YZEU172007 Repair Bldg. 1050 Bathrooms Specfications.pdf
PDF 1 MB Posted
- Attached to
- Renovate 1050 Bathrooms Federal contract opportunity
- Solicitation number
- W50S8T-20-B-0003
- Issued by
- Department of the Army National Guard
About this file
This solicitation requests proposals for renovations to bathrooms at Building 1050. Renovations include replacing all plumbing fixtures, electrical fixtures, ceiling tiles, HVAC components, and floor and wall finishes in the men's and women's bathrooms. Additional plumbing fixtures and HVAC components will be added to the men's bathroom, and its layout will change. New lockers will be installed in the men's bathroom with an option to upgrade those in the women's bathroom. Optional work includes replacing the energy recovery ventilator on the roof serving the bathrooms and adding an Americans with Disabilities Act-compliant drinking fountain. The soliciting agency is the Department of the Army National Guard. Proposals are due by the date specified in the solicitation. The contract will be awarded to the responsible offeror whose proposal follows the solicitation instructions and is most advantageous to the Government.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sealed Bid 1419 1050 Bathrooms Page 2 of 2 dt.pdf | ||
| Sealed Bid 1419 1050 Bathrooms Page 1 of 2 dt.pdf | ||
| 1050 Bathrooms Site Visit Attendance Roster.pdf | ||
| SOW 1050 Bathrooms.pdf | ||
| Pre-Bid RFI 1050 bathrooms.pdf | ||
| Pre-Bid RFI 1050 bathrooms 29Jul2020.pdf | ||
| BLDG 1050 RESTROOM RERMODEL.pdf | ||
| Compliance Checklist Sealed Bids.pdf | ||
| W50S8T20B0003.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
YZEU172007 Repair Bldg. 1050 Bathrooms Specifications
INDEX
SECTION 02050 – DEMOLITION 02050 – 1-3
SECTION 02070 – SELECTIVE DEMOLITION 02070 – 1-6
SECTION 02236 - BASE COURSE 02236 – 1-3
SECTION 02520 – PORTLAND CEMEMT CONCRETE PAVING 02520 – 1-11
SECTION 02662 - WATER SERVICE CONNECTIONS 02662 – 1-5
SECTION 02700 - GRAVITY PIPING FOR STORM DRAIN AND 02700 – 1-4
SANITARY SEWER SERVICE CONNECTIONS
SECTION 03300 – CAST-IN-PLACE CONCRETE 03300 – 1-19
SECTION 06410 - CABINETWORK - PLASTIC LAMINATE 06410 – 1-7
SECTION 07270 – FIRESTOPPING 07270 – 1-8
SECTION 07901 – JOINT SEALANTS 07901 – 1-8
SECTION 09255 – GYPSUM BOARD ASSEMBLIES 09255 – 1-12
SECTION 09260 – METAL STUDS AND GYPSUM BOARD ASSEMBLIES 09260 – 1-8
09300 – 1-9
09511 – 1-7
09900 – 1-12
10155 – 1-5
10800 – 1-4
15420 - 1-11
15440 - 1-5
15891 - 1-10
15910 - 1-12
15932 - 1-4
16050 1-19
16140 - 1-4
SECTION 09300 – TILE
SECTION 09511 – ACOUSTICAL PANEL CEILINGS
SECTION 09900 – PAINTING
SECTION 10155 – TOILET COMPARTMENTS
SECTION 10620 - OPERABLE PARTITIONS
SECTION 10800 – TOILET AND BATH ACCESSORIES
SECTION 15420 - DRAINAGE AND VENT SYSTEMS
SECTION 15440 - PLUMBING FIXTURES
SECTION 15891 - METAL DUCTWORK
SECTION 15910 - DUCTWORK ACCESSORIES
SECTION 15932 - AIR OUTLETS AND INLETS
SECTION 16050 - BASIC METHODS AND REQUIREMENTS
(ELECTRICAL)
SECTION 16140 - WIRING DEVICES
SECTION 16510 - BUILDING LIGHTING 16510 - 1-11
10620 – 1-5
DEMOLITION 02050 - 1
SECTION 02050 - DEMOLITION
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Utility lines, and other items to be demolished and/or abandoned are as shown.
1.2 SUBMITTALS
A. Quality Control Submittals:
1. Schedule of demolition, as part of and consistent with the progress schedule specified in Section 01310, PROGRESS/CRITICAL PATH SCHEDULES.
2. Copies of any authorizations and permits required to perform Work.
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION
3.1 PREPARATION
A. Utilities:
1. Notify CONTRACTING OFFICER or appropriate utilities to turn off affected services before starting demolition or alterations.
2. Remove utility lines exposed by demolition excavation.
3. Remove electric, sanitary, water, and storm drainage adjacent to buildings to be demolished.
4. Excavate utility lines serving buildings to be demolished and provide a permanent leak-proof closure for water and gas lines.
3.2 DEMOLITION
A. Drawings define minimum required demolition. Unless otherwise shown, rough cuts or breaks may be made exceeding limits of demolition shown.
B. Core drill floor slabs, catch basins, and other concrete improvements to remain in place below ground, or break holes at structure's lowest point to allow water to freely migrate through.
DEMOLITION 02050 - 2
C. Remove piping as shown and from any other areas that interfere with
CONTRACTOR’s work. Pipe, valves, and fittings adjacent to those to be removed may also be removed as salvage.
D. Cut off concealed or embedded conduit, boxes, or other materials a minimum of 6 inches below final finished surface.
E. Perform site cleanup daily before leaving the work site. Store equipment in a neat and orderly arrangement.
F. Abandonment of Buried Utility Piping Systems:
1. Plug pipelines at exposed excavations and at manholes or other utility structures with minimum 5-foot long concrete plug.
2. Manholes/wet wells/drainage structures:
a. Remove frames and covers/grates for salvage.
b. Remove structures shown on Drawings.
c. Backfill as described herein.
G. Demolition of utility poles, street signs and similar items:
1. Remove entire structure, including portions below ground.
2. Remove and separate items for salvage.
3. Backfill as described herein.
3.3 DISPOSAL
A. Dispose of debris and other nonsalvaged materials off base at location selected by
CONTRACTOR.
3.4 BACKFILLING
A. Demolished Areas: Backfill to existing ground level or foundation level of new construction.
B. Backfill Material and Compaction:
DEMOLITION 02050 - 3
1. Conform to Section 02220, FILL AND BACKFILL.
2. Do not use demolition debris as backfill material.
3.5 SALVAGE
A. Equipment and materials, including piping within the limits of demolition, unless otherwise specified, will become the property of the CONTRACTOR.
END OF SECTION
SELECTIVE DEMOLITION 02070 - 1
SECTION 02070 - SELECTIVE DEMOLITION
PART 1 - GENERAL
RELATED DOCUMENTS
Drawings and general provisions of Contract, including General Division 1 Specification Sections, apply to this Section.
SUMMARY
This Section includes, but is not limited to, the following:
Demolition and removal of selected site elements including site pavements and slabs-on-grade.
Disconnecting, capping or sealing, and abandoning or removing existing site utilities.
Demolition and removal of dumpster screen walls, slab-on-grade footings, and associated elements.
Demolition and removal of fencing.
Relocation of existing site utilities, including light poles.
Demolition and removal of existing underground concrete rubble. Refer to Specification Section 02200.
Demolition and removal of other above and below grade improvements to accommodate new construction.
Demolition and removal of existing trench drain.
Patching and repairing.
Demolition and removal of curb and gutter.
Related Sections: The following Sections contain requirements that relate to this Section:
Division 1 Section "Cutting and Repairing" for cutting and repairing procedures for selective demolition operations.
Division 2 Section "Site Clearing" for site clearing and removal of topsoil and vegetation.
Division 2 Section "Earthwork" for soil materials, excavating, backfilling, and site grading.
SELECTIVE DEMOLITION 02070 - 2
Division 2 Section “Landscape Work” for relocation of trees.
DEFINITIONS
Remove: Remove and legally dispose of items except those indicated to be reinstalled, salvaged, or to remain the Government’s property.
Existing to Remain: Protect construction indicated to remain against damage and soiling during selective demolition.
MATERIALS OWNERSHIP
Except for items or materials indicated to be reused, salvaged, reinstalled, or otherwise indicated to remain the Government’s property, demolished materials shall become the Contractor's property and shall be removed from the site with further disposition at the Contractor's option, unless otherwise indicated.
SUBMITTALS
Schedule indicating proposed sequence of operations for selective demolition work for review prior to start of work. Include coordination for shutoff, capping, and continuation of utility services as required.
Coordinate with adjacent facilities to permit continuing occupation of existing building and parking areas.
QUALITY ASSURANCE
Regulatory Requirements: Comply with hauling and disposal regulations of authorities having jurisdiction.
JOB CONDITIONS
Occupancy: Conduct selective demolition work in manner that will minimize need for disruption of adjacent Government’s normal operations. Provide minimum of 72 hours advance notice to Contracting Officer’s Representative of demolition activities that will affect adjacent occupied facilities.
Condition of Structures: The Government assumes no responsibility for actual condition of items or structures to be demolished.
Conditions existing at time of inspection for bidding purposes will be maintained by Government insofar as practicable.
Partial Demolition and Removal: Items indicated to be removed but of salvageable value to Contractor may be removed as work progresses. Transport salvaged items from site as they are removed.
SELECTIVE DEMOLITION 02070 - 3
Storage or sale of removed items on site will not be permitted.
Protections: Provide temporary barricades and other forms of protection to protect from injury due to selective demolition work.
Conduct operations to prevent damage to adjacent buildings, structures, sidewalks, pavements, and other facilities and to prevent injury or damage to persons or property.
Provide interior and exterior shoring, bracing, or support to prevent movement, settlement, or collapse of structure or element to be demolished and adjacent facilities or work to remain.
Remove protections at completion of work.
Damages: Promptly repair damages caused to adjacent facilities by demolition work.
Environmental Controls: Comply with governing regulations pertaining to environmental protection.
PART 2 - PRODUCTS (Not Applicable)
PART 3 - EXECUTION
EXAMINATION
Verify that utilities have been disconnected and capped.
Survey existing conditions and correlate with requirements indicated to determine extent of selective demolition required.
When unanticipated mechanical, electrical, or structural elements that conflict with the intended function or design are encountered, investigate and measure the nature and extent of the conflict. Promptly submit a written report to the Architect.
UTILITY SERVICES
Maintain existing utilities to remain in service and protect them against damage during selective demolition operations.
Do not interrupt existing utilities serving occupied or operating facilities, except when authorized in writing by Contracting Officer and authorities having jurisdiction. Provide temporary services during interruptions to existing utilities, as acceptable to Government.
SELECTIVE DEMOLITION 02070 - 4
Provide not less than 72 hours' notice to Contracting Officer if shutdown of service is required during changeover.
Utility Requirements: Locate, identify, disconnect, and seal or cap off indicated utility services.
Where utility services are required to be removed, relocated, or abandoned, provide bypass connections to maintain continuity of service to other used or occupied buildings before proceeding with selective demolition.
PREPARATION
General: Provide interior and exterior shoring, bracing, or support to preserve stability and prevent movement, settlement, or collapse of areas to be demolished.
Drain, purge, or otherwise remove, collect, and dispose of chemicals, gases, acids, or other dangerous materials before proceeding with selective demolition operations.
Conduct demolition operations and remove debris to ensure minimum interference with roads, streets, walks, and other adjacent occupied and used facilities.
Do not close or obstruct streets, walks, or other adjacent occupied or used facilities without permission from Government. Provide alternate routes around closed or obstructed traffic ways if required by governing regulations.
Conduct demolition operations to prevent injury to people and damage to adjacent buildings and facilities to remain. Ensure safe passage of people around selective demolition area.
Erect temporary protection, such as walks and fences, as needed for protection.
Protect existing site improvements, appurtenances, and landscaping to remain.
DEMOLITION
General: Perform selective demolition work in a systematic manner. Use methods required to complete work within limitations of governing regulations and as follows:
Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction. To minimize disturbance of adjacent surfaces, use hand or small power tools designed for sawing or grinding, not hammering and chopping.
Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.
SELECTIVE DEMOLITION 02070 - 5
Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations.
Maintain portable fire-suppression devices during flame-cutting operations.
Maintain adequate ventilation when using cutting torches.
Remove decayed, vermin-infested, or unsuitable materials and promptly dispose of off-site.
Remove structural framing members and lower to ground by method suitable to avoid free fall and to prevent ground impact or dust generation.
Return elements of construction and surfaces to remain to condition existing before start of selective demolition operations.
Locate demolition equipment throughout structure and promptly remove debris to avoid imposing excessive loads on supporting walls, floors, or framing.
Demolish concrete and masonry in small sections. Cut concrete and masonry at junctures with construction to remain, using power-driven masonry saw or hand tools; do not use power-driven impact tools.
Break up and remove concrete slabs on grade, footings, and foundations, unless otherwise shown to remain.
Completely fill below-grade areas and voids resulting from demolition work. Provide fill consisting of approved earth, gravel, or sand, free of trash and debris, stones over 6 inches in diameter, roots, or other organic matter and thoroughly compact to specified criteria per Section 02200.
DISPOSAL OF DEMOLISHED MATERIALS
Remove from building site debris, rubbish, and other materials resulting from demolition operations, unless otherwise acceptable to Contracting Officer. Transport and legally dispose off site.
If hazardous materials are encountered during demolition operations, comply with applicable regulations, laws, and ordinances concerning removal, handling, and protection against exposure or environmental pollution.
Burning of removed materials is not permitted on project site.
PATCHING AND REPAIRING
Promptly patch and repair damaged surfaces caused to adjacent construction by selective demolition operations.
SELECTIVE DEMOLITION 02070 - 6
Patching is specified in Division 1 Section "Cutting and Repairing."
Where repairs to existing surfaces are required, patch to produce surfaces suitable for new materials.
END OF SECTION 02070
BASE COURSE 02236 - 1
SECTION 02236 - BASE COURSE
PART 1 GENERAL
1.1 REFERENCES
A. The following is a list of standards which may be referenced in this section:
1. American Association of State Highway and Transportation Officials (AASHTO):
a. T 238, Standard Method of Test for Density of Soil and Soil-Aggregate in Place by Nuclear Methods (Shallow Depth).
1.2 DEFINITIONS
A. Completed Course: Compacted, unyielding, free from irregularities, with smooth, tight even surface, true to grade, line, and cross-section.
B. Completed Lift: Compacted with uniform surface reasonably true to cross-section.
C. Standard Specifications: 1996 Standard Specifications for Construction, Michigan Department of Transportation.
1.3 SUBMITTALS
A. Samples: Submit for specified materials 15 days prior to delivery to site.
B. Quality Control Submittals:
1. Certified Test Results on Source Materials: Submit copies from commercial testing laboratory 15 days prior to delivery of materials to project.
2. Certified Results of In-Place Density Tests from independent testing agency.
PART 2 PRODUCTS
2.1 BASE COURSE
A. Class 21AA dense graded aggregate as specified in Section 902.06 of the Standard Specifications.
2.2 SOURCE QUALITY CONTROL
A. CONTRACTOR: Perform tests necessary to locate acceptable source of materials meeting specified requirements.
BASE COURSE 02236 - 2
B. Final approval of aggregate material will be based on test results on installed materials.
C. Should separation of coarse from fine materials occur during processing or stockpiling, immediately change methods of handling materials to correct uniformity in grading.
PART 3 EXECUTION
3.1 SUBGRADE PREPARATION
A. As specified in Section 02220, FILL AND BACKFILL.
B. Obtain CONTRACTING OFFICER's acceptance of subgrade before placement of aggregate base course.
C. Do not place base materials in snow or on soft, muddy, or frozen subgrade.
3.2 EQUIPMENT
A. Compaction Equipment: Adequate in design and number to provide compaction and obtain the specified density for each layer.
3.3 HAULING AND SPREADING
A. Hauling and Spreading: In accordance with Section 302.03 of the Standard
Specifications.
B. Hauling Materials:
1. Do not haul over surfacing in process of construction.
C. Spreading Materials:
1. Distribute material to provide required density, depth, grade and dimensions with allowance for subsequent lifts.
2. Produce even distribution of material upon roadway without segregation.
3. Should segregation of coarse from fine materials occur during placing, immediately change methods of handling materials to correct uniformity in grading.
3.4 CONSTRUCTION OF COURSES
A. Construction of Courses: In accordance with Section 302.03 of the Standard
B. General: Complete each lift in advance of laying succeeding lift to provide
BASE COURSE 02236 - 3
required results and adequate inspection.
3.5 ROLLING AND COMPACTION
A. Rolling and Compaction: In accordance with Section 302.03 of the Standard
3.6 FIELD QUALITY CONTROL
A. In-Place Density Tests:
1. Construct base course so areas shall be ready for testing.
2. Perform a minimum of 1 test per acre, minimum 1 per lift in accordance with AASHTO T 191, T 205, or T 238 at locations acceptable to CONTRACTING
OFFICER.
3.7 CLEANING
A. Remove excess material; clean stockpile areas of aggregate.
END OF SECTION 02236
PORTLAND CEMENT CONCRETE PAVING 02520 - 1
SECTION 02520 - PORTLAND CEMENT CONCRETE PAVING
RELATED DOCUMENTS
Drawings and general provisions of the Contract, including General and Division 1 Specification Sections, apply to this Section.
SUMMARY
This Section includes exterior portland cement concrete paving for the following:
Roadways and drives.
Parking areas.
Curbs and gutters.
Walkways.
Division 2 Section "Earthwork" for subgrade preparation, grading and stabilization.
Division 3 Section "Cast-in-Place Concrete" for general building applications of concrete.
Division 2 Section “Portland Cement Concrete Pavement for Airfield Construction”, for exterior apron and tow-way paving.
Division 7 Section "Joint Sealants" for joint fillers and sealants within concrete paving and at joints with adjacent construction.
SUBMITTALS
General: Submit the following according to the Conditions of the Contract and Division 1 Specification Sections.
Product data for proprietary materials and items, including reinforcement and forming accessories, admixtures, joint systems, curing compounds, and others if requested by Contracting Officer.
Design mixes for each class of concrete. Include revised mix proportions when characteristics of materials, project conditions, weather, test results, or other circumstances warrant adjustments.
Laboratory test reports for evaluation of concrete materials and mix design tests.
Material certificates in lieu of material laboratory test reports when permitted by Contracting Officer.
PORTLAND CEMENT CONCRETE PAVING 02520 - 2
Material certificates shall be signed by manufacturer and Contractor certifying that each material item complies with or exceeds requirements.
QUALITY ASSURANCE
Concrete Standards: Comply with provisions of the following standards, except where more stringent requirements are indicated.
American Concrete Institute (ACI) 301, "Specifications for Structural Concrete for Buildings."
ACI 318, "Building Code Requirements for Reinforced Concrete."
Concrete Reinforcing Steel Institute (CRSI) "Manual of Standard Practice."
Concrete Testing Service: Employ at Contractor's expense a qualified independent testing agency to perform materials evaluation tests and to design concrete mixes.
PROJECT CONDITIONS
Traffic Control: Maintain access for vehicular and pedestrian traffic as required for other construction activities.
PART 2 - PRODUCTS
FORMS
Form Materials: Plywood, metal, metal-framed plywood, or other acceptable panel-type materials to provide full-depth, continuous, straight, smooth exposed surfaces.
Use flexible or curved forms for curves of a 100-foot or less radius.
Form Release Agent: Provide commercial formulation form-release agent with a maximum of 350 g/L volatile organic compounds (VOCs) that will not bond with, stain, or adversely affect concrete surfaces and will not impair subsequent treatments of concrete surfaces. Product shall be equal to “React S”, Conspec Marketing & Mfg. Co.
R EINFORCING MATERIALS
Reinforcing Bars and Tie Bars: ASTM A 615, Grade 60, deformed.
Welded Steel Wire Fabric: ASTM A 185.
Furnish in flat sheets, not rolls.
Joint Dowel Bars: Plain steel bars, ASTM A 615, Grade 60. Cut bars true to length with ends square and free of burrs.
Supports for Reinforcement: Chairs, spacers, dowel bar supports and other devices for spacing, supporting, and fastening reinforcing bars, welded wire fabric, and dowels in place. Use wire bar-type
PORTLAND CEMENT CONCRETE PAVING 02520 - 3
s upports complying with CRSI specifications.
Use supports with sand plates or horizontal runners where base material will not support chair legs.
C ONCRETE MATERIALS
Portland Cement: ASTM C 150, Type I.
Use one brand of cement throughout Project.
Fly Ash: Fly ash will not be permitted in concrete.
Normal-Weight Aggregates: ASTM C 33, as Specified in Section 03300. Provide aggregates from a single source. Coarse aggregates shall meet the requirements for deleterious substances contained in
STM C 33, Class 45. A W ater: Potable.
ADMIXTURES
Provide concrete admixtures that contain not more than 0.1 percent chloride ions.
Air-Entraining Admixture: ASTM C 260, certified by manufacturer to be compatible with other required admixtures.
Water-Reducing Admixture: ASTM C 494, Type A.
High-Range Water-Reducing Admixture: ASTM C 494, Type F or Type G.
Water-Reducing and Accelerating Admixture: ASTM C 494, Type E.
Water-Reducing and Retarding Admixture: ASTM C 494, Type D.
P roducts: Subject to compliance with requirements, provide products specified in Section 03300.
C URING MATERIALS
Absorptive Cover: Burlap cloth made from jute or kenaf, weighing approximately 9 oz. per sq. yd., complying with AASHTO M 182, Class 2.
Moisture-Retaining Cover: One of the following, complying with ASTM C 171.
Waterproof paper.
Polyethylene film.
White burlap-polyethylene sheet.
Water-based Resin Liquid Membrane-Forming Curing Compound: ASTM C 309, Type II, Class A or B, ax free. w Evaporation Control: Monomolecular film-forming compound applied to exposed concrete slab surfaces
PORTLAND CEMENT CONCRETE PAVING 02520 - 4
for temporary protection from rapid moisture loss.
P roducts: Subject to compliance with requirements, provide one of the following:
White Pigment Water-Based Resin Liquid Membrane-Forming Curing Compound:
D.O.T. Resin Cure; Type II Conspec Marketing & Mfg. Co.
Kurez Vox, Type II; Euclid Chemical Co.
Evaporation Control:
Aquafilm; Conspec Marketing and Mfg. Co.
Eucobar; Euclid Chemical Co.
E-Con; L&M Construction Chemicals, Inc.
Confilm; Master Builders, Inc.
R ELATED MATERIALS
Traffic Paint: Alkyd-resin ready-mixed, complying with AASHTO M 248 and Federal Specification TT- P-001952.
Color: As indicated on drawings.
Bonding Agent: Acrylic or styrene butadiene. Product shall be equal to “Strongbond”, Conspec Marketing & Mfg. Co.
Epoxy Adhesive: ASTM C 881, two-component material suitable for dry or damp surfaces. Provide material type, grade, and class to suit requirements. Product shall be equal to “Specbond Epoxies”, Conspec Marketing & Mfg. Co.
CONCRETE MIX
Prepare design mixes for each type and strength of normal-weight concrete by either laboratory trial batch or field experience methods as specified in ACI 301. For the trial batch method, use a qualified independent testing agency for preparing and reporting proposed mix designs.
Use of fly ash will not be permitted.
Submit written reports to Contracting Officer’s Representative of each proposed mix for each class of concrete at least 15 days prior to start of Work. Do not begin concrete production until proposed mix designs have been reviewed by Contracting Officer’s Representative.
Proportion mixes according to ACI 211.1 and ACI 301 to provide normal-weight concrete with the ollowing properties: f
Compressive Strength (28-Day): 4000 psi, minimum.
Flexural Strength (28-Day): 650 psi, minimum.
PORTLAND CEMENT CONCRETE PAVING 02520 - 5
Maximum Water-Cement Ratio at Point of Placement: 0.45.
Cement Content: Not less than six bags per cubic yard.
Slump Limit at Point of Placement: Not more than 3 inches.
Slump limit for concrete containing high-range water-reducing admixture
(superplasticizer): Not more than 8 inches after adding admixture to site-verified 2-to-3-inch slump concrete.
Add air-entraining admixture at manufacturer's prescribed rate to result in concrete at point of placement having an air content as follows:
Air Content: 5.5 percent to 7.0 percent.
Adjustment to Concrete Mixes: Mix design adjustments may be requested by Contractor when characteristics of materials, project conditions, weather, test results, or other circumstances warrant.
CONCRETE MIXING
Ready-Mixed Concrete: Comply with requirements of Specification Section 03300.
S URFACE PREPARATION
Proof-roll prepared subbase surface to check for unstable areas and verify need for additional compaction.
Do not begin paving work until such conditions have been corrected and are ready to receive paving.
Refer to Specification Section 02200.
Remove loose material from compacted subbase surface immediately before placing concrete.
EDGE FORMS AND SCREED CONSTRUCTION
Set, brace, and secure edge forms, bulkheads, and intermediate screed guides for paving to required lines, grades, and elevations. Install forms to allow continuous progress of work and so that forms can remain in lace at least 24 hours after concrete placement. p Check completed formwork and screeds for grade and alignment to following tolerances:
Top of Forms: Not more than 1/8 inch in 10 feet.
Vertical Face on Longitudinal Axis: Not more than 1/4 inch in 10 feet.
Clean forms after each use and coat with form release agent as required to ensure separation from concrete without damage.
PLACING REINFORCEMENT
PORTLAND CEMENT CONCRETE PAVING 02520 - 6
General: Comply with Concrete Reinforcing Steel Institute's recommended practice for "Placing Reinforcing Bars" for placing and supporting reinforcement.
Clean reinforcement of loose rust and mill scale, earth, ice, or other bond-reducing materials.
Arrange, space, and securely tie bars and bar supports to hold reinforcement in position during concrete placement. Maintain minimum cover to reinforcement.
Install welded wire fabric in lengths as long as practicable. Lap adjoining pieces at least one full mesh and lace splices with wire. Offset laps of adjoining widths to prevent continuous laps in either direction.
JOINTS
General: Construct contraction, construction, and isolation joints true to line with faces perpendicular to surface plane of concrete. Construct transverse joints at right angles to the centerline, unless indicated otherwise.
Contraction Joints: Provide weakened-plane contraction joints, sectioning concrete into areas as shown on Drawings. Construct contraction joints for a depth equal to at least 1/4 of the concrete thickness, as ollows: f
Tooled Joints: Form contraction joints in fresh concrete by grooving and finishing each edge of joint with a radiused jointer tool. Permitted for use on walkways only.
Sawed Joints: Form contraction joints with power saws equipped with shatterproof abrasive or diamond-rimmed blades. Cut joints into hardened concrete as shown on drawings when cutting action will not tear, abrade, or otherwise damage surface and before development of random contraction cracks. Cutting shall be completed not more than 12 hours after placement of concrete.
Construction Joints: Set construction joints at side and end terminations of paving and at locations where aving operations are stopped for more than 1/2 hour, unless paving terminates at isolation joints. p Continue reinforcement across construction joints unless indicated otherwise.
Use bonding agent on existing concrete surfaces that will be joined with fresh concrete.
Isolation Joints: Form isolation joints of preformed joint filler strips abutting concrete curbs, catch basins, anholes, inlets, structures, walks, other fixed objects, and where indicated. m Locate expansion joints as indicated on Drawings, or, if not indicated, at maximum intervals of 50 feet as acceptable by Contracting Officer’s Representative.
Extend joint fillers full width and depth of joint, not less than 1/2 inch or more than 1 inch below finished surface where joint sealant is indicated.
All isolation and expansion joints shall be filled with joint sealant.
Furnish joint fillers in one-piece lengths for full width being placed wherever possible. Where
PORTLAND CEMENT CONCRETE PAVING 02520 - 7
more than one length is required, lace or clip joint filler sections together.
Protect top edge of joint filler during concrete placement with a metal, plastic, or other temporary preformed cap. Remove protective cap after concrete has been placed on both sides of joint.
In combined curb and gutter and valley gutter sections, locate expansion joints at the tangent point of all curves, each side of inlets, and at intervals of not more than 250 feet in straight runs. Expansion joints shall be cut to full size and shape of the cross section of the curb and gutter less one-half inch from the finished surface thereof. The edges of the blocks against the joint shall be finished with an edging tool and the joint raked clean of concrete.
I nstallation of joint fillers and sealants is specified in Division 7 Section "Joint Sealants."
Install dowel bars and support assemblies at joints where indicated. Lubricate or asphalt-coat one half of dowel length to prevent concrete bonding to one side of joint.
CONCRETE PLACEMENT
Inspection: Before placing concrete, inspect and complete formwork installation, reinforcing steel, and items to be embedded or cast in. Notify other trades to permit installation of their work.
Remove snow, ice, or frost from subbase surface and reinforcing before placing concrete. Do not place concrete on surfaces that are frozen.
Moisten subbase to provide a uniform dampened condition at the time concrete is placed. Do not place concrete around manholes or other structures until they are at the required finish elevation and alignment.
Comply with requirements and with ACI 304R for measuring, mixing, transporting, and placing concrete.
Deposit and spread concrete in a continuous operation between transverse joints. Do not push or drag oncrete into place or use vibrators to move concrete into place. c
When concrete placing is interrupted for more than 1/2 hour, place a construction joint.
Use a bonding agent at locations where fresh concrete is placed against hardened or partially hardened concrete surfaces.
Consolidate concrete by mechanical vibrating equipment supplemented by hand-spading, rodding, or tamping. Use equipment and procedures to consolidate concrete complying with ACI 309R.
Consolidate concrete along face of forms and adjacent to transverse joints with an internal vibrator.
Keep vibrator away from joint assemblies, reinforcement, or side forms. Use only square-faced shovels for hand-spreading and consolidation. Consolidate with care to prevent dislocating reinforcing, dowels, and joint devices.
Screed paved surfaces with a straightedge and strike off. Use bull floats or darbies to form a smooth surface plane before excess moisture or bleed water appears on the surface. Do not further disturb
PORTLAND CEMENT CONCRETE PAVING 02520 - 8
concrete surfaces prior to beginning finishing operations.
Curbs and Gutters: When automatic machine placement is used for curb and gutter placement, submit revised mix design and laboratory test results that meet or exceed requirements. Produce curbs and gutters to required cross section, lines, grades, finish, and jointing as specified for formed concrete. If results are ot acceptable, remove and replace with formed concrete. n Cold-Weather Placement: Comply with provisions of ACI 306R and as follows. Protect concrete work from physical damage or reduced strength that could be caused by frost, freezing actions, or low temperatures.
When air temperature has fallen to or is expected to fall below 40 deg F (4 deg C), uniformly heat water and aggregates before mixing to obtain a concrete mixture temperature of not less than 50 deg F (10 deg C) and not more than 80 deg F (27 deg C) at point of placement.
Do not use frozen materials or materials containing ice or snow.
Do not use calcium chloride, salt, or other materials containing antifreeze agents or chemical accelerators unless otherwise accepted in mix designs.
Hot-Weather Placement: Place concrete complying with ACI 305R and as specified when hot weather conditions exist.
Cool ingredients before mixing to maintain concrete temperature at time of placement to below 90 deg F (32 deg C). Mixing water may be chilled or chopped ice may be used to control temperature, provided water equivalent of ice is calculated to total amount of mixing water. Using liquid nitrogen to cool concrete is Contractor's option.
Cover reinforcing steel with water-soaked burlap if it becomes too hot, so that steel temperature will not exceed the ambient air temperature immediately before embedding in concrete.
Fog spray forms, reinforcing steel, and subgrade just before placing concrete. Keep subgrade moisture uniform without standing water, soft spots, or dry areas.
CONCRETE FINISHING
Float Finish: Begin floating when bleed water sheen has disappeared and the concrete surface has stiffened sufficiently to permit operations. Float surface with power-driven floats, or by hand-floating if area is small or inaccessible to power units. Finish surfaces to true planes within a tolerance of 1/4 inch in 10 feet as determined by a 10-foot-long straightedge placed anywhere on the surface in any direction. Cut s and fill low spots. Refloat surface immediately to a uniform granular texture. down high spot Medium Textured Broom Finish: Draw a bristle broom across concrete surface perpendicular to line of traffic to provide a uniform fine line texture finish. Repeat operation if required to provide a texture acceptable to Architect.
Final Tooling: Tool edges of paving, gutters, curbs, and joints formed in fresh concrete with a jointing
PORTLAND CEMENT CONCRETE PAVING 02520 - 9
tool.
Repeat tooling of edges and joints after applying surface finishes. Eliminate tool marks on concrete urfaces. s
CONCRETE PROTECTION AND CURING
General: Protect freshly placed concrete from premature drying and excessive cold or hot temperatures.
Comply with the recommendations of ACI 306R for cold weather protection and ACI 305R for hot weather protection during curing.
Evaporation Control: In hot, dry, and windy weather, protect concrete from rapid moisture loss before and during finishing operations with an evaporation-control material. Apply according to manufacturer's instructions after screeding and bull floating, but before floating.
Begin curing after finishing concrete but not before free water has disappeared from concrete surface.
Curing Methods: Cure concrete by moisture curing, moisture-retaining-cover curing, curing compound, or a combination of these as follows:
Moisture Curing: Keep surfaces continuously moist for not less than 7 days with the following materials:
Water.
Continuous water-fog spray.
Absorptive cover, water saturated, and kept continuously wet. Cover concrete surfaces and edges with a 12-inch lap over adjacent absorptive covers.
Moisture-Retaining-Cover Curing: Cover concrete surfaces with moisture-retaining cover for curing concrete, placed in widest practicable width, with sides and ends lapped at least 12 inches, and sealed by waterproof tape or adhesive. Immediately repair any holes or tears during curing period using cover material and waterproof tape.
Curing Compound: Apply uniformly in continuous operation by power spray or roller according to manufacturer's directions. Recoat areas subjected to heavy rainfall within 3 hours after initial application. Maintain continuity of coating and repair damage during curing period.
TRAFFIC PAINT
Traffic Paint: Apply traffic paint for striping and other markings with mechanical equipment to produce uniform straight edges. Apply at manufacturer's recommended rates to provide a 15-mil minimum wet film thickness.
F IELD QUALITY CONTROL TESTING
Employ a qualified independent testing and inspection agency to sample materials, perform tests, and submit test reports during concrete placement as specified in Section 03300.
REPAIRS AND PROTECTION
PORTLAND CEMENT CONCRETE PAVING 02520 - 10
Remove and replace concrete paving that is broken, damaged, or defective, or does not meet the requirements of this Section.
Drill test cores where directed by Contracting Officer when necessary to determine magnitude of cracks or defective areas. Fill drilled core holes in satisfactory pavement areas with portland cement concrete bonded to paving with epoxy adhesive.
Protect concrete from damage. Exclude traffic from paving for at least 14 days after placement. When construction traffic is permitted, maintain paving as clean as possible by removing surface stains and spillage of materials as they occur.
Maintain concrete paving free of stains, discoloration, dirt, and other foreign material. Sweep concrete paving prior to date scheduled for Substantial Completion.
END OF SECTION 02520
WATER SERVICE CONNECTION 02662 - 1
SECTION 02662 - WATER SERVICE CONNECTIONS
PART 1 GENERAL
1.1 REFERENCES
A. The following is a list of standards which may be referenced in this section:
1. American Society for Testing and Materials (ASTM):
a. B32, Standard Spec for Solder Metal.
b. B88, Seamless Copper Water Tube.
PART 2 PRODUCTS
2.1 COPPER TUBING
A. Size: 1-inch to 2-1/2-inch service connections.
B. Characteristics:
1. Type K, soft, seamless.
2. Conform to ASTM B88.
3. Commercially pure wrought copper solder joint fittings.
4. Joints:
a. 95-5 coreless wire solder.
b. Conform to ASTM B32, Grade 95 TA.
2.2 DUCTILE IRON PIPE
A. Size: 4-inch and larger service connections.
B. As specified for in Section 02660-01, CEMENT-MORTAR-LINED
DUCTILE IRON PIPE AND FITTINGS.
2.3 SERVICE CONNECTION
WATER SERVICE CONNECTION 02662 - 2
A. Furnish components same size as nominal designation of service pipe. For example, 3/4-inch connection consists of:
1. 3/4-inch corporation stop,
2. 3/4-inch curb stop, or
3. 3/4-inch angle valve.
4. 3/4-inch meter couplings.
2.4 SERVICE SADDLES
2.5 CORPORATION STOPS
2.7 FLEXIBLE COUPLINGS
Manufacturer &
Service Size Characteristics Model
3/4-inch through AWWA C800 thread inlet; compression Mueller: H-15000 1-1/2 inch connection for copper pipe outlet or Hays: 5200
2-inch Outside iron pipe thread inlet; compression Mueller: H-15025 connection for copper pipe outlet or Hays: 5204
2-1/2 inch Shall conform to AWWA C800
2.6 COUPLINGS
Service Size Characteristics Manufacturer & Model
3/4-inch through 2-inch Three-part union; copper-to-copper for connecting new copper service pipe to existing copper service pipe; other coupling as required to connect new copper service to existing other-than-copper pipe;
compression connection outlet
Mueller: H- 15400
A. Characteristics: Straight cast couplings.
B. Manufacturer: Smith-Blair; Model No. 441.
2.8 UNIONS
A. Characteristics: Copper-to-copper union.
B. Manufacturers:
WATER SERVICE CONNECTION 02662 - 3
1. Mueller Co.; Model H-15400.
2. Hays Manufacturing Co.; Model 5615.
2.9 MISCELLANEOUS FITTINGS
A. Characteristics: Miscellaneous fittings, reducers, and adapters.
B. Manufacturers:
1. Mueller Co.
2. Hays Manufacturing Co.
2.9 CURB STOPS
2.11 CURB BOXES
Manufacturer &
Service Size Characteristics Model
1-inch through 2-inch Conductive compressive connection Mueller: H-15209
2-1/2 inch Shall conform to AWWA C800
A. Characteristics:
1. Furnish with lids and plugs.
2. 5-1/2 feet long, extension type.
3. Arch pattern base.
B. Manufacturers: Mueller Co.; Model H-10310.
2.12 METER
A. As specified in Section 15400, PLUMBING AND MISCELLANEOUS PIPING
SYSTEMS.
PART 3 EXECUTION
3.1 GENERAL
A. Install service connections, excluding meters, during or after construction of the main.
B. Install water meters after entire water system is ready for operation.
WATER SERVICE CONNECTION 02662 - 4
C. Depth of cover over the pipe shall be minimum 60 inches.
3.2 CONNECTION TO MAIN
A. Clean exterior of main of dirt and other foreign matter that may impair the quality of the completed connection.
B. Place service clamp at desired location.
C. Clamp by tightening alternate nuts progressively.
D. Do not place service clamp within 1-foot of pipe joint, or another clamp.
E. Make taps with adapters for the size main being tapped.
3.3 COPPER TUBING
A. Cut square ends, ream clean, and flare and make up tightly.
B. Prevent the tube from kinking or buckling on short radius bends. If tube should kink or buckle, cut out kinked or buckled sections and splice with brass fitting.
3.4 METERS
A. Meter to be installed inside buildings in accordance with Section 15400, PLUMBING AND MISCELLANEOUS PIPING SYSTEMS.
3.5 TESTING
A. Test service connection and piping at the normal main pressure after main has been connected and pressure tested as specified in Section 15992, PIPE TESTING.
B. Inspect service connections for leakage under normal system pressure. Joints shall be watertight before acceptance.
C. Test Duration: At least 15 minutes.
D. Inspect for leaks and repair before backfilling.
3.6 DISINFECTION OF SERVICE CONNECTIONS
A. Following connection to the main:
1. Close corporation stop and meter stop.
2. Connect new copper tubing to existing copper tubing or to meter stop.
3. Open corporation stop and allow to stand at main pressure for a minimum of 30 minutes.
WATER SERVICE CONNECTION 02662 - 5
4. Open meter stop.
C. Extra chlorine will be put into the system by CONTRACTOR during service connection transfers to provide adequate disinfection capacity when above procedures are executed.
END OF SECTION 02662
GRAVITY PIPING FOR STORM DRAIN AND 02700 - 1
AND SANITARY SEWER SERVICE
SECTION 02700 - GRAVITY PIPING FOR STORM DRAIN AND SANITARY SEWER SERVICE
CONNECTIONS
PART 1 GENERAL
1.1 SCOPE
A. This section covers all project storm drain piping and the sanitary sewer service connection pipe from the main line to a point approximately 5 feet outside of the building wall. See Section 15060, PIPING—GENERAL, for building waste piping, including piping under the building footprint to the point of connection to the sanitary sewer service connection pipe. The two drawings titled, “Charter Township of Harrison Standard Sanitary Sewer Details” cover the sanitary sewer main line piping.
1.2 REFERENCES
A. The following is a list of standards which may be referenced in this section and any supplemental Data Sheets:
1. American Association of State Highway and Transportation Officials
(AASHTO):
a. M36, Interim Specification for Corrugated Steel Pipe, Metallic Coated for Sewers and Drains.
2. American Society for Testing and Materials (ASTM):
a. C76, Standard Specification for Reinforced Concrete Culvert, Storm Drain, and Sewer Pipe.
b. C150, Standard Specification for Portland Cement.
c. C443 REV A, Standard Specification for Joints for Circular Concrete
Sewer and Culvert Pipe, Using Rubber Gaskets
d. C497, Standard Test Methods for Testing Concrete Pipe, Manhole Sections, or Tile.
e. D1784, Standard Specification for Rigid Poly(Vinyl Chloride) (PVC)
Compounds and Chlorinated Poly(Vinyl Chloride) (CPVC) Compounds
f. D3034-89, Standard Specification for Type PSM Poly(Vinyl Chloride)
(PVC) Sewer Pipe and Fittings.
g. D3212, Standard Specification for Joints for Drain and Sewer Plastic
GRAVITY PIPING FOR STORM DRAIN AND 02700 - 2
AND SANITARY SEWER SERVICE
Pipes Using Flexible Elastomeric Seals.
h. F477, Standard Specification for Elastomeric Seals (Gaskets) for Joining
Plastic Pipe.
141618.BB.DS JANUARY 5, 1999
02700 1 GRAVITY PIPING FOR
STORM DRAIN AND SANITARY
SEWER
SERVICE CONNECTIONS
1.3 SUBMITTALS
A. Quality Control Submittals: Manufacturer’s Certification of Compliance.
PART 2 PRODUCTS
2.1 PIPE AND FITTINGS
A. As specified in the Data Sheets following “END OF SECTION.”
2.2 SANITARY SEWER SERVICE CONNECTIONS
A. Pipe and fittings for individual sanitary sewer service connection shall be of one type of material throughout.
B. Polyvinyl chloride pipe.
PART 3 EXECUTION
3.1 INSTALLATION OF PIPE, FITTINGS, AND APPURTENANCES
A. General:
1. Pipe laying shall proceed upgrade with spigot ends pointing in direction of flow.
2. Excavate bell holes at each joint to permit correct assembly and inspection of entire joint.
3. Pipe invert may deviate from line or grade up to 1/2-inch for line and 1/4-inch for grade, provided that finished pipe line will present a uniform bore, and such variation does not result in a level or reverse sloping invert, or less than minimum slope shown.
4. Pipe bedding shall form a continuous and uniform bearing and support for the pipe barrel between joints. Pipe shall not rest directly on the bell or pipe joint.
GRAVITY PIPING FOR STORM DRAIN AND 02700 - 3
AND SANITARY SEWER SERVICE
5. Prevent entry of foreign material into gasketed joints.
6. Plug or close off pipes which are stubbed off for manhole, concrete structure, or for connection by others, with temporary watertight plugs.
B. Concrete Closure Collars: Only use concrete closure collars where shown or authorized by CONTRACTING OFFICER.
C. Service Connections:
1. Minimum Slope: 1/4-inch per foot.
3.2 PRESSURE TESTING
141618.BB.DS JANUARY 5, 1999
02700 2 GRAVITY PIPING FOR
STORM DRAIN AND SANITARY
SEWER
SERVICE CONNECTIONS
A. As specified in Section 15992, PIPING LEAKAGE TESTING.
3.3 REPAIR AND RETESTING
A. Sections of pipe not meeting test requirements shall be replaced or have individual joints tested and sealed.
B. Following repairs, sections shall be retested as specified.
3.4 SEWER CLEANING
A. Prior to final acceptance and final manhole-to-manhole inspection of the sewer system by CONTRACTING OFFICER, flush and clean all parts of the system. Remove all accumulated construction debris, rocks, gravel, sand, silt, and other foreign material from the sewer system at or near the closest downstream manhole. If necessary, use mechanical rodding or bucketing equipment.
B. Upon CONTRACTING OFFICER’s final manhole-to-manhole inspection of the sewer system, if any foreign matter is still present in the system, reflush and clean the sections and portions of the lines as required.
3.5 SUPPLEMENTS
A. Data Sheets.
GRAVITY PIPING FOR STORM DRAIN AND 02700 - 4
AND SANITARY SEWER SERVICE
Number Title
-02 Corrugated Metal Pipe and Fittings -06 Polyvinyl Chloride
(PVC) Pipe and Fittings -10 Reinforced Concrete Pipe and Fittings
END OF SECTION 02700
141618.BB.DS JANUARY 5, 1999
02700 3 GRAVITY PIPING FOR
STORM DRAIN AND SANITARY
SEWER
SERVICE CONNECTIONS
CAST-IN-PLACE CONCRETE 03300 - 1
SECTION 03300 - CAST-IN-PLACE CONCRETE
PART 1 - GENERAL
RELATED DOCUMENTS
Drawings and general provisions of the Contract, including General and Division 1 Specification Sections, apply to this Section.
SUMMARY
This Section specifies cast-in place concrete, including formwork, reinforcing, mix design, placement procedures, and finishes.
Division 2 Section "Exterior Portland Cement Concrete" for concrete paving and walks.
Division 2 Section “Exterior Portland Cement Concrete Pavement for Airfield Construction” for exterior apron and tow-way paving.
Division 2 Section "Auger Cast Piles” for auger cast piles.
Division 4 Section “Unit Masonry” for grout.
Division 9 Section “Reflective Chemically Resistant Urethane Floor Coating” for coating on Hangar Bay slab.
SUBMITTALS
General: Submit the following according to Conditions of the Contract and Division 1 Specification Sections.
Product data for proprietary materials and items, including reinforcement and forming accessories, admixtures, patching compounds, waterstops, joint systems, curing compounds, and others if requested by Architect.
Shop drawings for reinforcement detailing fabricating, bending, and placing concrete reinforcement.
Comply with ACI 315 "Manual of Standard Practice for Detailing Reinforced Concrete Structures" showing bar schedules, stirrup spacing, bent bar diagrams, and arrangement of concrete reinforcement.
Include special reinforcing required for openings through concrete structures.
Samples of materials as requested by Contracting Officer, including names, sources, and descriptions.
Laboratory test reports for concrete materials and mix design test.
Material certificates in lieu of material laboratory test reports when permitted by Contracting Officer.
CAST-IN-PLACE CONCRETE 03300 - 2
Material certificates shall be signed by manufacturer and Contractor, certifying that each material item complies with or exceeds specified requirements.
QUALITY ASSURANCE
Codes and Standards: Comply with provisions of the following codes, specifications, and standards, except where more stringent requirements are shown or specified:
American Concrete Institute (ACI) 301, "Specifications for Structural Concrete for Buildings."
ACI 318, "Building Code Requirements for Reinforced Concrete."
Concrete Reinforcing Steel Institute (CRSI) "Manual of Standard Practice."
Concrete Testing Service: Employ at Contractor's expense a testing agency acceptable to Contracting Officer to perform material evaluation tests and to design concrete mixes.
Materials and installed work may require testing and retesting at any time during progress of Work. Tests, including retesting of rejected materials for installed Work, shall be done at Contractor's expense.
PROJECT CONDITIONS
Protection of Footings Against Freezing: Cover completed work at footing level with sufficient temporary or permanent cover as required to protect footings and adjacent subgrade against possibility of freezing, maintain cover for time period as necessary.
Protect adjacent finish materials against spatter during concrete placement.
PART 2 - PRODUCTS
FORM MATERIALS
Forms for Exposed Finish Concrete: Plywood, metal, metal-framed plywood faced, or other acceptable panel-type materials to provide continuous, straight, smooth, exposed surfaces. Furnish in largest practicable sizes to minimize number of joints.
Forms for Unexposed Finish Concrete: Plywood, lumber, metal, or another acceptable material. Provide lumber dressed on at least two edges and one side for tight fit.
Forms for Exposed Columns and Supports: Metal or glass-fiber-reinforced plastic that will produce smooth surfaces without joint indications. Provide units with sufficient wall thickness to resist wet concrete loads without deformation.
Form Release Agent: Provide commercial formulation form release agent with a maximum of 350 g/l volatile organic…