS. THE CONTRACTOR IS TO COORDINATE WITH THE OWNER AND THE
DESIGN ENGINEER PRIOR TO ANY EXCAVATION.
11. STRIP TOPSOIL AND ORGANIC MATTER FROM ALL AREAS OF THE SITE AS REQUIRED. IN
SOME CASES TOPSOIL MAY BE STOCKPILED ON SITE FOR PLACEMENT WITHIN
LANDSCAPED AREAS BUT ONLY AS DIRECTED BY THE OWNER.
12. FIELD DENSITY TESTS SHALL BE TAKEN AT INTERVALS IN ACCORDANCE WITH THE LOCAL
JURISDICTIONAL AGENCY OR TO FDOT STANDARDS. IN THE EVENT THAT THE CONTRACT
DOCUMENTS AND THE JURISDICTIONAL AGENCY REQUIREMENTS ARE NOT IN
AGREEMENT, THE MOST STRINGENT SHALL GOVERN.
13. ALL SLOPES AND AREAS DISTURBED BY CONSTRUCTION SHALL BE GRADED AS PER
PLANS. THE AREAS SHALL THEN BE SODDED OR SEEDED AS SPECIFIED IN THE PLANS,
FERTILIZED, MULCHED, WATERED AND MAINTAINED UNTIL HARDY GRASS GROWTH IS
ESTABLISHED IN ALL AREAS. ANY AREAS DISTURBED FOR ANY REASON PRIOR TO FINAL
ACCEPTANCE OF THE JOB SHALL BE CORRECTED BY THE CONTRACTOR AT NO
ADDITIONAL COST TO THE OWNER. ALL EARTHEN AREAS WILL BE SODDED OR SEEDED
AND MULCHED AS SHOWN ON THE LANDSCAPING PLAN.
14. ALL CUT OR FILL SLOPES SHALL BE 4 (HORIZONTAL) :1 (VERTICAL) OR FLATTER UNLESS
OTHERWISE SHOWN.
15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONTROL OF DUST AND DIRT
RISING AND SCATTERING IN THE AIR DURING CONSTRUCTION AND SHALL PROVIDE
WATER SPRINKLING OR OTHER SUITABLE METHODS OF CONTROL. THE CONTRACTOR
SHALL COMPLY WITH ALL GOVERNING REGULATIONS PERTAINING TO ENVIRONMENTAL
PROTECTION.
16. THE CONTRACTOR SHALL TAKE ALL REQUIRED MEASURES TO CONTROL TURBIDITY,
INCLUDING BUT NOT LIMITED TO THE INSTALLATION OF TURBIDITY BARRIERS AT ALL
LOCATIONS WHERE THE POSSIBILITY OF TRANSFERRING SUSPENDED SOLIDS INTO THE
RECEIVING WATER BODY EXISTS DUE TO THE PROPOSED WORK. TURBIDITY BARRIERS
MUST BE MAINTAINED IN EFFECTIVE CONDITION AT ALL LOCATIONS UNTIL
CONSTRUCTION IS COMPLETED AND DISTURBED SOIL AREAS ARE STABILIZED.
THEREAFTER, THE CONTRACTOR MUST REMOVE THE BARRIERS. AT NO TIME SHALL
THERE BE ANY OFF-SITE DISCHARGE WHICH VIOLATES THE WATER QUALITY STANDARDS
IN CHAPTER 17-302, FLORIDA ADMINISTRATIVE CODE.
17. SOD, WHERE CALLED FOR, MUST BE INSTALLED AND MAINTAINED ON EXPOSED SLOPES
WITHIN 48 HOURS OF COMPLETING FINAL GRADING, AND AT ANY OTHER TIME AS
NECESSARY, TO PREVENT EROSION, SEDIMENTATION OR TURBID DISCHARGES.
18. THE CONTRACTOR MUST REVIEW AND MAINTAIN A COPY OF THE ENVIRONMENTAL
RESOURCE PERMIT COMPLETE WITH ALL CONDITIONS, ATTACHMENTS, EXHIBITS, AND
PERMIT MODIFICATIONS IN GOOD CONDITION AT THE CONSTRUCTION SITE. THE
COMPLETE PERMIT MUST BE AVAILABLE FOR REVIEW UPON REQUEST BY WATER
MANAGEMENT DISTRICT REPRESENTATIVES.
19. THE CONTRACTOR SHALL ENSURE THAT ISLAND PLANTING AREAS AND OTHER PLANTING
AREAS ARE NOT COMPACTED AND DO NOT CONTAIN ROAD BASE MATERIALS. THE
CONTRACTOR SHALL ALSO EXCAVATE AND REMOVE ALL UNDESIRABLE MATERIAL FROM
ALL AREAS ON THE SITE TO BE PLANTED AND PROPERLY DISPOSED OF IN A LEGAL
MANNER.
20. THE CONTRACTOR SHALL INSTALL ALL UNDERGROUND STORM WATER PIPING PER
MANUFACTURER'S RECOMMENDATIONS.
21. PLEASE BE ADVISED THAT TV VIDEO INSPECTION IS REQUIRED FOR ALL STORMWATER
PIPES (PUBLIC OR PRIVATE) ASSOCIATED WITH THE PROPOSED DEVELOPMENT. IN
ADDITION, LASER PROFILE IS REQUIRED FOR ALL ADS/HDPE STORMWATER PIPES.
WATER AND SEWER UTILITY NOTES
1. THE CONTRACTOR SHALL CONSTRUCT GRAVITY SEWER LATERALS, MANHOLES GRAVITY
SEWER LINES AND DOMESTIC WATER AND FIRE PROTECTION SYSTEM AS SHOWN ON
THESE PLANS. THE CONTRACTOR SHALL FURNISH ALL NECESSARY MATERIALS,
EQUIPMENT, MACHINERY, TOOLS, MEANS OF TRANSPORTATION AND LABOR NECESSARY
TO COMPLETE THE WORK IN FULL AND COMPLETE ACCORDANCE WITH THE SHOWN,
DESCRIBED AND REASONABLY INTENDED REQUIREMENTS OF THE CONTRACT
DOCUMENTS AND JURISDICTIONAL AGENCY REQUIREMENTS. IN THE EVENT THAT THE
CONTRACT DOCUMENTS AND THE JURISDICTIONAL AGENCY REQUIREMENTS ARE NOT IN
AGREEMENT, THE MOST STRINGENT SHALL GOVERN.
2. ALL EXISTING UNDERGROUND UTILITY LOCATIONS SHOWN ARE APPROXIMATE. THE
CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS FOR UTILITY LOCATION AND
COORDINATION IN ACCORDANCE WITH THE NOTES CONTAINED IN THE GENERAL
CONSTRUCTION SECTION OF THIS SHEET.
3. THE CONTRACTOR SHALL RESTORE ALL DISTURBED VEGETATION IN KIND, UNLESS
SHOWN OTHERWISE.
4. DEFLECTION OF PIPE JOINTS AND CURVATURE OF PIPE SHALL NOT EXCEED THE
MANUFACTURER'S SPECIFICATIONS. SECURELY CLOSE ALL OPEN ENDS OF PIPE AND
FITTINGS WITH A WATERTIGHT PLUG WHEN WORK IS NOT IN PROGRESS. THE INTERIOR
OF ALL PIPES SHALL BE CLEAN AND JOINT SURFACES WIPED CLEAN AND DRY AFTER
THE PIPE HAS BEEN LOWERED INTO THE TRENCH. VALVES SHALL BE PLUMB AND
LOCATED ACCORDING TO THE PLANS.
5. ALL PHASES OF INSTALLATION, INCLUDING UNLOADING, TRENCHING, LAYING AND BACK
FILLING, SHALL BE DONE IN A FIRST CLASS WORKMANLIKE MANNER. ALL PIPE AND
FITTINGS SHALL BE CAREFULLY STORED FOLLOWING MANUFACTURER'S
RECOMMENDATIONS. CARE SHALL BE TAKEN TO AVOID DAMAGE TO THE COATING OR
LINING IN ANY D.I. PIPE FITTINGS. ANY PIPE OR FITTING WHICH IS DAMAGED OR WHICH
HAS FLAWS OR IMPERFECTIONS WHICH, IN THE OPINION OF THE ENGINEER OR OWNER,
RENDERS IT UNFIT FOR USE, SHALL NOT BE USED. ANY PIPE NOT SATISFACTORY FOR
USE SHALL BE CLEARLY MARKED AND IMMEDIATELY REMOVED FROM THE JOB SITE, AND
SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE.
6. WATER FOR FIRE FIGHTING SHALL BE AVAILABLE FOR USE PRIOR TO COMBUSTIBLES
BEING BROUGHT ON SITE.
7. ALL UTILITY AND STORM DRAIN TRENCHES LOCATED UNDER AREAS TO RECEIVE PAVING
SHALL BE COMPLETELY BACK FILLED IN ACCORDANCE WITH THE GOVERNING
JURISDICTIONAL AGENCY'S SPECIFICATIONS. IN THE EVENT THAT THE CONTRACT
DOCUMENTS AND THE JURISDICTIONAL AGENCY REQUIREMENTS ARE NOT IN
AGREEMENT, THE MOST STRINGENT SHALL GOVERN.
8. UNDERGROUND LINES SHALL BE SURVEYED BY A STATE OF FLORIDA PROFESSIONAL
LAND SURVEYOR PRIOR TO BACK FILLING.
9. CONTRACTOR SHALL PERFORM, AT HIS OWN EXPENSE, ANY AND ALL TESTS REQUIRED
BY THE SPECIFICATIONS AND/OR ANY AGENCY HAVING JURISDICTION. THESE TESTS MAY
INCLUDE, BUT MAY NOT BE LIMITED TO, INFILTRATION AND EXFILTRATION, TELEVISION
INSPECTION AND A MANDREL TEST ON GRAVITY SEWER. A COPY OF THE TEST RESULTS
SHALL BE PROVIDED TO THE UTILITY PROVIDER, OWNER AND JURISDICTIONAL AGENCY
AS REQUIRED.
EROSION CONTROL NOTES
1. THE STORM WATER POLLUTION PREVENTION PLAN ("SWPPP") IS COMPRISED OF THIS
EROSION CONTROL PLAN, THE STANDARD DETAILS, THE PLAN NARRATIVE,
ATTACHMENTS INCLUDED IN SPECIFICATIONS OF THE SWPPP, PLUS THE PERMIT AND
ALL SUBSEQUENT REPORTS AND RELATED DOCUMENTS.
2. ALL CONTRACTORS AND SUBCONTRACTORS INVOLVED WITH STORM WATER POLLUTION
PREVENTION SHALL OBTAIN A COPY OF THE STORM WATER POLLUTION PREVENTION
PLAN AND THE STATE OF FLORIDA NATIONAL POLLUTANT DISCHARGE ELIMINATION
SYSTEM GENERAL PERMIT (NPDES PERMIT) AND BECOME FAMILIAR WITH THEIR
CONTENTS.
3. THE CONTRACTOR SHALL IMPLEMENT BEST MANAGEMENT PRACTICES AS REQUIRED BY
THE SWPPP. ADDITIONAL BEST MANAGEMENT PRACTICES SHALL BE IMPLEMENTED AS
DICTATED BY CONDITIONS AT NO ADDITIONAL COST TO THE OWNER THROUGHOUT ALL
PHASES OF CONSTRUCTION.
4. BEST MANAGEMENT PRACTICES (BMP'S) AND CONTROLS SHALL CONFORM TO FEDERAL,
STATE, OR LOCAL REQUIREMENTS OR MANUAL OF PRACTICE, AS APPLICABLE. THE
CONTRACTOR SHALL IMPLEMENT ADDITIONAL CONTROLS AS DIRECTED BY THE
PERMITTING AGENCY OR OWNER.
5. EROSION CONTROL PLAN MUST CLEARLY DELINEATE ALL STATE WATERS. PERMITS FOR
ANY CONSTRUCTION ACTIVITY IMPACTING STATE WATERS OR REGULATED WETLANDS
MUST BE MAINTAINED ON SITE AT ALL TIMES.
6. THE CONTRACTOR SHALL MINIMIZE CLEARING TO THE MAXIMUM EXTENT PRACTICAL OR
AS REQUIRED BY THE GENERAL PERMIT.
7. CONTRACTOR SHALL DENOTE ON PLAN THE TEMPORARY PARKING AND STORAGE AREA
WHICH SHALL ALSO BE USED AS THE EQUIPMENT MAINTENANCE AND CLEANING AREA,
EMPLOYEE PARKING AREA, AND AREA FOR LOCATING PORTABLE FACILITIES, OFFICE
TRAILERS, AND TOILET FACILITIES.
8. ALL WASH WATER (CONCRETE TRUCKS, VEHICLE CLEANING, EQUIPMENT CLEANING,
ETC.) SHALL BE DETAINED AND PROPERLY TREATED OR DISPOSED.
9. SUFFICIENT OIL AND GREASE ABSORBING MATERIALS AND FLOTATION BOOMS SHALL BE
MAINTAINED ON SITE OR READILY AVAILABLE TO CONTAIN AND CLEAN-UP FUEL OR
CHEMICAL SPILLS AND LEAKS.
10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DUST CONTROL ON SITE. THE USE OF
MOTOR OILS AND OTHER PETROLEUM BASED OR TOXIC LIQUIDS FOR DUST
SUPPRESSION OPERATIONS IS PROHIBITED.
11. RUBBISH, TRASH, GARBAGE, LITTER, OR OTHER SUCH MATERIALS SHALL BE DEPOSITED
INTO SEALED CONTAINERS. MATERIALS SHALL BE PREVENTED FROM LEAVING THE
PREMISES THROUGH THE ACTION OF WIND OR STORM WATER DISCHARGE INTO
DRAINAGE DITCHES OR WATERS OF THE STATE.
12. ALL STORM WATER POLLUTION PREVENTION MEASURES PRESENTED ON THE PLAN,
SHALL BE INITIATED AS SOON AS PRACTICABLE.
DEMOLITION NOTES
1. ALL MATERIAL REMOVED FROM THIS SITE BY THE CONTRACTOR SHALL BE DISPOSED OF
BY THE CONTRACTOR IN A LEGAL MANNER.
2. REFER TO THE TOPOGRAPHIC SURVEY FOR ADDITIONAL DETAILS OF EXISTING
STRUCTURES, ETC., LOCATED WITHIN THE PROJECT SITE. UNLESS OTHERWISE NOTED,
ALL EXISTING BUILDINGS, STRUCTURES, SLABS, CONCRETE, ASPHALT, DEBRIS PILES,
SIGNS, AND ALL APPURTENANCES ARE TO BE REMOVED FROM THE SITE BY THE
CONTRACTOR AND PROPERLY DISPOSED OF IN A LEGAL MANNER AS PART OF THIS
CONTRACT. SOME ITEMS TO BE REMOVED MAY NOT BE DEPICTED ON THE
TOPOGRAPHIC SURVEY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VISIT THE SITE
AND DETERMINE THE FULL EXTENT OF ITEMS TO BE REMOVED. IF ANY ITEMS ARE IN
QUESTION, THE CONTRACTOR SHALL CONTACT THE OWNER PRIOR TO REMOVAL OF
SAID ITEMS.
3. THE CONTRACTOR SHALL REFER TO THE DEMOLITION PLAN FOR
DEMOLITION/PRESERVATION OF EXISTING TREES. ALL TREES NOT SPECIFICALLY
SHOWN TO BE PRESERVED OR RELOCATED SHALL BE REMOVED AS A PART OF THIS
CONTRACT. TREE PROTECTION FENCING SHALL BE INSTALLED PRIOR TO ANY
DEMOLITION.
EROSION CONTROL NOTES (CONT.)
13. STABILIZATION PRACTICES SHOULD BE INITIATED AS SOON AS PRACTICAL, BUT IN NO
CASE MORE THAN 7 DAYS WHERE CONSTRUCTION HAS TEMPORARILY CEASED.
14. DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITY HAS
PERMANENTLY STOPPED SHALL BE PERMANENTLY SEEDED. THESE AREAS SHALL BE
SEEDED NO LATER THAN 7 DAYS AFTER THE LAST CONSTRUCTION ACTIVITY OCCURRED
IN THESE AREAS. REFER TO SECTION 981 OF THE STANDARD SPECIFICATIONS FOR
SEEDING AND MAINTENANCE REQUIREMENTS.
15. IF THE ACTION OF VEHICLES TRAVELING OVER THE GRAVEL CONSTRUCTION
ENTRANCES IS NOT SUFFICIENT TO REMOVE THE MAJORITY OF DIRT OR MUD, THEN THE
TIRES MUST BE WASHED BEFORE THE VEHICLES ENTER A PUBLIC ROAD. IF WASHING IS
USED, PROVISIONS MUST BE MADE TO INTERCEPT THE WASH WATER AND TRAP THE
SEDIMENT BEFORE IT IS CARRIED OFF THE SITE.
16. ALL MATERIALS SPILLED, DROPPED, WASHED, OR TRACKED FROM VEHICLES ONTO
ROADWAYS OR INTO STORM DRAINS MUST BE REMOVED AS SOON AS POSSIBLE.
17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING SEDIMENT IN THE
DETENTION POND AND ANY SEDIMENT THAT MAY HAVE COLLECTED IN THE STORM
SEWER DRAINAGE SYSTEMS IN CONJUNCTION WITH THE STABILIZATION OF THE SITE.
18. ON-SITE & OFF SITE SOIL STOCKPILE AND BORROW AREAS SHALL BE PROTECTED FROM
EROSION AND SEDIMENTATION THROUGH IMPLEMENTATION OF BEST MANAGEMENT
PRACTICES. STOCKPILE AND BORROW AREA LOCATIONS SHALL BE NOTED ON THE
EROSION CONTROL PLAN AND PERMITTED IN ACCORDANCE WITH GENERAL PERMIT
REQUIREMENTS.
19. SLOPES SHALL BE LEFT IN A ROUGHENED CONDITION DURING THE GRADING PHASE TO
REDUCE RUNOFF VELOCITIES AND EROSION.
20. DUE TO GRADE CHANGES DURING THE DEVELOPMENT OF THE PROJECT, THE
CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING THE EROSION CONTROL
MEASURES (SILT FENCES, ETC.) TO PREVENT EROSION.
21. ALL CONSTRUCTION SHALL BE STABILIZED AT THE END OF EACH WORKING DAY, THIS
INCLUDES BACK FILLING OF TRENCHES FOR UTILITY CONSTRUCTION AND PLACEMENT
OF GRAVEL OR BITUMINOUS PAVING FOR ROAD CONSTRUCTION.
MAINTENANCE
ALL MEASURES STATED ON THE EROSION AND SEDIMENT CONTROL PLAN, AND IN THE
STORM WATER POLLUTION PREVENTION PLAN, SHALL BE MAINTAINED IN FULLY
FUNCTIONAL CONDITION UNTIL NO LONGER REQUIRED FOR A COMPLETED PHASE OF
WORK OR FINAL STABILIZATION OF THE SITE. ALL EROSION AND SEDIMENTATION
CONTROL MEASURES SHALL BE CHECKED BY A QUALIFIED PERSON AT LEAST ONCE
EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS OF THE END OF A 0.5"
RAINFALL EVENT, AND CLEANED AND REPAIRED IN ACCORDANCE WITH THE
FOLLOWING:
1. INLET PROTECTION DEVICES AND BARRIERS SHALL BE REPAIRED OR REPLACED
IF THEY SHOW SIGNS OF UNDERMINING, OR DETERIORATION.
2. ALL SEEDED AREAS SHALL BE CHECKED REGULARLY TO SEE THAT A GOOD
STAND IS MAINTAINED. AREAS SHOULD BE FERTILIZED, WATERED AND
RESEEDED AS NEEDED. FOR MAINTENANCE REQUIREMENTS REFER TO SECTION
981 OF THE STANDARD SPECIFICATIONS.
3. SILT FENCES SHALL BE REPAIRED TO THEIR ORIGINAL CONDITIONS IF DAMAGED.
SEDIMENT SHALL BE REMOVED FROM THE SILT FENCES WHEN IT REACHES
ONE-HALF THE HEIGHT OF THE SILT FENCE.
4. THE CONSTRUCTION ENTRANCES SHALL BE MAINTAINED IN A CONDITION WHICH
WILL PREVENT TRACKING OR FLOW OF MUD ONTO PUBLIC RIGHTS-OF-WAY. THIS
MAY REQUIRE PERIODIC TOP DRESSING OF THE CONSTRUCTION ENTRANCES AS
CONDITIONS DEMAND.
5. THE TEMPORARY PARKING AND STORAGE AREA SHALL BE KEPT IN GOOD
CONDITION (SUITABLE FOR PARKING AND STORAGE). THIS MAY REQUIRE
PERIODIC TOP DRESSING OF THE TEMPORARY PARKING AS CONDITIONS
DEMAND.
6. OUTLET STRUCTURES IN THE SEDIMENTATION BASINS SHALL BE MAINTAINED IN
OPERATIONAL CONDITIONS AT ALL TIMES. SEDIMENT SHALL BE REMOVED FROM
SEDIMENT BASINS OR TRAPS WHEN THE DESIGN CAPACITY HAS BEEN REDUCED
BY 55 CUBIC YARDS / ACRE.
7. ALL MAINTENANCE OPERATIONS SHALL BE DONE IN A TIMELY MANNER BUT IN NO
CASE LATER THAN 2 CALENDAR DAYS FOLLOWING THE INSPECTION.
ADA NOTES
1. CURB RAMPS ALONG PUBLIC STREETS AND IN THE PUBLIC RIGHT-OF-WAY SHALL BE
CONSTRUCTED BASED ON THE CITY STANDARD CONSTRUCTION DETAILS AND
SPECIFICATIONS.
2. PRIVATE CURB RAMPS ON THE SITE (I.E. OUTSIDE PUBLIC STREET RIGHT-OF-WAY) SHALL
CONFORM TO ADA STANDARDS AND SHALL HAVE A DETECTABLE WARNING SURFACE THAT
IS FULL WIDTH AND FULL DEPTH OF THE CURB RAMP, NOT INCLUDING FLARES.
3. ALL ACCESSIBLE ROUTES, GENERAL SITE AND BUILDING ELEMENTS, RAMPS, CURB RAMPS,
STRIPING, AND PAVEMENT MARKINGS SHALL CONFORM TO ADA STANDARDS FOR
ACCESSIBLE DESIGN, LATEST EDITION.
4. ANY COMPONENTS OF THE PROJECT SERVING MULTIFAMILY DWELLINGS IN BUILDINGS
THAT HAVE 4 OR MORE UNITS PER DWELLING SHALL ALSO CONFORM TO THE FAIR
HOUSING ACT (FHA), AND COMPLY WITH THE FAIR HOUSING ACT DESIGN MANUAL BY THE
US DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT.
5. BEFORE PLACING PAVEMENT, CONTRACTOR SHALL VERIFY THAT SUITABLE ACCESSIBLE
PEDESTRIAN ROUTES (PER ADA AND FHA) EXIST TO AND FROM EVERY DOOR AND ALONG
SIDEWALKS, ACCESSIBLE PARKING SPACES, ACCESS AISLES, AND ACCESSIBLE ROUTES. IN
NO CASE SHALL AN ACCESSIBLE RAMP SLOPE EXCEED 1 VERTICAL TO 12 HORIZONTAL. IN
NO CASE SHALL SIDEWALK CROSS SLOPE EXCEED 2.0 PERCENT. IN NO CASE SHALL
LONGITUDINAL SIDEWALK SLOPE EXCEED 5.0 PERCENT. ACCESSIBLE PARKING SPACES
AND ACCESS AISLES SHALL NOT EXCEED 2.0 PERCENT SLOPE IN ANY DIRECTION.
6. CONTRACTOR SHALL TAKE FIELD SLOPE MEASUREMENTS ON FINISHED SUBGRADE AND
FORM BOARDS PRIOR TO PLACING PAVEMENT TO VERIFY THAT ADA SLOPE REQUIREMENTS
ARE PROVIDED. CONTRACTOR SHALL CONTACT ENGINEER PRIOR TO PAVING IF ANY
EXCESSIVE SLOPES ARE ENCOUNTERED. NO CONTRACTOR CHANGE ORDERS WILL BE
ACCEPTED FOR ADA SLOPE COMPLIANCE ISSUES.
O U
O U
O U
O U
O U
O U
O U
O U
O U
O U
O U
O U
O U
O U
O U
O U
O U
O U
O U
O U
O U
O U
O U
O U
O U
O U
O U
O U
O U
OUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOU
OUOUOUOUOUOUOUOUOUOO
'-0
25'-0"
1'-0"
14'-4"
14'-6"
5'
-0
5'
-0
14'-6"
PONCAN CIRCLE
EXISTING BUILDING
G
AL
L
BO
U
LE
VA
R
D N
B
G
AL
L
BO
U
LE
VA
R
D S
B
5'-0"
EXISTING ENTRY MONUMENT SIGN (TYP)
EXISTING ASPHALT SIDEWALK
APPROXIMATE LOCATION OF FDOT R.O.W.
EXISTING OVERHEAD UTILITY (TYP)
EXISTING SIGN (TYP)
PROPOSED CITY GATEWAY MONUMENT SIGN
DFEPARTURE SIGHT TRIANGLES PER THE 2018
FDOT UNIFORM MINIMUM STANDARS OF DESIGN
CONSTRUCTION AND MAINTENANCE FOR STREETS
AND HIGHWAYS (FDOT DESIGN MANUAL)
N O
R
TH
M O
N U
M
EN
T
SI
G N
S
IT
E
PL
AN
H-1
LI
C
EN
SE
D P
R O
FE
SS
IO
N
AL
C
IT
Y
PA
R
KS
S
IG
N
AG
E
PR
EP
AR
ED
F
O R
C
IT
Y O
F
ZE
PH
YR
H
IL
LS
CALL 2 WORKING DAYS
BEFORE YOU DIG
IT'S THE LAW!
DIAL 811
NORTH
2' -0
3'
-0
13'-8"
17'-11"
1' -9
5"
3'-4"
2'-1"
WELCOME TO
ZEPHYRHILLS
3" 3"
3"
B H-2
A H-2
C H-4
6°
6"
5"
4'-3"
1'-0" 9"
3'-1" 6'-5"
9' -1
1"
3"
3"
3"
10"
11'-11"
2"
2"
RADIUS
3" OVERHANG
3' -3
4"
4" 2'
-8
2" 3"
2' -8
FOG TURQUOISE GREEN TILE BY ALTOGLASS
FINISHED GRADE
FDL COUNTRY LIMESTONE VENEER BY OLDCASTLE. GAPS
BETWEEN LIMESTONE PIECES TO BE NO GREATER THAN 1/2"
MITER ALL CORNER JOINTS
MITER ALL CORNER JOINTS
SEE ENLARGEMENT A
ENLARGEMENT A
TYPICAL CAP OVERHANG
PRECAST CONCRETE CAP
W/ SAND FINISH (TYP.)
DRIP EDGE, APPLICABLE TO
ALL CAP ENDS
FINISHED SURFACE
FRONT ELEVATION
BLACK PIN MOUNTED ALUMINUM LETTERING, BACKLIT.
FONT SHALL BE "BLUE HIGHWAY" COORDINATE WITH
THE CITY FOR BRANDING GUIDELINES.
5"
PRECAST CONCRETE WALL PANEL WITH WHITE STUCCO FINISH
3'-4"
ELEVATION A ELEVATION B
2"
NOTE:
1. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND PHYSICAL SAMPLES OF ALL MATERIALS, FINISHES, AND EQUIPMENT TO LANDSCAPE
ARCHITECT FOR REVIEW & APPROVAL PRIOR TO CONSTRUCTION.
LIMESTONE VENEER, SMOOTH CUT
PRECAST CONCRETE CAP W/ SAND FINISH (TYP.)
PIN MOUNTED ALUMINUM LOGO; COLOR SELECTIONS SHALL
REFLECT CITY OF ZEPHYRHILLS LOGO COLOR STANDARDS
WHITE STUCCO FINISH
PRECAST CONCRETE CAP W/ SAND FINISH (TYP.)
TILE PATTERN SHALL BE CONTINUOUS ALONG ALL FACES
MITER ALL CORNER JOINTS
FINISHED GRADE
FOG TURQUOISE GREEN TILE BY ALTOGLASS
FDL COUNTRY LIMESTONE VENEER BY OLDCASTLE. GAPS
BETWEEN LIMESTONE PIECES TO BE NO GREATER THAN 1/2"
4'-3"4'-3"
N O
R
TH
M O
N U
M
EN
T
SI
G N
E
LE
VA
TI
O N
S
H-2
LI
C
EN
SE
D P
R O
FE
SS
IO
N
AL
C
IT
Y
PA
R
KS
S
IG
N
AG
E
PR
EP
AR
ED
F
O R
C
IT
Y O
F
ZE
PH
YR
H
IL
LS
WELCOME TO
ZEPHYRHILLS
BACK ELEVATION
2" 4'
-9
6" 1'
-4
7" 1'
-1 0"
4" 4"
3' -3
5"
3"
3"
MITER ALL CORNER JOINTS
SEE ENLARGEMENT A
ON SHEET H-2
FOG TURQUOISE GREEN TILE BY ALTOGLASS
FINISHED GRADE
FDL COUNTRY LIMESTONE VENEER BY OLDCASTLE. GAPS
BETWEEN LIMESTONE PIECES TO BE NO GREATER THAN 1/2"
MITER ALL CORNER JOINTS
13'-8"
17'-11"
4'-3"
B H-2
A H-2
C H-4
NOTE:
1. SEE ELEVATION A ON SHEET H-2 FOR FINISHES
BLACK PIN MOUNTED ALUMINUM LETTERING, BACKLIT.
FONT SHALL BE "BLUE HIGHWAY" COORDINATE WITH
THE CITY FOR BRANDING GUIDELINES.
PRECAST CONCRETE WALL PANEL WITH WHITE STUCCO FINISH
8" 7"
1' -6
N O
R
TH
M O
N U
M
EN
T
SI
G N
E
LE
VA
TI
O N
S
H-3
LI
C
EN
SE
D P
R O
FE
SS
IO
N
AL
C
IT
Y
PA
R
KS
S
IG
N
AG
E
PR
EP
AR
ED
F
O R
C
IT
Y O
F
ZE
PH
YR
H
IL
2'-6"
1' -0
2'
-0
3' -0
SECTION E
6' -0
1' -0
8"
SECTION D
SECTION C
1' -0
6"
D H-4
2' -0
3'
-0
E H-4
3"
4'-3"
1"
1'-0"
2' -6
EQ
1' -0
1' -0
3"
5'-0"
5' -0
3"
EQ. EQ.
EQ
5'-0"
1/2" MORTAR SETTING BED
LAY IN FULL MORTAR SETTING BED
DRILL AND EPOXY PRECAST SIGN REINFORCING
FINISHED GRADE
GROUT
LIMESTONE VENEER, SMOOTH CUT
PRECAST CONCRETE, 3" THICKNESS AND 3" OVERHANG
8"X8"X16" CMU BLOCK LAID IN RUNNING BOND REINFORCED W/
#5@32". PROVIDE #5 IN TWO END CELLS EA. END.
POURED IN PLACE CONCRETE
GROUT
PRECAST CONCRETE SIGN WITH WHITE STUCCO FINISH
MITERED END JOINTS
CONCRETE FOOTING
BOND BEAM WITH #4 TIES @ 48"
8" X 8" X 16" CMU BLOCK LAID IN RUNNING BOND
REINFORCED W/ #5 @ 32" IN EACH CELL
8" WIDE CONCRETE CAP BEAM W/ (2) #5 CONT. PROVIDE CORNER
BARS W/ 2'-0" LEGS AT ALL CORNERS
19/32 CD EXP. 1 PLYWOOD WITH
WIRE LATH AND STUCCO
NESTED TRACKS AT 12" VERTICAL MAXIMUM
6" CFS STUDS AT 12" OC
CONT. BOTTOM TRACK
(2) #5 AT 16" O.C.
EXTEND BOND BEAM REINFORCING THROUGH MASONRY COL.
(6) #5 CONT. TOP & BOTT.
6" STUDS
#5 @ 12" TOP & BOTT.
8"X8" BOND BEAM W/ (2) #5 CONT.
HOOK VERTICAL WALL REINFORCEMENT INTO BOND BEAM
1/2" BLACK PIN MOUNTED ALUMINUM LETTERING, BACKLIT. FONT SHALL BE
"BLUE HIGHWAY" COORDINATE WITH THE CITY FOR BRANDING GUIDELINES.
#5 @ 12"
(3) #5 CONT. EXTEND 2'-0" MIN.
INTO FOOTING BEYOND
SEE ENLARGEMENT ON H-2
2"
FULLY GROUT CMU WALL BELOW GRADE
3' -0
" L
AP
3" C
LR
FOG TURQUOISE GREEN TILE BY ALTOGLASS
FOG TURQUOISE GREEN TILE BY ALTOGLASS
FOG TURQUOISE GREEN TILE BY ALTOGLASS
FDL COUNTRY LIMESTONE VENEER BY OLDCASTLE. GAPS
BETWEEN LIMESTONE PIECES TO BE NO GREATER THAN 1/2"
FDL COUNTRY LIMESTONE VENEER BY OLDCASTLE. GAPS BETWEEN LIMESTONE
PIECES TO BE NO GREATER THAN 1/2"
4'-3"
DIM VARIES 1"-2"
N O
R
TH
M O
N U
M
EN
T
SI
G N
S
TR
U C
TU
R
AL
D
ET
AI
LS
H-4
LI
C
EN
SE
D P
R O
FE
SS
IO
N
AL
C
IT
Y
PA
R
KS
S
IG
N
AG
E
PR
EP
AR
ED
F
O R
C
IT
Y O
F
ZE
PH
YR
H
IL
SO
TH
M
O N
U M
EN
T
SI
G
N C
O
VE
R S
H
EE
T
C-0
LI
C
EN
SE
D P
R O
FE
SS
IO
N
AL
C
IT
Y
PA
R
KS
S
IG
N
AG
E
PR
EP
AR
ED
F
O R
C
IT
Y O
F
ZE
PH
YR
H
IL
LS
FOR
CITY OF ZEPHYRHILLS
June 30, 2025 NORTH
PROJECT LOCATION
PASCO COUNTY
FOR
WWW.KIMLEY-HORN.COM
1800 SECOND STREET, SUITE 900, SARASOTA, FL 34236
PHONE: 941-379-7600
KIMLEY-HORN AND ASSOCIATES, INC.
7TH STREET AND 5TH STREET
ZEPHYRHILLS, FL 33542
CONSTRUCTION PLANS
7TH STREET
5TH STREET
PROJECT
SITE
SOUTH MONUMENT SIGN
PROJECT TEAM PROJECT DATA
ENGINEER
KIMLEY HORN AND ASSOCIATES, INC
ADDRESS: 200 CENTRAL AVE SUITE 600, ST. PETERSBURG, FL 33701
CONTACT: DUSTIN BALLARD, P.E .
TEL: (941) 379-7600
CONTACTS
PROJECT TEAM
PARCEL ID #:
12-26-21-0000-04200-0000 12-26-21-0000-04900-0050
PROJECT DATA
CONTACTS
OWNER
CITY OF ZEPHYRHILLS
ADDRESS: 5335 8TH STREET, ZEPHYRHILLS, FLORIDA 33542
TEL: (813) 780-0000
SURVEYOR
CITY OF ZEPHYRHILLS
ADDRESS: 5335 8TH STREET, ZEPHYRHILLS, FLORIDA 33542
TEL: (813) 780-0000
CITY OF ZEPHYRHILLS PUBLIC WORKS
ADDRESS: 39421 SOUTH AVENUE, ZEPHYRHILLS, FL 33542
CONTACT: SHANE LEBLANC
TEL: 813-780-0022
CABLE/FIBER
CHARTER COMMUNICATIONS
ADDRESS: 37059 KINGS CROWN DRIVE, ZEPHYRHILLS, FL 33541
CONTACT: USIC DISPATCH OFFICE *
TEL: (800) 778-9140
SEWER/WATER
CITY OF ZEPHYRHILLS
ADDRESS: 5335 8TH STREET, ZEPHYRHILLS, FL 33542
CONTACT: BRUCE SELLARS
TEL: (813) 780-0000 X3567
ELECTRIC
DUKE ENERGY
ADDRESS: 299 1ST AVENUE N, ST. PETERSBURG, FL 33701
CONTACT: USIC DISPATCH
TEL: (800) 778-9140
CONTACT: DUKE'S CUSTOMER SERVICE CENTER
TEL: (407) 629-1010
CATV/COMMUNICATION LINES
FRONTIER COMMUNICATIONS
ADDRESS: 4911 BRUCE B DOWNS BOULEVARD, WESLEY CHAPEL, FL 33544
CONTACT: USIC DISPATCH
TEL: (800) 778-9140
CONTACT: ALBERT RIVAS
TEL: (813) 431-2909
GAS
TECO PEOPLES GAS
ADDRESS: 702 N FRANLKIN STREET, TAMPA, FL 33602
CONTACT: ROGER ROSELLO
TEL: (813) 422-2805
CONTACT: SHARON BECK
TEL: (813) 853-9337
CONTACT: TECO PEOPLES GAS CUSTOMER SERVICE**
TEL: (877) 832-6747
FIBER
UNITI FIBER LLC
ADDRESS: 805 EXECUTIVE CENTER DRIVE W, ST.
PETERSBURG, FL 33702
CONTACT: SOUTHERN LIGHT EMERGENCY RESPONSE
DISPATCH
TEL: (877) 652-2321
LANDSCAPE ARCHITECT
KIMLEY HORN AND ASSOCIATES, INC
ADDRESS: 1800 MAIN STREET, SUITE 900, SARASOTA, FL 34236
CONTACT: JAMES R. PANKONIN, P.L.A.
TEL: (941) 379-7620
SHEET LIST TABLE
Sheet Number Sheet Title
C-0 SOUTH MONUMENT SIGN COVER SHEET
C-1 SOUTH MONUMENT SIGN GENERAL NOTES
H-1 SOUTH MONUMENT SIGN SITE PLAN
H-2 SOUTH MONUMENT SIGN ELEVATIONS
H-3 SOUTH MONUMENT SIGN STRUCTURAL DETAILS
H-4 ######################################
STREET LIGHTS/TRAFFIC CONTROL
PASCO COUNTY TRAFFIC OPERATIONS DIVISION
ADDRESS: 7536 STATE STREET, NEW PORT RICHEY, FL 34654
CONTACT: JONAH JOHNSON
TEL: (727) 494-5234
CONTACT: MATTHEW WITHUM
TEL: (727) 847-8139 X8384
ZAYO GROUP (FORMERLY LIGHTWAVE, LLC)
ADDRESS: 7925 EVIES WAY, PORT RICHEY, FL 34668
CONTACT: LOCATE CENTER / NEIL SCARBOROUGH
TEL: (800) 961-6500
CONTACT: STAKE CENTER / LOUIS SIMONE
TEL: (772) 579-8956
CONTACT: JON RAY
TEL: (813) 417-2184
SO
TH
M
O N
U M
EN
T
SI
G
N G
EN
ER
AL
N
O
TE
S
C-1
LI
C
EN
SE
D P
R O
FE
SS
IO
N
AL
C
IT
Y
PA
R
KS
S
IG
N
AG
E
PR
EP
AR
ED
F
O R
C
IT
Y O
F
ZE
PH
YR
H
IL
LS
GENERAL CONSTRUCTION NOTES
1. THE CONTRACTOR AND SUBCONTRACTORS SHALL OBTAIN A COPY OF THE FLORIDA
DEPARTMENT OF TRANSPORTATION "STANDARD SPECIFICATIONS FOR ROAD AND
BRIDGE CONSTRUCTION" (LATEST EDITION) AND BECOME FAMILIAR WITH THE CONTENTS
PRIOR TO COMMENCING WORK, AND, UNLESS OTHERWISE NOTED, ALL WORK SHALL
CONFORM AS APPLICABLE TO THESE STANDARDS AND SPECIFICATIONS.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING ALL MATERIAL AND LABOR
TO CONSTRUCT THE FACILITY AS SHOWN AND DESCRIBED IN THE CONSTRUCTION
DOCUMENTS IN ACCORDANCE WITH THE APPROPRIATE APPROVING AUTHORITIES,
SPECIFICATIONS AND REQUIREMENTS. CONTRACTOR SHALL CLEAR AND GRUB ALL
AREAS UNLESS OTHERWISE INDICATED, REMOVING TREES, STUMPS, ROOTS, MUCK,
EXISTING PAVEMENT AND ALL OTHER DELETERIOUS MATERIAL.
3. EXISTING UTILITIES SHOWN ARE LOCATED ACCORDING TO THE INFORMATION AVAILABLE
TO THE ENGINEER AT THE TIME OF THE TOPOGRAPHIC SURVEY AND HAVE NOT BEEN
INDEPENDENTLY VERIFIED BY THE OWNER OR THE ENGINEER. GUARANTEE IS NOT
MADE THAT ALL EXISTING UNDERGROUND UTILITIES ARE SHOWN OR THAT THE
LOCATION OF THOSE SHOWN ARE ENTIRELY ACCURATE. FINDING THE ACTUAL LOCATION
OF ANY EXISTING UTILITIES IS THE CONTRACTOR'S RESPONSIBILITY AND SHALL BE
DONE BEFORE HE COMMENCES ANY WORK IN THE VICINITY. FURTHERMORE, THE
CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES DUE TO THE
CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL
UNDERGROUND UTILITIES. THE OWNER OR ENGINEER WILL ASSUME NO LIABILITY FOR
ANY DAMAGES SUSTAINED OR COST INCURRED BECAUSE OF THE OPERATIONS IN THE
VICINITY OF EXISTING UTILITIES OR STRUCTURES, NOR FOR TEMPORARY BRACING AND
SHORING OF SAME. IF IT IS NECESSARY TO SHORE, BRACE, SWING OR RELOCATE A
UTILITY, THE UTILITY COMPANY OR DEPARTMENT AFFECTED SHALL BE CONTACTED AND
THEIR PERMISSION OBTAINED REGARDING THE METHOD TO USE FOR SUCH WORK.
4. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE VARIOUS UTILITY
COMPANIES WHICH MAY HAVE BURIED OR AERIAL UTILITIES WITHIN OR NEAR THE
CONSTRUCTION AREA BEFORE COMMENCING WORK. THE CONTRACTOR SHALL
PROVIDE 48 HOURS MINIMUM NOTICE TO ALL UTILITY COMPANIES PRIOR TO BEGINNING
CONSTRUCTION. A LIST OF THE UTILITY COMPANIES WHICH THE CONTRACTOR MUST
CALL BEFORE COMMENCING WORK IS PROVIDED ON THE COVER SHEET OF THESE
CONSTRUCTION PLANS. THIS LIST SERVES AS A GUIDE ONLY AND IS NOT INTENDED TO
LIMIT THE UTILITY COMPANIES WHICH THE CONTRACTOR MAY WISH TO NOTIFY.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL REQUIRED
CONSTRUCTION PERMITS AND BONDS IF REQUIRED PRIOR TO CONSTRUCTION.
6. THE CONTRACTOR SHALL HAVE AVAILABLE AT THE JOB SITE AT ALL TIMES ONE COPY OF
THE CONSTRUCTION DOCUMENTS INCLUDING PLANS, SPECIFICATIONS, AND SPECIAL
CONDITIONS AND COPIES OF ANY REQUIRED CONSTRUCTION PERMITS.
7. ANY DISCREPANCIES ON THE DRAWINGS SHALL BE IMMEDIATELY BROUGHT TO THE
ATTENTION OF THE OWNER AND ENGINEER BEFORE COMMENCING WORK. NO FIELD
CHANGES OR DEVIATIONS FROM DESIGN ARE TO BE MADE WITHOUT PRIOR APPROVAL
OF THE OWNER AND NOTIFICATION TO THE ENGINEER.
8. ALL COPIES OF COMPACTION, CONCRETE AND OTHER REQUIRED TEST RESULTS ARE
TO BE SENT TO THE OWNER AND DESIGN ENGINEER OF RECORD DIRECTLY FROM THE
TESTING AGENCY.
9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUBMITTING TO THE ENGINEER A
CERTIFIED RECORD SURVEY SIGNED AND SEALED BY A PROFESSIONAL LAND
SURVEYOR REGISTERED IN THE STATE OF FLORIDA DEPICTING THE ACTUAL FIELD
LOCATION OF ALL CONSTRUCTED IMPROVEMENTS THAT ARE REQUIRED BY THE
JURISDICTIONAL AGENCIES FOR THE CERTIFICATION PROCESS. ALL SURVEY COSTS
WILL BE THE CONTRACTORS RESPONSIBILITY.
10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DOCUMENTING AND MAINTAINING
AS-BUILT INFORMATION WHICH SHALL BE RECORDED AS CONSTRUCTION PROGRESSES
OR AT THE COMPLETION OF APPROPRIATE CONSTRUCTION INTERVALS AND SHALL BE
RESPONSIBLE FOR PROVIDING AS-BUILT DRAWINGS TO THE OWNER FOR THE PURPOSE
OF CERTIFICATION TO JURISDICTIONAL AGENCIES AS REQUIRED. ALL AS-BUILT DATA
SHALL BE COLLECTED BY A STATE OF FLORIDA PROFESSIONAL LAND SURVEYOR WHOSE
SERVICES ARE ENGAGED BY THE CONTRACTOR.
11. ANY WELLS DISCOVERED ON SITE THAT WILL HAVE NO USE MUST BE PLUGGED BY A
LICENSED WELL DRILLING CONTRACTOR IN A MANNER APPROVED BY ALL
JURISDICTIONAL AGENCIES. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING
ANY WELL ABANDONMENT PERMITS REQUIRED.
12. ANY WELL DISCOVERED DURING EARTH MOVING OR EXCAVATION SHALL BE REPORTED
TO THE APPROPRIATE JURISDICTIONAL AGENCIES WITHIN 24 HOURS AFTER DISCOVERY
IS MADE.
13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THAT THE PROPOSED
IMPROVEMENTS SHOWN ON THE PLANS DO NOT CONFLICT WITH ANY KNOWN EXISTING
OR OTHER PROPOSED IMPROVEMENTS. IF ANY CONFLICTS ARE DISCOVERED, THE
CONTRACTOR SHALL NOTIFY THE OWNER PRIOR TO INSTALLATION OF ANY PORTION OF
THE SITE WORK THAT WOULD BE AFFECTED. FAILURE TO NOTIFY OWNER OF AN
IDENTIFIABLE CONFLICT PRIOR TO PROCEEDING WITH INSTALLATION RELIEVES OWNER
OF ANY OBLIGATION TO PAY FOR A RELATED CHANGE ORDER.
PAVING, GRADING AND DRAINAGE NOTES
1. ALL PAVING, CONSTRUCTION, MATERIALS, AND WORKMANSHIP WITHIN CITIES
RIGHT-OF-WAY SHALL BE IN ACCORDANCE WITH LOCAL OR CITY SPECIFICATIONS AND
STANDARDS (LATEST EDITION) OR FDOT SPECIFICATIONS AND STANDARDS (LATEST
EDITION) IF NOT COVERED BY LOCAL OR CITY REGULATIONS.
2. ALL UNPAVED AREAS IN EXISTING RIGHTS-OF-WAY DISTURBED BY CONSTRUCTION
SHALL BE REGRADED AND SODDED.
3. TRAFFIC CONTROL ON ALL FDOT, LOCAL AND CITY RIGHTS-OF-WAY SHALL MEET THE
REQUIREMENTS OF THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (U.S.
DOT/FHA) AND THE REQUIREMENTS OF THE STATE AND ANY LOCAL AGENCY HAVING
JURISDICTION. IN THE EVENT THAT THE CONTRACT DOCUMENTS AND THE
JURISDICTIONAL AGENCY REQUIREMENTS ARE NOT IN AGREEMENT, THE MOST
STRINGENT SHALL GOVERN.
4. THE CONTRACTOR SHALL GRADE THE SITE TO THE ELEVATIONS INDICATED AND SHALL
REGRADE WASHOUTS WHERE THEY OCCUR AFTER EVERY RAINFALL UNTIL A GRASS
STAND IS WELL ESTABLISHED OR ADEQUATE STABILIZATION OCCURS.
5. ALL OPEN AREAS WITHIN THE PROJECT SITE SHALL BE SODDED UNLESS INDICATED
OTHERWISE ON THE LANDSCAPE PLAN.
6. ALL AREAS INDICATED AS PAVEMENT SHALL BE CONSTRUCTED IN ACCORDANCE WITH
THE TYPICAL PAVEMENT SECTIONS AS INDICATED ON THE DRAWINGS.
7. WHERE EXISTING PAVEMENT IS INDICATED TO BE REMOVED AND REPLACED, THE
CONTRACTOR SHALL SAW CUT A MINIMUM 2" DEEP FOR A SMOOTH AND STRAIGHT JOINT
AND REPLACE THE PAVEMENT WITH THE SAME TYPE AND DEPTH OF MATERIAL AS
EXISTING OR AS INDICATED.
8. WHERE NEW PAVEMENT MEETS THE EXISTING PAVEMENT, THE CONTRACTOR SHALL
SAW CUT THE EXISTING PAVEMENT A MINIMUM 2" DEEP FOR A SMOOTH AND STRAIGHT
JOINT AND MATCH THE EXISTING PAVEMENT ELEVATION WITH THE PROPOSED
PAVEMENT UNLESS OTHERWISE INDICATED.
9. THE CONTRACTOR SHALL INSTALL FILTER FABRIC OVER ALL DRAINAGE STRUCTURES
FOR THE DURATION OF CONSTRUCTION AND UNTIL ACCEPTANCE OF THE PROJECT BY
THE OWNER. ALL DRAINAGE STRUCTURES SHALL BE CLEANED OF DEBRIS AS REQUIRED
DURING AND AT THE END OF CONSTRUCTION TO PROVIDE POSITIVE DRAINAGE FLOWS.
10. IF DEWATERING IS REQUIRED, THE CONTRACTOR SHALL OBTAIN ANY APPLICABLE
REQUIRED PERMITS. THE CONTRACTOR IS TO COORDINATE WITH THE OWNER AND THE
DESIGN ENGINEER PRIOR TO ANY EXCAVATION.
11. STRIP TOPSOIL AND ORGANIC MATTER FROM ALL AREAS OF THE SITE AS REQUIRED. IN
SOME CASES TOPSOIL MAY BE STOCKPILED ON SITE FOR PLACEMENT WITHIN
LANDSCAPED AREAS BUT ONLY AS DIRECTED BY THE OWNER.
12. FIELD DENSITY TESTS SHALL BE TAKEN AT INTERVALS IN ACCORDANCE WITH THE LOCAL
JURISDICTIONAL AGENCY OR TO FDOT STANDARDS. IN THE EVENT THAT THE CONTRACT
DOCUMENTS AND THE JURISDICTIONAL AGENCY REQUIREMENTS ARE NOT IN
AGREEMENT, THE MOST STRINGENT SHALL GOVERN.
13. ALL SLOPES AND AREAS DISTURBED BY CONSTRUCTION SHALL BE GRADED AS PER
PLANS. THE AREAS SHALL THEN BE SODDED OR SEEDED AS SPECIFIED IN THE PLANS,
FERTILIZED, MULCHED, WATERED AND MAINTAINED UNTIL HARDY GRASS GROWTH IS
ESTABLISHED IN ALL AREAS. ANY AREAS DISTURBED FOR ANY REASON PRIOR TO FINAL
ACCEPTANCE OF THE JOB SHALL BE CORRECTED BY THE CONTRACTOR AT NO
ADDITIONAL COST TO THE OWNER. ALL EARTHEN AREAS WILL BE SODDED OR SEEDED
AND MULCHED AS SHOWN ON THE LANDSCAPING PLAN.
14. ALL CUT OR FILL SLOPES SHALL BE 4 (HORIZONTAL) :1 (VERTICAL) OR FLATTER UNLESS
OTHERWISE SHOWN.
15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONTROL OF DUST AND DIRT
RISING AND SCATTERING IN THE AIR DURING CONSTRUCTION AND SHALL PROVIDE
WATER SPRINKLING OR OTHER SUITABLE METHODS OF CONTROL. THE CONTRACTOR
SHALL COMPLY WITH ALL GOVERNING REGULATIONS PERTAINING TO ENVIRONMENTAL
PROTECTION.
16. THE CONTRACTOR SHALL TAKE ALL REQUIRED MEASURES TO CONTROL TURBIDITY,
INCLUDING BUT NOT LIMITED TO THE INSTALLATION OF TURBIDITY BARRIERS AT ALL
LOCATIONS WHERE THE POSSIBILITY OF TRANSFERRING SUSPENDED SOLIDS INTO THE
RECEIVING WATER BODY EXISTS DUE TO THE PROPOSED WORK. TURBIDITY BARRIERS
MUST BE MAINTAINED IN EFFECTIVE CONDITION AT ALL LOCATIONS UNTIL
CONSTRUCTION IS COMPLETED AND DISTURBED SOIL AREAS ARE STABILIZED.
THEREAFTER, THE CONTRACTOR MUST REMOVE THE BARRIERS. AT NO TIME SHALL
THERE BE ANY OFF-SITE DISCHARGE WHICH VIOLATES THE WATER QUALITY STANDARDS
IN CHAPTER 17-302, FLORIDA ADMINISTRATIVE CODE.
17. SOD, WHERE CALLED FOR, MUST BE INSTALLED AND MAINTAINED ON EXPOSED SLOPES
WITHIN 48 HOURS OF COMPLETING FINAL GRADING, AND AT ANY OTHER TIME AS
NECESSARY, TO PREVENT EROSION, SEDIMENTATION OR TURBID DISCHARGES.
18. THE CONTRACTOR MUST REVIEW AND MAINTAIN A COPY OF THE ENVIRONMENTAL
RESOURCE PERMIT COMPLETE WITH ALL CONDITIONS, ATTACHMENTS, EXHIBITS, AND
PERMIT MODIFICATIONS IN GOOD CONDITION AT THE CONSTRUCTION SITE. THE
COMPLETE PERMIT MUST BE AVAILABLE FOR REVIEW UPON REQUEST BY WATER
MANAGEMENT DISTRICT REPRESENTATIVES.
19. THE CONTRACTOR SHALL ENSURE THAT ISLAND PLANTING AREAS AND OTHER PLANTING
AREAS ARE NOT COMPACTED AND DO NOT CONTAIN ROAD BASE MATERIALS. THE
CONTRACTOR SHALL ALSO EXCAVATE AND REMOVE ALL UNDESIRABLE MATERIAL FROM
ALL AREAS ON THE SITE TO BE PLANTED AND PROPERLY DISPOSED OF IN A LEGAL
MANNER.
20. THE CONTRACTOR SHALL INSTALL ALL UNDERGROUND STORM WATER PIPING PER
MANUFACTURER'S RECOMMENDATIONS.
21. PLEASE BE ADVISED THAT TV VIDEO INSPECTION IS REQUIRED FOR ALL STORMWATER
PIPES (PUBLIC OR PRIVATE) ASSOCIATED WITH THE PROPOSED DEVELOPMENT. IN
ADDITION, LASER PROFILE IS REQUIRED FOR ALL ADS/HDPE STORMWATER PIPES.
WATER AND SEWER UTILITY NOTES
1. THE CONTRACTOR SHALL CONSTRUCT GRAVITY SEWER LATERALS, MANHOLES GRAVITY
SEWER LINES AND DOMESTIC WATER AND FIRE PROTECTION SYSTEM AS SHOWN ON
THESE PLANS. THE CONTRACTOR SHALL FURNISH ALL NECESSARY MATERIALS,
EQUIPMENT, MACHINERY, TOOLS, MEANS OF TRANSPORTATION AND LABOR NECESSARY
TO COMPLETE THE WORK IN FULL AND COMPLETE ACCORDANCE WITH THE SHOWN,
DESCRIBED AND REASONABLY INTENDED REQUIREMENTS OF THE CONTRACT
DOCUMENTS AND JURISDICTIONAL AGENCY REQUIREMENTS. IN THE EVENT THAT THE
CONTRACT DOCUMENTS AND THE JURISDICTIONAL AGENCY REQUIREMENTS ARE NOT IN
AGREEMENT, THE MOST STRINGENT SHALL GOVERN.
2. ALL EXISTING UNDERGROUND UTILITY LOCATIONS SHOWN ARE APPROXIMATE. THE
CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS FOR UTILITY LOCATION AND
COORDINATION IN ACCORDANCE WITH THE NOTES CONTAINED IN THE GENERAL
CONSTRUCTION SECTION OF THIS SHEET.
3. THE CONTRACTOR SHALL RESTORE ALL DISTURBED VEGETATION IN KIND, UNLESS
SHOWN OTHERWISE.
4. DEFLECTION OF PIPE JOINTS AND CURVATURE OF PIPE SHALL NOT EXCEED THE
MANUFACTURER'S SPECIFICATIONS. SECURELY CLOSE ALL OPEN ENDS OF PIPE AND
FITTINGS WITH A WATERTIGHT PLUG WHEN WORK IS NOT IN PROGRESS. THE INTERIOR
OF ALL PIPES SHALL BE CLEAN AND JOINT SURFACES WIPED CLEAN AND DRY AFTER
THE PIPE HAS BEEN LOWERED INTO THE TRENCH. VALVES SHALL BE PLUMB AND
LOCATED ACCORDING TO THE PLANS.
5. ALL PHASES OF INSTALLATION, INCLUDING UNLOADING, TRENCHING, LAYING AND BACK
FILLING, SHALL BE DONE IN A FIRST CLASS WORKMANLIKE MANNER. ALL PIPE AND
FITTINGS SHALL BE CAREFULLY STORED FOLLOWING MANUFACTURER'S
RECOMMENDATIONS. CARE SHALL BE TAKEN TO AVOID DAMAGE TO THE COATING OR
LINING IN ANY D.I. PIPE FITTINGS. ANY PIPE OR FITTING WHICH IS DAMAGED OR WHICH
HAS FLAWS OR IMPERFECTIONS WHICH, IN THE OPINION OF THE ENGINEER OR OWNER,
RENDERS IT UNFIT FOR USE, SHALL NOT BE USED. ANY PIPE NOT SATISFACTORY FOR
USE SHALL BE CLEARLY MARKED AND IMMEDIATELY REMOVED FROM THE JOB SITE, AND
SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE.
6. WATER FOR FIRE FIGHTING SHALL BE AVAILABLE FOR USE PRIOR TO COMBUSTIBLES
BEING BROUGHT ON SITE.
7. ALL UTILITY AND STORM DRAIN TRENCHES LOCATED UNDER AREAS TO RECEIVE PAVING
SHALL BE COMPLETELY BACK FILLED IN ACCORDANCE WITH THE GOVERNING
JURISDICTIONAL AGENCY'S SPECIFICATIONS. IN THE EVENT THAT THE CONTRACT
DOCUMENTS AND THE JURISDICTIONAL AGENCY REQUIREMENTS ARE NOT IN
AGREEMENT, THE MOST STRINGENT SHALL GOVERN.
8. UNDERGROUND LINES SHALL BE SURVEYED BY A STATE OF FLORIDA PROFESSIONAL
LAND SURVEYOR PRIOR TO BACK FILLING.
9. CONTRACTOR SHALL PERFORM, AT HIS OWN EXPENSE, ANY AND ALL TESTS REQUIRED
BY THE SPECIFICATIONS AND/OR ANY AGENCY HAVING JURISDICTION. THESE TESTS MAY
INCLUDE, BUT MAY NOT BE LIMITED TO, INFILTRATION AND EXFILTRATION, TELEVISION
INSPECTION AND A MANDREL TEST ON GRAVITY SEWER. A COPY OF THE TEST RESULTS
SHALL BE PROVIDED TO THE UTILITY PROVIDER, OWNER AND JURISDICTIONAL AGENCY
AS REQUIRED.
EROSION CONTROL NOTES
1. THE STORM WATER POLLUTION PREVENTION PLAN ("SWPPP") IS COMPRISED OF THIS
EROSION CONTROL PLAN, THE STANDARD DETAILS, THE PLAN NARRATIVE,
ATTACHMENTS INCLUDED IN SPECIFICATIONS OF THE SWPPP, PLUS THE PERMIT AND
ALL SUBSEQUENT REPORTS AND RELATED DOCUMENTS.
2. ALL CONTRACTORS AND SUBCONTRACTORS INVOLVED WITH STORM WATER POLLUTION
PREVENTION SHALL OBTAIN A COPY OF THE STORM WATER POLLUTION PREVENTION
PLAN AND THE STATE OF FLORIDA NATIONAL POLLUTANT DISCHARGE ELIMINATION
SYSTEM GENERAL PERMIT (NPDES PERMIT) AND BECOME FAMILIAR WITH THEIR
CONTENTS.
3. THE CONTRACTOR SHALL IMPLEMENT BEST MANAGEMENT PRACTICES AS REQUIRED BY
THE SWPPP. ADDITIONAL BEST MANAGEMENT PRACTICES SHALL BE IMPLEMENTED AS
DICTATED BY CONDITIONS AT NO ADDITIONAL COST TO THE OWNER THROUGHOUT ALL
PHASES OF CONSTRUCTION.
4. BEST MANAGEMENT PRACTICES (BMP'S) AND CONTROLS SHALL CONFORM TO FEDERAL,
STATE, OR LOCAL REQUIREMENTS OR MANUAL OF PRACTICE, AS APPLICABLE. THE
CONTRACTOR SHALL IMPLEMENT ADDITIONAL CONTROLS AS DIRECTED BY THE
PERMITTING AGENCY OR OWNER.
5. EROSION CONTROL PLAN MUST CLEARLY DELINEATE ALL STATE WATERS. PERMITS FOR
ANY CONSTRUCTION ACTIVITY IMPACTING STATE WATERS OR REGULATED WETLANDS
MUST BE MAINTAINED ON SITE AT ALL TIMES.
6. THE CONTRACTOR SHALL MINIMIZE CLEARING TO THE MAXIMUM EXTENT PRACTICAL OR
AS REQUIRED BY THE GENERAL PERMIT.
7. CONTRACTOR SHALL DENOTE ON PLAN THE TEMPORARY PARKING AND STORAGE AREA
WHICH SHALL ALSO BE USED AS THE EQUIPMENT MAINTENANCE AND CLEANING AREA,
EMPLOYEE PARKING AREA, AND AREA FOR LOCATING PORTABLE FACILITIES, OFFICE
TRAILERS, AND TOILET FACILITIES.
8. ALL WASH WATER (CONCRETE TRUCKS, VEHICLE CLEANING, EQUIPMENT CLEANING,
ETC.) SHALL BE DETAINED AND PROPERLY TREATED OR DISPOSED.
9. SUFFICIENT OIL AND GREASE ABSORBING MATERIALS AND FLOTATION BOOMS SHALL BE
MAINTAINED ON SITE OR READILY AVAILABLE TO CONTAIN AND CLEAN-UP FUEL OR
CHEMICAL SPILLS AND LEAKS.
10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DUST CONTROL ON SITE. THE USE OF
MOTOR OILS AND OTHER PETROLEUM BASED OR TOXIC LIQUIDS FOR DUST
SUPPRESSION OPERATIONS IS PROHIBITED.
11. RUBBISH, TRASH, GARBAGE, LITTER, OR OTHER SUCH MATERIALS SHALL BE DEPOSITED
INTO SEALED CONTAINERS. MATERIALS SHALL BE PREVENTED FROM LEAVING THE
PREMISES THROUGH THE ACTION OF WIND OR STORM WATER DISCHARGE INTO
DRAINAGE DITCHES OR WATERS OF THE STATE.
12. ALL STORM WATER POLLUTION PREVENTION MEASURES PRESENTED ON THE PLAN,
SHALL BE INITIATED AS SOON AS PRACTICABLE.
DEMOLITION NOTES
1. ALL MATERIAL REMOVED FROM THIS SITE BY THE CONTRACTOR SHALL BE DISPOSED OF
BY THE CONTRACTOR IN A LEGAL MANNER.
2. REFER TO THE TOPOGRAPHIC SURVEY FOR ADDITIONAL DETAILS OF EXISTING
STRUCTURES, ETC., LOCATED WITHIN THE PROJECT SITE. UNLESS OTHERWISE NOTED,
ALL EXISTING BUILDINGS, STRUCTURES, SLABS, CONCRETE, ASPHALT, DEBRIS PILES,
SIGNS, AND ALL APPURTENANCES ARE TO BE REMOVED FROM THE SITE BY THE
CONTRACTOR AND PROPERLY DISPOSED OF IN A LEGAL MANNER AS PART OF THIS
CONTRACT. SOME ITEMS TO BE REMOVED MAY NOT BE DEPICTED ON THE
TOPOGRAPHIC SURVEY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VISIT THE SITE
AND DETERMINE THE FULL EXTENT OF ITEMS TO BE REMOVED. IF ANY ITEMS ARE IN
QUESTION, THE CONTRACTOR SHALL CONTACT THE OWNER PRIOR TO REMOVAL OF
SAID ITEMS.
3. THE CONTRACTOR SHALL REFER TO THE DEMOLITION PLAN FOR
DEMOLITION/PRESERVATION OF EXISTING TREES. ALL TREES NOT SPECIFICALLY
SHOWN TO BE PRESERVED OR RELOCATED SHALL BE REMOVED AS A PART OF THIS
CONTRACT. TREE PROTECTION FENCING SHALL BE INSTALLED PRIOR TO ANY
DEMOLITION.
EROSION CONTROL NOTES (CONT.)
13. STABILIZATION PRACTICES SHOULD BE INITIATED AS SOON AS PRACTICAL, BUT IN NO
CASE MORE THAN 7 DAYS WHERE CONSTRUCTION HAS TEMPORARILY CEASED.
14. DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITY HAS
PERMANENTLY STOPPED SHALL BE PERMANENTLY SEEDED. THESE AREAS SHALL BE
SEEDED NO LATER THAN 7 DAYS AFTER THE LAST CONSTRUCTION ACTIVITY OCCURRED
IN THESE AREAS. REFER TO SECTION 981 OF THE STANDARD SPECIFICATIONS FOR
SEEDING AND MAINTENANCE REQUIREMENTS.
15. IF THE ACTION OF VEHICLES TRAVELING OVER THE GRAVEL CONSTRUCTION
ENTRANCES IS NOT SUFFICIENT TO REMOVE THE MAJORITY OF DIRT OR MUD, THEN THE
TIRES MUST BE WASHED BEFORE THE VEHICLES ENTER A PUBLIC ROAD. IF WASHING IS
USED, PROVISIONS MUST BE MADE TO INTERCEPT THE WASH WATER AND TRAP THE
SEDIMENT BEFORE IT IS CARRIED OFF THE SITE.
16. ALL MATERIALS SPILLED, DROPPED, WASHED, OR TRACKED FROM VEHICLES ONTO
ROADWAYS OR INTO STORM DRAINS MUST BE REMOVED AS SOON AS POSSIBLE.
17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING SEDIMENT IN THE
DETENTION POND AND ANY SEDIMENT THAT MAY HAVE COLLECTED IN THE STORM
SEWER DRAINAGE SYSTEMS IN CONJUNCTION WITH THE STABILIZATION OF THE SITE.
18. ON-SITE & OFF SITE SOIL STOCKPILE AND BORROW AREAS SHALL BE PROTECTED FROM
EROSION AND SEDIMENTATION THROUGH IMPLEMENTATION OF BEST MANAGEMENT
PRACTICES. STOCKPILE AND BORROW AREA LOCATIONS SHALL BE NOTED ON THE
EROSION CONTROL PLAN AND PERMITTED IN ACCORDANCE WITH GENERAL PERMIT
REQUIREMENTS.
19. SLOPES SHALL BE LEFT IN A ROUGHENED CONDITION DURING THE GRADING PHASE TO
R…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .