- Replace Gazebo, Deck, and Area Way Stairs at the Leesburg Air Route Traffic Control Center, Leesburg, VA
- Solicitation number
- 697DCK-21-R-00147
About this file
This is a solicitation for replacing gazebos, decks, and area way stairs at the Leesburg Air Route Traffic Control Center in Leesburg, Virginia. The Federal Aviation Administration Eastern Acquisition Service Area, Boston Acquisition Office is seeking offers for the project, which is set aside for small businesses with a size standard of $39.5 million in average annual receipts. The required work includes demolishing existing structures and installing new gazebos, decks, and stairs. The price range for the requirement is $100,000 to $300,000. Payment and performance bonds are required. A site visit is scheduled for March 18, 2021 and interested contractors must submit an attendance list in advance. Offers are due by the date specified in the solicitation document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| amendment0003.pdf | ||
| 697DCK-21-R-00147amendment2.pdf | ||
| 697DCK-21-R-00147amendment1.pdf | ||
| RFO 697DCK-21-R-00147.pdf | ||
| Contractor Letter COVID 19.pdf | ||
| FAA-ZDC-1602638 Final specification.pdf | ||
| Wage Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader z d c -1
-e
.d g n
/2
:4
:1
A
M P lo tt e b y S
R V
C -C
E
G -E
D
O
B
F
H
8 7 6 5 4 3 2 1
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
REDLINE
APVD
SCALE: 1/2" = 1'-0"
5'1' 2'01'
SCALE: 3/8" = 1'-0"
4' 6'2'02'
SCALE: 1" = 1"
1" 2"01"
ARTCC
E501
GROUNDING PLAN SMOKING GAZEBO
SCALE: 3/8" = 1'-0"
E501 SCALE: 3/8" = 1'-0"
E501 SCALE: 1/2" = 1'-0"
GROUNDING PLAN ESU SHELTER
E501 SCALE: 1" = 1'-0"
GROUNDING ELEVATION 5
E501 SCALE: 1" = 1'-0"
GROUNDING ELEVATION
IS
U
VA
LW
GM 10/20/2018 1602638
ZDC-1602638-E501 A
ENGINEERING SERVICES
ENROUTE/FSS
GROUNDING
ELECTRICAL NEW WORK
REPLACE GAZEBOS AND STAIRS
WASHINGTON CENTER
PROJECT ARCHITECT MGR: ENROUTE/FSS ENGR CTR
-e
DRAWING PRODUCED ON AEA RO MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
LEESBURG
8 NUMBER
COLUMN
1 2
5 6
IE
L
IO
N
02/24/2020160263802/27/2020
FLAGPOLE
GARAGE
GROUNDING PLAN FLAGPOLE GAZEBO
GROUND ROD
ROD
GROUND
INSTALL 4/0 AWG BARE COPPER COUNTERPOISE.1
ESU SHELTER HAS 1 GROUNDING CONNECTION.
4/0 AWG BARE COPPER 10 FEET LONG.
ON 2 COLUMNS BY SHELTER MANUFACTURER.
EXOTHERMIC WELD TO COLUMN STEEL1
TO BUILDING EES OR TO GROUND ROD.
4/0 BARE COPPER EXOTHERMICALLY WELDED
CLAMP TO STAIRWAY.
BUTLER BUILDING STAIR. 1-BIMETALLIC 1
INSTALL 4/0 AWG BARE COPPER COUNTERPOISE.
AROUND ROD.
CONNECT TO BLDG COUNTERPOISE OR11
FIELD REVISION (G. MOON) LW
zdc-1602638-e501
2020-07-22T09:08:21-0400
ROBERT L BELTON
2020-07-21T09:17:11-0400
GREGORY D MOON
-g
:2
:0 lo tt e
DRAWING INDEX
DRAWING NO. REV. DATE DESCRIPTION
ZDC-1602638-G001 A
COVER AND INDEX SHEET
WASHINGTON CENTERLEESBURG
ZDC-1602638-G001
ZDC-1602638-G002
ZDC-1602638-G003
ZDC-1602638-C101
ZDC-1602638-C102
ZDC-1602638-C103
ZDC-1602638-C104
ZDC-1602638-C105
ZDC-1602638-C201
ZDC-1602638-C202
ZDC-1602638-C501
ZDC-1602638-C502
ZDC-1602638-C503
ZDC-1602638-E501
02/24/2020
10/20/2018
COVER AND INDEX SHEET
SITE AND CONTRACTOR'S STAGING PLAN
SITE UNDERGROUND UTILITY PLAN
SITE PLAN
DEMOLITION PLAN - SHEET 1 OF 2
DEMOLITION PLAN - SHEET 2 OF 2
NEW WORK PLAN - SHEET 1 OF 2
NEW WORK PLAN - SHEET 2 OF 2
NEW WORK - ELEVATIONS
NEW METAL STAIRS
NEW WORK - DETAILS
FLOOR PLANS AND SECTIONS - SHEET 2 OF 2
ELECTRICAL NEW WORK - GROUNDING
T OF TRANSPO
T A T
IC
OF
STATES
IT
TM
EN
AVIA
I
LAR
TRAT
SI
NI
ARTCC - LEESBURG, VIRGINIA
(NOT USED) FLOOR PLANS AND SECTIONS - SHEET 1 OF 2
zdc-1602638-g001
2020-07-22T09:07:19-0400
ROBERT L BELTON
2020-07-21T09:17:49-0400
GREGORY D MOON
CONTRACTOR'S EMPLOYEE PARKING MUST BE LIMITED TO VISITOR'S PARKING LOT.B.1
A.1
A.2
A.3
A.4
A.5
C.1
C.2
C.3
C.4
C.5
C.6
E.1
F.1
H.3
H.2
H.1
I.2
I.1
I.3
I.4
I.5
USE OF CAFETERIA IS NOT PERMITTED.K.1
UPON COMPLETION OF WORK, CONTRACTOR MUST REPAIR PAVED SURFACES TO ORIGINAL
CONDITION, AND RE-BUILD ROAD GUTTERS, CURBS AND SIDEWALKS TO MATCH THE
EXISTING.
L.1
L.2 DISTURBED LAWNS AND LANDSCAPING MUST BE RESTORED TO ORIGINAL CONDITION BY
CONTRACTOR TO THE SATISFACTION OF COR. THIS INCLUDES SPRINKLER PIPING AND
DRAINAGE/SEWER PIPING.
L.3
CONTRACT AND WATERED ON DAILY BASIS FOR 30 CONSECUTIVE DAYS.
M.1 OPERATIONAL QUESTIONS WILL BE ADDRESSED BY THE COR.
NOT USED
M.4
M.3
M.2
M.5 NO WELDING EQUIPMENT WILL BE POWERED BY THE FACILITY ELECTRICAL SYSTEM. WELDING
WILL NOT BE PERMITTED IN FAA OCCUPIED AREAS UNLESS APPROVED IN WRITING BY COR.
REVIEW WITH COR THE TYPE OF ARC WELDING USED AT FACILITY 10 DAYS PRIOR TO USE.
REFER TO THE CONTRACT DOCUMENTS.
CONTRACTOR WILL COMPLY. FOR A COMPLETE LIST OF SECURITY REQUIREMENTS,
THE FOLLOWING IS A PARTIAL LIST OF SECURITY REQUIREMENTS WITH WHICH THE
IN CONJUNCTION WITH ONGOING PROJECTS.
STAGING AREA MUST BE COORDINATED WITH SITE PERSONNEL VIA COR; PARTICULARLY
CONSTRUCTION ACCESS, PARKING, OFFICES AND EXTENT/SIZE OF CONSTRUCTION
MAIN ENTRANCE SECURITY GATE.
CONTRACTOR'S VEHICLES, PEDESTRIAN AND DELIVERIES TO SITE MUST BE THROUGH
FENCING TO PROTECT, WARN AND DIRECT PERSONS NEAR CONSTRUCTION AREAS.
DELIVERIES ON SITE. PROVIDE NECESSARY BARRICADES, LIGHTS, SIGNAGE AND
PROVIDE SIGNAGE TO INDICATE ACCESS ROUTE FOR CONSTRUCTION EMPLOYEES AND
CONTRACTOR DELIVERIES WITH THE COR.
FAA SHIFT CHANGES OCCUR AT 6:30 TO 8:00 AM AND 2:00 TO 4:00 PM. COORDINATE
AND AT TIMES OTHER THAN FAA EMPLOYEES SHIFT CHANGES TO AVOID CONGESTION.
DELIVERIES MUST BE SCHEDULED AND APPROVED 24 HOURS IN ADVANCE WITH COR
CONSTRUCTION STAGING AREA.
CONTRACTOR TO PROVIDE WASH STATIONS IN ADDITION TO PORTABLE TOILETS FOR
THE COR FOR SCHEDULING OF SERVICE.
CONTRACTOR AS REQUIRED IN THE CONSTRUCTION STAGING AREA. COORDINATE WITH
PORTABLE CHEMICAL TOILETS MUST BE PROVIDED, PAID FOR AND MAINTAINED BY THE
WILL NOT BE PERMITTED.
THIS FACILITY. WORK WILL BE COORDINATED WITH COR. DISRUPTION OF THIS FACILITY
CONTRACTOR MUST USE GREAT CARE AND CAUTION WHILE WORKING IN ALL AREAS OF
CONSTRUCTION AREAS.
SITE IS A SECURE AREA AND CONSTRUCTION PERSONNEL MUST REMAIN IN
WILL ISSUE PARKING PERMITS FOR CONTRACTOR WORK VEHICLE.
RESPONSIBLE FOR THE CONDUCT OF THEIR PERSONNEL WHILE ON SITE. THE FAA
CONSTRUCTION PERSONNEL. CONTRACTOR'S SUPERVISORY PERSONNEL WILL BE
PROPER IDENTIFICATION. TEMPORARY SECURITY BADGES WILL BE ISSUED TO
PROVIDED TO COR. FAA RESERVES THE RIGHT NOT TO ACCEPT WORKERS WITHOUT
AN ADVANCE LIST AND WEEKLY LOG OF CONTRACTOR'S PERSONNEL MUST BE
11:00 PM TO 6:00 AM OR AS APPROVED BY COR.
WORK ON OR NEAR CRITICAL EQUIPMENT WILL BE ACCOMPLISHED DURING OFF-HOURS OF
BY THE WORK AND PROCEDURES TO PROTECT THIS AND OTHER FAA/GOVERNMENT EQUIPMENT.
FACILITY COORDINATE WITH COR LOCATION OF CRITICAL EQUIPMENT THAT MAY BE AFFECTED
FAA HAS AND MAINTAINS EQUIPMENT THAT IS CRITICAL TO ITS OPERATION THROUGHOUT THIS
PERFORMANCE OF THE WORK.
HAVE APPROVED BY COR IN WRITING, A MINIMUM OF 10 WORKING DAYS BEFORE THE
ALLOWED ONLY AT PREARRANGED TIMES APPROVED BY COR. SCHEDULE, COORDINATE AND
CONCRETE SAWING, CORE DRILLING, CONCRETE DEMOLITION AND ANCHOR DRILLING WILL BE
BY COR.
GENERAL CONTRACTOR MUST ATTEND COORDINATION AND SAFETY MEETINGS AS REQUIRED
WATER, ASBESTOS, DEBRIS AND DUST, INCLUDING CORE DRILLING.
BUILDING FROM DAMAGE, INCLUDING BUT NOT LIMITED TO, DAMAGE CAUSED BY IMPACT,
CONTRACTOR MUST PROTECT NEW AND EXISTING FAA EQUIPMENT, BOTH INSIDE AND OUTSIDE
AREA FROM THE BUILDING EXTERIOR.
THE WORK AREA. THE CONTRACTOR WILL PROVIDE MEANS TO ACCESS THE WORK
THE CONTRACTOR MUST NOT BE ALLOWED TO USE THE BUILDING INTERIOR TO ACCESS
CONSTRUCTION STAGING NOTES
C. FAA SECURITY REQUIREMENTS
A. CONSTRUCTION ACCESS
B. CONTRACTOR PARKING
E. CONSTRUCTION MATERIAL STORAGE
F. CONSTRUCTION DEBRIS
G. CONSTRUCTION OFFICE - NOT USED
H. CONSTRUCTION TOILET FACILITIES
M. EQUIPMENT PROTECTION
L. PARKING LOT, SOD AND DRIVEWAY REPAIR
K. CAFETERIA USE
I. DEMOLITION AND CONSTRUCTION HOURS
STAGING AREA
CONSTRUCTION
1 SITE AND CONTRACTOR'S STAGING PLAN
G002
SCALE: 1" = 60'
60' 60'0 120'
BUILDING
STORAGE
UNIT (ESU)
SERVICES
ENVIRONMENT
(ES)
ENGINEER
CONTRACTOR'S ACCESS TO BUILDING MUST BE IN LIMITED TO THE WORK AREAS ONLY.
SUBCONTRACTORS AND DELIVERIES.
WITHIN THE BUILDING IN ADVANCE WITH COR. CONTRACTOR MUST ESCORT
PERSONNEL WORKING WITHIN THE BUILDING AND WITHIN FENCE. COORDINATE WORK
FAA ESCORTS AND DESIGNATED ESCORTS ARE REQUIRED FOR CONSTRUCTION
OF DAMAGE OR DISRUPTION OF ELECTRICAL SERVICES.
DISRUPTION OF POWER TO EQUIPMENT. CONTRACTOR MUST NOTIFY COR IMMEDIATELY
RESULT OF ACCIDENTAL EVENTS OR NEGLIGENCE SUCH AS, BUT NOT LIMITED TO,
PROTECTION OF THIS EQUIPMENT FROM PHYSICAL OR ELECTRICAL DAMAGE AS A
DURATION OF THIS CONTRACT. CONTRACTOR IS RESPONSIBLE FOR CONTINUOUS
EXISTING FAA AIR TRAFFIC EQUIPMENT MUST REMAIN OPERATIONAL THROUGHOUT
WORK AREA MUST BE APPROVED BY THE COR.
FROM THE WORKING AREA BY CONTRACTOR DAILY ANY DUMPSTERS REQUIRED NEAR THE
AND FREE OF EXCESS DEBRIS AND DUST DURING CONSTRUCTION. DEBRIS MUST BE REMOVED
CONSTRUCTION STAGING AREA. AREAS AROUND DUMPSTERS MUST BE KEPT CLEAN
THE CONTRACTOR MUST PROVIDE FOR DUMPSTERS FOR CONSTRUCTION DEBRIS AT THE
MUST SECURE CONSTRUCTION STAGING AREA AND PROVIDE MEANS OF ACCESS TO THE COR.
(UNDERGROUND UTILITIES) MAY RUN THROUGH STAGING AREA AND ELSEWHERE. CONTRACTOR
CONTRACTOR MUST NOT DIG WITHOUT PRIOR PERMISSION FROM COR. BURIED CABLES
BARRICADES AND CLEARLY MARKED. MATERIALS WILL BE NEATLY STORED AND PROTECTED.
CONSTRUCTION STAGING AREA. THE CONSTRUCTION STAGING AREA MUST BE SURROUNDED BY
STORAGE OF CONSTRUCTION MATERIALS AND TRAILERS ON SITE IS LIMITED TO THE
CONTRACTOR IS NOT ALLOWED TO USE TOILETS INSIDE MAIN FACILITY BUILDING.
WORKING DAYS NOTICE IN ADVANCE OF PERFORMANCE OF THE WORK.
BE SCHEDULED, COORDINATED AND APPROVED IN WRITING BY COR WITH A MINIMUM OF 10
NOISY DEMOLITION (INSIDE OR OUTSIDE) AND OFF-HOURS CONSTRUCTION ACTIVITIES MUST
NEW SOD MUST INSTALLED WHERE DISTURBED BY THE CONTRACTOR UNDER THIS
THE ARTCC.
COORDINATE CONSTRUCTION ACTIVITY SO AS NOT TO INTERFERE WITH FUNCTIONS OF
ARTCC IS A 24 HOUR 7 DAY PER WEEK OPERATING FACILITY. IT IS BE NECESSARY TO
ZDC-1602638-G002 A
SITE AND CONTRACTOR'S STAGING PLAN
D. EXCAVATION LIMITATIONS
WILL BE DEMOLITION/CONSTRUCTION NOISE AND INTERFERENCE WITH FAA SHIFT CHANGE.
COORDINATED WITH THE COR PRIOR TO START OF CONSTRUCTION. OTHER CONSIDERATIONS
REQUIREMENTS ACTUAL TIMES MAY VARY. NORMAL WORK DAY SCHEDULE MUST BE
WORK CAN BE PLANNED FOR NORMAL BUSINESS HOURS. DUE TO COR MONITORING
02/24/20201602638FIELD REVISION (G. MOON) LW02/27/2020
BASE OR FILL IS ALLOWED.
SPOIL, REMOVING BROKEN UP CONCRETE OR PAVEMENTS AND FOR PLACING NEW
VACUUM OR COMPRESSED AIR WITH VACUUM. USE OF EQUIPMENT FOR HANDLING
GRADE MUST BE DONE BY HAND OR BY VACUUM TECHNIQUES SUCH AS HYDRO
NO EXCAVATION BY DIGGING EQUIPMENT IS ALLOWED. ALL WORK BELOW
T E
W
K
CONCRETE SIDEWALK
T E
X X X X X X X X X
X
ROAD "C"
ROAD "F"
LP
CONCRE
TE
DE
WAL
e d a r
RIGHT OF WAY LINE
s i
MH
CB
CBCB
MHMH
X X X X X X
E
VIRGINIA STATE ROUTE 7
X X X X
AAS BUILDING
X X X X X X X X X X X X
CONTROL
WING
TELCOM
EXPANSION
IOSF
CONCRETE
PAD
ANTENNA
RCL
ISLAND
GRASS
MAIN
GUARD HOUSE
PP
HW
ABANDONED PUMP
STATION
FH
EMH
AUTOMATION
POWER SERVICE
UPS/GENERATOR BUILDING
EL 321.6
STOOP
LOT "D"
X X X X X
OIL TANKS
X X X XXX
X X
HEADWALL
CB MH
CO EMH
3 BAY GARRAGE
X X X X X X X X X X X X X
ROAD "B"
ADMINISTRATION
WATER
TREATMENT
Y
SMOKING
SHELTER
x x x xxx
TOWERS
COOLING
LP LP
C0
EXISTING SIDEWALK
MAINTENANCE BUILDING
LOT "E"
LOT "C" LOT "B"
:1 lo tt e zdc-1602638-g002
2020-07-22T09:07:56-0400
ROBERT L BELTON
2020-07-21T09:18:27-0400
GREGORY D MOON
:2 lo tt e
T E
T E
X X X X X X X X X
CONCRE
TE
DE
WAL
e d a r
RIGHT OF WAY LINE
s i
CBCB
MHMH
E
VIRGINIA STATE ROUTE 7
X X X X X X X X X X X X
TELCOM
HW
ABANDONED PUMP
STATION
POWER SERVICE
EL 321.6
STOOP
LOT "D"
OIL TANKS
HEADWALL
CB MH
CO EMH
3 BAY GARRAGE
LOT "B" LOT "A SOUTH"
SMOKING
xxx
COOLING
C0
MAINTENANCE BUILDING
FFFF
FF
F F
W W W
P P
(ES)
UNIT (ESU)
G G G
G003 050' 50' 100'
SCALE: 1" = 50'
OVERHEAD POWER & TELEPHONE LINES
6" W
ATE
RLINE
APPROXIMATE LOCATION
RECORDS.
AS SHOWN ON EXISTING
SANITARY LINE TO BUILDING
NOTE: WATERLINE FOLLOWS
VEPCO X003
GUY ANCHORS
GUY WIRES
GUY ANCHORS
15" R
CP SD
LP LP LP
LP LP LP
" R
" R
15" RCP SD
8" S
DS DS DS DS
DSDS DSDS
DS DS
DSDS
CONDUIT
ELECTRICAL
ELECTRICAL BOX
CONDUIT
ELECTRICAL
21" RCP
TOP ELE 302.22
STORM INLET "C"
8" SAN SEW XHCI
" S
EDGE OF PAVEMENT
END OF CURB
D.S
TOP ELEV 316.44
ELECTRICAL MH 2
D.S
TOP ELE 310.59
STORM INLET "V"
W W W
" S
TOP ELE 321.43'
MANHOLE "G"
TELEPHONE
FIRE HYDRANT
15" RCP SD
OUTLET
CONCRETE GROUND
FIRE HYDRANT
21" RCP SD
CONCRETE PAD
VALVE
SPRINKLER
R C
4" SAN SEW XHCI
ELECTRICAL SERVICE
UNDERGROUND
LINE
FUEL OIL
INV ELE 311.07'
6' IN FROM BUILDING
IN ELE 306.76'
8' IN FROM BUILDING
TOP ELE 322.68'
STORM MANHOLE "E"
INV ELE 300.75'
INV IN FROM MH "K"
TOP ELE 304.40
STORM MANHOLE "L"
BONDING SYSTEM
SITE GROUNDING AND
BONDING SYSTEM
SITE GROUNDING AND
ALWAYS VERIFY UTILITY LOCATIONS.
COLLECTED FROM OTHER DRAWINGS
THIS SHEET IS BASED ON INFORMATION
HEL374E
VEPCO POLE
DUCT BANKS.
ABANDONED TRANSFORMER PADS AND 1
INV OUT = 308.00'
RIM = 313.20'
STORM INLET
INV OUT = 308.00'
RIM = 313.20'
STORM INLET
MANHOLE "E"
STORM
PIPEVISION
MANHOLE "D"
SANITARY
ELE 316.35
TOP
MANHOLE "Q"
MANHOLE "P"
"K-1"
MANHOLE "A"
333.18
328.15
311.75
MANHOLE "I"
MANHOLE "H"
MANHOLE "L"
MANHOLE "K"
ELEV 308.38'
TOP
INLET "X"
"W"
MANHOLE "F"
MANHOLE "E"
MANHOLE "B"
NOTE
SHEET NOTE
ZDC-1602638-G003 A
02/24/20201602638FIELD REVISION (G. MOON) LW02/27/2020A
-B
IL
TOP ELE 312.43'
SANITARY MANHOLE "J"
POWER LINE
OVER LINE
zdc-1602638-g003
2020-07-22T09:09:19-0400
ROBERT L BELTON
2020-07-21T09:18:53-0400
GREGORY D MOON
X X X X X X X X X X X X X X X X X
XX
X XX
X X X
X X X
COOLING x xx
E
GARAGEBUILDING
GENERATOR/
-c
:3 lo tt e
C101 050' 50' 100'
C102
C103
NOTES:
ZDC-1602638-C101 A
SITE PLAN
LEGEND:
WORK LOCATIONS
SITE PLAN WITH WORK LOCATIONS
3 4
5 6
NEW ESU SHELTER LOCATION
METAL BUILDING BACK STAIRS
METAL BUILDING BACK STAIRS
ESU GAZEBO
WOODEN STAIRS
POWER SERVICE BUILDING
FLAGPOLE GAZEBO
SMOKERS GAZEBO
zdc-1602638-c101
2020-07-22T07:44:56-0400
ROBERT L BELTON
2020-07-21T09:08:21-0400
GREGORY D MOON
lo tt e
ASCALE: 1" = 10'
10' 20'010'
SHEET LEGEND:
RAMP
CONTROL WING
PAVERS
PLANTINGS
SIDEWALK
ROAD "A"
SCALE: 1" = 10'-0"
SCALE: 1" = 5'-0"
ZDC-1602638-C102 A
SHEET 1 OF 2
DEMOLITION PLAN
LANDING
PLANTING
EXISTING
ELEVATED SIDEWALK
PSB
SCALE: 1" = 5'
5' 10'05'
SMOKERS GAZEBO DEMOLITION
FLAGPOLE GAZEBO DEMOLITION
ID
HANDICAP ACCESS RAMP
STOP CONCRETE REMOVAL AT LAST JOINT BEFORE METAL RAMP.
FROM 12" TO 4" THICK.
RAMP IS APPROXIMATE 14' LONG AND TAPERS
GAZEBO CONCRETE IS APPROXIMATE 12' x 12 x 6".
GRADE
BELOW
FUEL LINE
WOODEN STAIR REMOVAL
POWER SERVICE BUILDING (PSB)
ROAD 'A'
5'-0"
THE DEMOLITION AREA SHOWN INCLUDES WORK ON PLANTING BEDS.
REMOVE AND STORE PAVERS TO ALLOW FOR EXPANSION FOR LARGER FLOOR.
AND MAINTAIN FOR REPLANTING.
REMOVE AZALEA PLANTS FOR NEW WORK. TEMPORARILY TRANSPLANT PROTECT
REMOVE 15' WOOD GAZEBO WITH SCREW ANCHORS.
PLANTS
DEMOLITION HATCHING
4 3
STAIR
WOODEN
WOODEN LANDING
2 ALL WOODEN SUPPORT POSTS ARE TO BE REMOVED.
REMOVE OR CUT CONCRETE ANCHORS FLUSH FOR WOODEN STAIRWAY AND RAILING.
zdc-1602638-c102
2020-07-22T07:49:16-0400
ROBERT L BELTON
2020-07-21T09:08:45-0400
GREGORY D MOON
lo tt e
SCALE: 1" = 10'
SHEET LEGEND:
DEMOLITION HATCHING
METAL STAIRS
LIGHT DUTY
SERVICES (ES)
SERVICES UNIT (ESU)
SCALE: 1" = 50'-0"
50' 100'050'
ZDC-1602638-C103 A
02/24/2020160263802/27/2020A
SHEET 2 OF 2
DEMOLITION PLAN
STORAGE BUILDING STAIR REMOVAL
ESU
GENERATOR
DETAIL 4 - ESU GAZEBO DEMOLITION PLAN
8'-0"
IN
IM
ASPHALT
DETAIL 5 - NEW ESU SHELTER LOCATION
1 12' WOOD GAZEBO ON TOP OF PAVEMENT.
IS APPROXIMATELY 4" THICK.
CUT PAVEMENT NEATLY FOR FOUNDATION AND FLOOR PAVEMENT
CONFIRM LOCATION WITH COR.
EXISTING STAIRS RESTING ON GROUND.
SECURE STAIRS TO BUILDING.
REMOVE OR CUT CONCRETE ANCHORS THAT
REMOVE EXISTING METAL STAIR.
zdc-1602638-c103
2020-07-22T08:31:55-0400
ROBERT L BELTON
2020-07-21T09:09:40-0400
GREGORY D MOON
lo tt e
PAVERS
PLANTINGS
C201
C104 SCALE: 1" = 10'-0"
C104
20 FOOT FLAG POLE GAZEBO PLAN
ZDC-1602638-C104 A
SHEET 1 OF 2
NEW WORK PLAN
16 FOOT SMOKERS GAZEBO
17'-0"
C201
ID
3 4
SIDEWALK.
INSTALL EXPANSION JOINT BETWEEN NEW CONCRETE AND
PLANTING BED.
ADD LANDSCAPING EDGING BETWEEN NEW SOD AND
FROM BOTH THE SIDEWALKS.
ENSURE THE GAZEBO ROOF OVERHANG IS A MINIMUM OF 6 INCHES
TALL FESCUE SOD.
FILL IN ANY OPEN SOIL OR DAMAGED GRASS WITH NEW
NEW CONCRETE FLOOR MUST MATCH GRADE OF EXISTING SIDEWALKS.
METAL HANDICAP ACCESS RAMP
TO FLAGPOLE AT IT'S EXISTING SLOPE.
FINISHED FLOOR MUST BE SET AT LEVEL TO MEET PAVER PATH
ON BOTH SIDES OF THE GAZEBO.
TRANSITION FROM THE WALKWAY TO THE GAZEBO FLOOR
RESET WALKWAY PAVERS AS NEEDED TO CREATE A SMOOTH
SAVED PLANTS OR PLANT NEW.
THEY WILL BE A MINIMUM OF 4' FROM EDGE OF FLOOR. REPLANT
REESTABLISH PLANTING BEDS ON EACH SIDE OF THE GAZEBO,
AREA UNDER SHELTER WILL BE CONCRETE SURFACE.
zdc-1602638-c104
2020-07-22T08:48:10-0400
ROBERT L BELTON
2020-07-21T09:10:08-0400
GREGORY D MOON
:5 lo tt e
C202
C105 SCALE: 1/2" = 1'-0"
C105
EXISTING STAIRS
STAIRS
NEW METAL
SERVICES (ES)
SERVICES UNIT (ESU)
ZDC-1602638-C105 A
NEW WORK PLAN
STAIRS MOUNTED ON FOUNDATIONS.
NEW METAL STAIRS AT STORAGE BUILDINGS
7'-0"
7'-0"
5'-0"
WALL
RETAINING
STAIRS
METAL
NEW
NEW METAL
RAILING
DN
EXISTING RAILING
SCALE: 1" = 5'-0"
C105
GENERATOR
SCALE: 1" = 5'
5' 10'05'
ESU SHELTER
8'-0"
NEW METAL STAIRS AT POWER SERVICE BUILDING
ASPHALT
AT LANDING
EXISTING STEP UP
ROOF OF THE SHELTER.
THE FLOOR WILL MATCH THE OUTSIDE DIMENSIONS OF THE
PERIMETER OF THE NEW FLOOR.
PROVIDE EXPANSION JOINT WITH SEALANT AROUND THE
AT 1/8" PER FOOT.
1/2 INCH ABOVE SURROUNDING PAVEMENT. SLOPE FLOOR
FLOOR WILL BE AT EXISTING GRADE AND NO MORE THAN A
SLOPE
FLOOR
C501 zdc-1602638-c105
2020-07-22T08:48:54-0400
ROBERT L BELTON
2020-07-21T09:10:37-0400
GREGORY D MOON
lo tt e
C201 SCALE: 1/2" = 1'-0"
C201 SCALE: 3/4" = 1'-0"
OVERHANG
SCALE: 3/4" = 1'-0"
3'2'1'01'
SIDE ELEVATION (TYPICAL)
ESU SHELTER
ZDC-1602638-C201 A
ELEVATIONS
NEW WORK
BASE
4" AGGREGATE
4" CONCRETE
C201 SCALE: 3/4" = 1'-0"
BASE
4" AGGREGATE
/8
IG
COMPACTED BASE
JOINT
FLAGPOLE GAZEBO
SMOKERS 16' GAZEBO ELEVATION
1'-6"
2'-0"
1'-4"
1'-6"
/8
IG
NEW EXPANSION
1 C501
FLAGPOLE GAZEBO 20' OCTAGONAL1
SMOKERS GAZEBO 16' OCTAGONAL1
zdc-1602638-c201
2020-07-22T08:50:08-0400
ROBERT L BELTON
2020-07-21T09:11:01-0400
GREGORY D MOON
lo tt e c
GM 02/24/2020 1602638
EASTERN SERVICE AREA
ZDC-1602638-C202
C202 SCALE: 1" = 1'-0"
4" MAX
1' 2'01'
SCALE: 1" = 1'-0"
PLATFORM
STAIR
NEW METAL STAIRS
13'-0" 6'-0"
4'-0"
INFILL DETAIL FOR PSB METAL STAIRPOWER SERVICE BUILDING METAL STAIRS
10"
(TYP)
STAIR FOUNDATION - ELEVATION DETAIL3
C202 (TYPICAL)
SPACING AND LOCATION TO MATCH STAIRS
VARIES3'-0"
C202 SCALE: 1/2" = 1'-0" (TYPICAL)
STAIR FOUNDATION - PLAN VIEW
PLATFORM AT THRESHOLD ELEVATION.
STAIRS BOLTED TO EXPANSION ANCHORS.
zdc-1602638-c202
2020-07-22T08:50:47-0400
ROBERT L BELTON
2020-07-21T09:11:46-0400
GREGORY D MOON
lo tt e
SECTION
PLAN
BASE PLATE DETAIL
1/2" BASE PLATE
SCALE: 3/4" = 1'-0"
3'2'1'01'
1' 2'01'
ANCHOR BOLT
TEMPLATE ASSEMBLY
FINAL GRADE
AGGREGATE BASE
4" GRADED
3000 PSI
4" THICK
SUB BASE
COMPACTED
(TYP X4 PCS)
A563 HEX NUT
(2) 1/2" - 13
GR36 ANCHOR
1/2" ASTM F1554
TOP OF FOOTING
800 PSI (NIC)
NON - METALLIC GROUT
HIGH STRENGTH NON-SHRINK
F436 (TYP X4 PCS)
(2) WASHER 1/2" FLAT
TEMPLATE
HEX NUT
1/2" -13 A563
ANCHOR
F1554 GR36
1/2" ASTM
2'-0"
1'-4"
DESIGN, FOR PREENGINEERED STRUCTURE.
TYPICAL FOUNDATIONS CONTRACTOR WILL PROVIDE FOUNDATION
NOTE:
C501 SCALE: 3/4" = 1'-0"
C501 SCALE: 3/4" = 1'-0"
CONCRETE FLOOR DETAIL
IN
SHELTER COLUMN FOUNDATION (TYPICAL) SHELTER COLUMN FOUNDATION CONNECTION (TYPICAL)
NOTE:
FINAL ANCHORAGE DESIGN WILL BE PROVIDED BY MANUFACTURER.
DETAILS
ZDC-1602638-C501 A
NEW WORK
6" x 6" - W1.4 x W1.4 WWF 3/4"
C501 SCALE: 1" = 1'-0"
ASPHALT PAVEMENT
EXPANSION JOINT AT
PAVEMENT
1/4" RADIUS
JOINT SEALER
JOINT FILLER
/4 zdc-1602638-c501
2020-07-22T08:51:25-0400
ROBERT L BELTON
2020-07-21T09:13:40-0400
GREGORY D MOON
lo tt e
SLOPE TO CURB
SLOPE
C503
SMOKERS GAZEBOS - FLOOR PLAN
NOT TO SCALE
FLAGPOLE GAZEBO - FLOOR PLAN
C503 NOT TO SCALE
7 8
WALKWAY
PAVER
ZDC-1602638-C503 A
FLOOR PLANS AND SECTIONS
17'-0"
EXISTING SLOPE
MAINTAIN
FINAL FLOOR ELEVATION
SEE DETAIL 2 FOR
CURB
3 INTEGRATED SEATING S-70.
NEW FLOOR MEET.
CREATE EXPANSION JOINT WHERE SIDEWALK AND
MATCH FLOOR TO SIDEWALKS.
2'-0" TYP
4'-0"
(T
INTEGRATED SEATING S-70.
NEW FLOOR ELEVATION WILL MEET THE EXISTING SLOPE OF THE PAVER PATH.
SLOPE FLOOR AWAY FROM WALKWAYS 1/8" PER FOOT.
zdc-1602638-c503
2020-07-22T09:08:49-0400
ROBERT L BELTON
2020-07-21T09:16:47-0400
GREGORY D MOON
File details come from the government source that posted it. Updated .