YTMP 24-0001 Drawings.pdf
PDF 4 MB Posted
- Attached to
- Repair Barrel Roof, Hangar 9, Bldg. 7071
- Solicitation number
- FA660626R0006
About this file
These are architectural drawings and design documents for a roof repair project at Westover Air Reserve Base in Chicopee, Massachusetts. The project, identified as YTPM 24-0001, involves repairing the barrel roof of Building 7071 (Hangar 9) and includes demolition, structural modifications, and installation of new roofing systems.
The scope of work requires removal of the existing roof system down to the structural deck, replacement of damaged wood decking (estimated at 5%), and installation of a new roofing assembly consisting of an 80-mil thermoplastic membrane, cover board, and R-30 rigid insulation. The project includes replacement of ten (10) roof drains with new drain assemblies at the base contract price, with additional replacements available at unit pricing with Contracting Officer's Representative (COR) approval. Additional requirements include reinstallation of salvaged snow guard systems with 5% allowance for rail and bracket replacements, installation of two stair towers for roof access, provision of fall protection systems with permanent horizontal lifelines, and various flashing and waterproofing details. The contractor must maintain weather-tight conditions between work periods, limit daily tear-off to areas that can be replaced in a single working day, perform work on the barrel roof before adjacent low-sloped roofs, and comply with asbestos remediation protocols under UFGS 02 82 00. Design criteria includes snow loads of 27 PSF, wind speeds of 90 MPH, and seismic design category B per applicable building codes and UFC standards.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
439 CIVIL ENGINEER SQUADRON
WESTOVER ARB
250 AIRLIFT DR
CHICOPEE, MA 01022-1507
INDEX OF DRAWINGS
SHEET ID SHEET TITLE
G-001 COVER SHEET
-C O
N
TR
AC
T
N O
FI
LE
N
AM
E:
D W
N B
Y:
C
KD
B
Y:
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
D
2 3
C
4 5
A
B
M
AR
K
AP
PR
N
TP
D
AT
E:
FI
LE
N U
M
BE
R
SI
ZE
SU
BM
IT
TE
D B
Y:
PL
O
T
SC
AL
E:
IS
SU
E D
AT
E:
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
D
EL
IV
ER
Y O
R D
ER
SHEET
IDENTIFICATION
D
AT
E
AP
PR
AN
SI
D
AS
N
O
TE
D
G -0
.D
W G
U .S
. A
IR
F O
R C
E R
ES
ER
VE
W es to ve r A R
B, C hi co pe e, M A
C O
M M
AN
D
YT
PM
4-
R
EP
AI
R
B
AR
R
EL
R O
O F
BL
D
G
H
AN
G
AR
W
ES
TO
VE
R
A R
B, C
H
IC
O
PE
E, M
A
AD101 DEMOLITION ROOF PLAN
A-101 ROOF PLAN
G-002 ABBREVIATIONS SYMBOLS AND NOTES
G-001
C O
VE
R
S H
EE
T
D
JH
D
JH
EA
H
N.T.S.1 VICINITY MAP
YTPM 24-0001
REPAIR BARREL ROOF, BLDG 7071, HANGAR 9
WESTOVER AIR RESERVE BASE
CHICOPEE, MA
PROJECT LOCATION
A-501 DETAILS - SHEET 01 OF 02
A-502 DETAILS - SHEET 02 OF 02
S-001 STRUCTURAL NOTES
-C O
N
TR
AC
T
N O
FI
LE
N
AM
E:
D W
N B
Y:
C
KD
B
Y:
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
D
2 3
C
4 5
A
B
M
AR
K
AP
PR
N
TP
D
N U
M
BE
R
SI
ZE
SU
BM
IT
TE
D B
Y:
PL
O
T
SC
AL
E:
IS
SU
E D
AT
E:
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
D
EL
IV
ER
Y O
R D
ER
SHEET
IDENTIFICATION
D
AT
E
AP
PR
AN
SI
D
AS
N
O
TE
D
U .S
. A
IR
F O
R C
E R
ES
ER
VE
W es to ve r A R
B, C hi co pe e, M A
C O
M M
AN
D
YT
PM
4-
R
EP
AI
R
B
AR
R
EL
R O
O F
BL
D
G
1, H
AN
G
AR
W
ES
TO
VE
R
A R
B, C
H
IC
O
PE
E, M
A
GENERAL NOTES STANDARD ABBREVIATIONS
A
A.C. AIR CONDITIONED
A.D. AREA DRAIN
A.F.F. ABOVE FINISH FLOOR
A.H.U. AIR HANDLING UNIT
ALT. ALTERNATE
ALUM. ALUMINUM
AMP.,A AMPERES
A.O. ACCESS OPENING
APPROX. APPROXIMATELY
ARCH. ARCHITECTURAL
A.T.C. ACOUSTICAL TILE CEILING
A.B. ANCHOR BOLT
BAL. BALANCE
BD. BOARD
BLDG. BUILDING
BLK. BLOCK
BM. BEAM
BOT. BOTTOM
BRG. BEARING
B.T.U.H. BRITISH THERMO UNIT/HR.
CAB. CABINET
CAP. CAPACITY
C/B CIRCUIT BREAKER
C.D. CEILING DIFFUSER
CEM. CEMENT
CER. CERAMIC
C.F.M. CUBIC FEET/MINUTE
CIRC. CIRCULATING
C.J. CONTROL JOINT
CK'D CHECKERED
CKT. CIRCUIT
C.L. CENTER LINE
CIEL.,CLG. CEILING
CLO. CLOSET
C.M.U. CONCRETE MASONRY UNIT
C.O. CLEAN OUT
COL. COLUMN
CONC. CONCRETE
COND.
CONN. CONNECTION
CONST. CONSTRUCTION
CONT. CONTINUOUS
CONT'R. CONTRACTOR
CONTR. JT. CONTRACTION JOINT
C.T. CERAMIC TILE
C.T.B. CERAMIC TILE BASE
C. TO C. CENTER TO CENTER
CU. FT.,CF. CUBIC FEET
DET. DETAIL
DIA. DIAMETER
DIFF. DIFFUSER
DIM. DIMENSION
DISC. DISCONNECT
DN. DOWN
DR. DOOR
D.S. DOWNSPOUT
DWG. (S) DRAWING (S)
DSB DOUBLE STRENGTH "B" GLASS
EA. EACH
E.C. EMPTY CONDUIT
E.F. EXHAUST FAN
EL., ELEV. ELEVATION
ELEC. ELECTRIC
EQUIP. EQUIPMENT
E.W. EACH WAY
E.W.C. ELECTRIC WATER COOLER
EXH. EXHAUST
EXP. JT. EXPANSION JOINT
EXT. EXTERIOR
EXIST. EXISTING
F.A. FIRE ALARM
F.C. FLEXIBLE CONNECTION
F.D. FLOOR DRAIN
F.E.C. FIRE EXTINGUISHER CABINET
FIN. FINISH
FL. FLOOR
FT. FOOT - FEET
FTG. FOOTING
FDN. FOUNDATION
GA. GAGE
GAL. GALLON
GALV. GALVANIZED
G.F.E. GOVERNMENT FURNISHED EQUIPMENT
GL. GLASS
GND. GROUND
GOV'T GOVERNMENT
G.P.H. GALLONS/HOUR
G.P.M. GALLONS/MINUTE
GR. GRILLE
G.W.B. GYPSUM WALL BOARD
GYP. GYPSUM
H. HIGH
H.B. HOSE BIBB
H.C. HOLLOW CORE
HT. HEIGHT
H.M. HOLLOW METAL
H.P. HORSE POWER
HR. HOUR
HTG. HEATING
HTR. HEATER
HVAC HEATING, VENTILATION AND AIR CONDITIONING
HW., HDWE. HARDWARE
HYD. HYDRANT
HORIZ. HORIZONTAL
I.D. INSIDE DIAMETER
I.E. INVERT
IN. INCHES
INCAND. INCANDESCENT
INSUL. INSULATION
INT. INTERIOR
J.B. JUNCTION BOX
JCT. JUNCTION
JT. JOINT
KVA KILOVOLT AMPERE
KW. KILOWATT
LB. POUND
LG. LONG
L.P. LIGHTING PANEL
LTG. LIGHTING
LAV. LAVATORY
M. MOTOR
MAINTENANCEMAINT.
MAX. MAXIMUM
M.D.P. MAIN DISTRIBUTION PANEL
MECH. MECHANICAL
MTL. METAL
MIN. MINIMUM
MISC. MISCELLANEOUS
M.O. MASONRY OPENING
M.T. METAL THRESHOLD
MTD. MOUNTED
MTG. MOUNTING
M.V. MECHANICAL VENTILATION
N.A. NOT APPLICABLE
N.I.C. NOT IN CONTRACT
NO., # NUMBER
O.A. OUTDOOR AIR
O.C. ON CENTER
O.D. OUTSIDE DIAMETER
O.H. OVERHEAD
OL. OVERLOAD
OPNG. OPENING
OPP. OPPOSITE
O.S.D. OPEN SIGHT DRAIN
P. PAPER
PART'N. PARTITION
PER. PERIMETER
PL. PLATE
PLBG. PLUMBING
PLYD. PLYWOOD
PNL. PANEL
PRESS. PRESSURE
PSF POUNDS / SQUARE FOOT
PSI POUNDS / SQUARE INCH
PSIG POUNDS / SQUARE INCH GAGE
PT. PRESSURE TREATED
PTD. PAINTED
P.T.D. PAPER TOWEL DISPENSER
QTR. QUARTER
QUAN. QUANTITY
R. RISER
R.A. RETURN AIR
RAD. RADIUS
RD. ROUND
REC'D. RECESSED
RECIRC. RECIRCULATING
RECP. RECEPTACLE
REG. REGISTER
REINF. REINFORCING
REQ'D. REQUIRED
RET. RETURN
R.G. RETURN GRILLE
RM. ROOM
S. SUPPLY
S.A. SUPPLY AIR
SCH. SCHEDULE
SECT. SECTION
SERV. SERVICE
SHT. SHEET
SIM. SIMILAR
SPEC. SPECIFICATIONS
SQ. FT., SF SQUARE FEET
STL. STEEL
STOR. STORAGE
STRUC. STRUCTURAL
SUSP. SUSPENDED
SW. SWITCH
STD. STANDARD
T., TOIL. TOILET
TEL. TELEPHONE
TEMP. TEMPERATURE
THK. THICKNESS
THD. THRESHOLD
TYP. TYPICAL
T.T.D. TOILET TISSUE DISPENSER
T.O.S. TOP OF STEEL
T AND G TONGUE AND GROOVE
TR. TREAD
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U.O.N. UNLESS OTHERWISE NOTED
V. VOLT
V.C.T. VINYL COMPOSITION TILE
VENT. VENTILATION
VERT. VERTICAL
VTR. VENT THRU ROOF
W
W. WATT
W/ WITH
WD. WOOD
W.G. WATER GAGE
WP. WEATHERPROOF
WTR. WATER
W.W.F. WELDED WIRE FABRIC
W.C. WATER CLOSET
W.H. WATER HEATER
U
V
A.C.M. ASBESTOS CONTAINING MATERIAL
R.P.M. REVOLUTIONS / MINUTE
R.O. ROUGH OPENING
FR. FRAME
CONDENSATE
FE FIRE EXTINGUISHER
STANDARD SYMBOLS
DETAIL NUMBER
SHEET DETAIL SHOWN ON
DETAIL NUMBER
SHEET DETAIL SHOWN ON
DETAIL NUMBER
SHEET DETAIL SHOWN ON
CONCRETE
SAND
GROUT
EARTH (COMPACTED)
EARTH (UNDISTURBED)
GRAVEL
CONCRETE / ASPHALT (NEW)
CMU (SECTION)
BRICK (SECTION)
CMU (PLAN)
STEEL
RIGID INSULATION
BATT INSULATION
BLOCKING
CMU (ELEVATION)
BRICK (ELEVATION)
GRATING
BOG. BOTTOM OF GRADE
G.F.G.I. GOVERNMENT FURNISHED
G.F.C.I. GOVERNMENT FURNISHED
GOVERNMENT INSTALLED
CONTRACTOR INSTALLED
SPF SPRAY POLYURETHANE FOAM
SAFB SOUND ATTENUATING
FIBERGLASS BATTS
COR CONTRACTING OFFICERS
REPRESENTITIVE
D
JH
D
JH
EA
H
G-002
AB
BR
EV
IA
TI
O
N S
SY
M
BO
LS
A N
D N
O
TE
S
SPRAY FOAM INSULATION
KEYED NOTE
WRB. WATER RESISTIVE BARRIER
1. THE DRAWINGS INDICATE THE GENERAL EXTENT OF WORK. THE DRAWINGS ARE NOT INTENDED TO INDICATE OR DESCRIBE ALL WORK REQUIRED FOR THE FULL PERFORMANCE AND COMPLETION OF THE REQUIREMENTS OF THE CONTRACT DOCUMENTS.
2. THE ENUMERATION OF PARTICULAR ITEMS OF WORK IN ONE PORTION OF THE CONTRACT DOCUMENTS SHALL NOT BE CONSTRUED TO EXCLUDE
OTHER ITEMS NECESSARY OR IMPLIED THEREFROM.
3. THE CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF ALL PARTS OF THE WORK SO THAT NO WORK SHALL BE LEFT IN AN UNFINISHED
OR INCOMPLETE CONDITION.
4. ALL WORK SHALL CONFORM TO APPLICABLE INDUSTRY AND MANUFACTURER'S PUBLISHED STANDARDS FOR QUALITY OF MATERIALS AND WORKMANSHIP, AS WELL AS, ALL REQUIREMENTS IN THESE DRAWINGS AND SPECIFICATIONS. ANY CONFLICTING REQUIREMENTS OF THE SOURCES LISTED ABOVE SHALL BE BROUGHT TO THE COR'S ATTENTION PRIOR TO PROCEEDING WITH THE WORK.
5. THE CONTRACTOR SHALL PAY FOR AND COORDINATE THE REMOVAL AND LEGAL DISPOSAL OF MATERIALS AND RUBBISH.
6. ONCE ON SITE, THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SHALL VERIFY ALL NEW AND EXISTING CONDITIONS SHOWN ON THESE DRAWINGS. THE CONTRACTOR SHALL NOTIFY THE COR IN WRITING OF ANY DIFFERING CONDITIONS BEFORE COMMENCEMENT OF WORK.
7. DO NOT SCALE DRAWINGS; DIMENSIONS GOVERN, LARGE SCALE DETAILS GOVERN OVER SMALL SCALE DETAILS. THE CONTRACTOR SHALL NOTIFY
THE COR IN WRITING OF ANY DIFFERING CONDITIONS BEFORE COMMENCEMENT OF WORK.
8. NFPA 241, STANDARD FOR SAFEGUARDING CONSTRUCTION, AND ALTERATION OPERATIONS SHALL BE APPLIED.
9. DIMENSIONS SHOWN ARE TO FACE OF STUD OR CMU (U.O.N.).
10. THE CONTRACTOR SHALL PERFORM ALL WORK IN ACCORDANCE WITH ALL APPLICABLE CODES, ORDINANCES AND REGULATORY AGENCIES AND SHALL OBTAIN NECESSARY BUILDING AND FIRE PERMITS FROM ALL AUTHORITIES HAVING JURISDICTION.
11. ALL DISSIMILAR METALS SHALL BE ISOLATED FROM EACH OTHER TO AVOID GALVANIC CORROSION.
12. NOTES APPEAR ON VARIOUS SHEETS FOR DIFFERENT SYSTEMS AND MATERIALS. SHEETS ARE TO BE REVIEWED AND NOTES ON INDIVIDUAL
SHEETS SHALL BE APPLIED TO RELATED DRAWINGS AND DETAILS.
13. DETAILS NOT SHOWN ARE SIMILAR IN CHARACTER TO THOSE DETAILED. WHERE SPECIFIC DIMENSIONS, DETAILS OR DESIGN INTENT CANNOT BE
DETERMINED, CONSULT THE COR BEFORE PROCEEDING WITH THE WORK.
14. DO NOT CUT INTO, REMOVE OR ALTER ANY STRUCTURAL MEMBER OR PORTION OF THE ROOF STRUCTURE UNLESS IT IS SPECIFICALLY NOTED OR
SHOWN ON THE DRAWINGS.
15. THE CONTRACTOR SHALL PLAN THEIR WORK TO PROVIDE ADEQUATE PROTECTION FOR PERSONS AND PROPERTY AT ALL TIMES, AND EXECUTE THE WORK IN SUCH A MANNER TO AVOID ANY HAZARD TO PERSONS AND PROPERTY THROUGHOUT THE EXECUTION OF THE PROJECT.
16. THE CONTRACTOR SHALL COORDINATE THE PHASING OF THE WORK TO BE PERFORMED IN OR ABOUT EXISTING FACILITIES, IF APPLICABLE, WITH
THE GOVERNMENT PRIOR TO START OF SUCH WORK.
17. ALL SIGNAGE TO BE APPROVED BY THE GOVERNMENT PRIOR TO ORDERING MATERIALS.
18. STORED MATERIALS SHALL BE KEPT DRY AND KEPT IN AN ORDERLY FASHION IN AN AREA DESIGNATED BY THE COR.
19. CONTRACTOR IS FULLY RESPONSIBLE FOR CONTACTING APPROPRIATE PARTIES AND ASSURING THAT EXISTING UTILITIES ARE LOCATED PRIOR TO
CONSTRUCTION.
20. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH WESTOVER AIR RESERVE BASE, STATE, AND LOCAL ORDINANCES AND REGULATIONS.
CONSTRUCTION SHALL ALSO COMPLY WITH UFC CRITERIA.
21. COORDINATE WITH THE COR REGARDING EXISTING UTILITIES ON-SITE THAT ARE TO REMAIN INTACT. ADDITIONALLY, COORDINATE WITH THE COR REGARDING INTERRUPTIONS OF UTILITY SERVICE AND SCHEDULED SERVICE OUTAGES TO COMPLETE THE REQUIRED WORK.
22. CONTRACTOR IS RESPONSIBLE FOR ALL UTILITY LOCATION VERIFICATION PRIOR TO CONSTRUCTION.
23. CONTRACTOR IS RESPONSIBLE FOR VISITING THE SITE PRIOR TO WORK BEGINNING TO FAMILIARIZE THEMSELVES WITH EXISTING CONDITIONS.
24. THE CONTRACTOR SHALL REMOVE AND REPLACE TONGUE AND GROOVE WOOD PLANKS IN AREAS WHERE DAMAGED OR ROTTED WOOD IS OBSERVED. CONTRACTOR SHALL INSPECT FASTENERS FOR EXISTING WOOD PLANKS TO MAKE SURE THAT THEY ARE PROPERLY FASTENED AND
REPLACE/TIGHTEN DAMAGED, MISSING OR LOOSE FASTENERS.
25. UNLESS NOTED, "EXISTING" OR GRAPHICALLY INDICATED AS EXISTING, ALL ELEMENTS SHOWN ON THE CONTRACT DRAWINGS ARE NEW.
26. CONTRACTOR IS RESPONSIBLE FOR THE FINAL ROOF SLOPE AND SHALL ADJUST THE SIZE AND/OR INSTALL ADDITIONAL TAPERED INSULATION, CRICKETS AND SADDLES AS NECESSARY TO ENSURE POSITIVE DRAINAGE AND THE FREE FLOW OF LIQUIDS TO THE ROOF DRAINS, GUTTERS, SCUPPERS, ETC. WITHOUT RESISTANCE OR PONDING WATER CONDITIONS.
27. CONTRACTOR IS RESPONSIBLE TO PROVIDE POSITIVE DRAINAGE THROUGHOUT THE DURATION OF CONSTRUCTION. PROVIDE ADDITIONAL TEMPORARY DRAINAGE AS NECESSARY TO ENSURE THE FREE FLOW OF LIQUIDS TO THE ROOF DRAINS, GUTTERS, SCUPPERS, ETC. WITHOUT
RESISTANCE OR THE FORMATION OF PONDING WATER CONDITIONS.
28. INCLUDE A BASE BID OF REPLACING TEN (10) ROOF DRAINS WITH NEW DRAIN ASSEMBLIES. ADDITIONAL REPLACEMENT OF ROOF DRAINS SHALL BE
REPLACED AT THE CONTRACT UNIT PRICE WHEN PRIOR APPROVAL IS PROVIDED BY COR.
29. CONTRACTOR TO PROVIDE TWO (2) STAIR TOWERS TO ALLOW FOR ROOF ACCESS, COORDINATE LOCATION WITH COR.
30. CONTRACTOR SHALL TAKE THE NECESSARY PRECAUTIONS TO PROTECT RECENTLY INSTALLED MEMBRANE FROM TRAFFIC AND EXCESSIVE DUST, DIRT, AND DEBRIS. THE COR RESERVES THE RIGHT TO HAVE THE CONTRACTOR CLEAN THE MEMBRANE TO AN AS NEW CONDITION AT NO COST.
31. THE ROOFING MEMBRANE SHALL NOT BE INSTALLED OVER AN ASPHALTIC SUBSTRATE. PROVIDE 1/2-INCH THICK PLYWOOD ON WALLS, CURBING, AND PERIMETER WOOD BLOCKING COATED WITH ASPHALT OR COAL TAR LAYER PRIOR TO INSTALLING THE ROOFING MEMBRANE/FLASHING.
ADEQUATELY ATTACH PLYWOOD TO SUBSTRATE WITH APPROPRIATE FASTENERS AND SPACING.
OF
AWNING
ROOF
AWNING
ROOF
AWNING
ROOF
AWNING
ROOF
AWNING
ROOF
AWNING
ROOF
AWNING
ROOF
AWNING
ROOF
OF
OF OF
BA
R
R
EL
R O
O F
BA
R
R
EL
R O
O F
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
9 9
9 9
'-2
VI
F
2'
-0
VI
F
'-4
VI
F
9'
-6
VI
F
229'-4" +/- VIF
ELEV 25'-0"
ELEV 65'-0"
ELEV 25'-0"
TYP
TYP
EXISTING ROOF SYSTEM, VIF:
· 80- MIL TPO MEMBRANE
· 1/2-INCH GYPSUM COVER BOARD
· HYPALON ROOFING MEMBRANE
· 2 INCHES POLYISO INSULATION
· 1-3/4-INCH TONGUE AND GROOVE WOOD PLANK DECK
EXISTING ROOF SYSTEM, VIF:
· 80- MIL TPO MEMBRANE
· 1/2-INCH GYPSUM COVER BOARD
· 2 INCHES POLYISO INSULATION
· CONCRETE DECK
EXISTING ROOF SYSTEM, VIF:
· 80- MIL TPO MEMBRANE
· 1/2-INCH GYPSUM COVER BOARD
· 2 INCHES POLYISO INSULATION
· CONCRETE DECK
C O
N
TR
AC
T
N O
FI
LE
N
AM
E:
D W
N B
Y:
C
KD
B
Y:
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
D
2 3
C
4 5
A
B
M
AR
K
AP
PR
N
TP
D
N U
M
BE
R
SI
ZE
SU
BM
IT
TE
D B
Y:
PL
O
T
SC
AL
E:
IS
SU
E D
AT
E:
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
D
EL
IV
ER
Y O
R D
ER
SHEET
IDENTIFICATION
D
AT
E
AP
PR
AN
SI
D
AS
N
O
TE
D
U .S
. A
IR
F O
R C
E R
ES
ER
VE
W es to ve r A R
B, C hi co pe e, M A
C O
M M
AN
D
YT
PM
4-
R
EP
AI
R
B
AR
R
EL
R O
O F
BL
D
G
1, H
AN
G
AR
W
ES
TO
VE
R
A R
B, C
H
IC
O
PE
E, M
A
AD101
D
EM
O
LI
TI
O
N R
O O
F
PL
AN
D
JH
D
JH
EA
H
KEYED NOTES
REMOVE SHEET METAL FLASHING AND DAMAGED WOOD BLOCKING.
REMOVE ABANDONED CONDUIT PENETRATION.
REMOVE FLASHING AT PLUMBING VENT THROUGH ROOF. VTR IS
EXISTING TO REMAIN.
REMOVE RETROFIT ROOF DRAIN.
REMOVE ROOF CURB.
REMOVE FLASHING AT FLOOD LIGHT.
REMOVE AND SALVAGE FOR INSTALLATION OF SNOW GUARD
SYSTEM IN ITS ENTIRETY. SEE PHOTO #1 THIS SHEET.
REMOVE FLASHING AT GRAVITY VENT.
REMOVE THROUGH WALL SCUPPER FLASHING. CONDUCTOR BOX
AND DOWNSPOUTS TO REMAIN IN PLACE. U.O.N.
REMOVE ROOF SYSTEM IN ITS ENTIRETY DOWN TO EXISTING ROOF
DECK. AT AREAS OF WOOD DECKING, ASSUME REMOVAL OF 5% OF
GENERAL NOTES
16'8'0 32'
SCALE: 1/16" = 1'-0"1 DEMOLITION ROOF PLAN
PLAN
NORTH
TRUE
NORTH
1. CONTRACTOR SHALL FOLLOW UFGS 02 82 00: ASBESTOS
REMEDIATION AND ALL FEDERAL, STATE, AND LOCAL REGULATIONS
FOR ASBESTOS WORK AND DISPOSAL.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL FROM THE SITE
AND PROPER DISPOSAL OF ANY DEBRIS ACCUMULATED DURING
CONSTRUCTION ON A DAILY BASIS.
3. THE BUILDING WILL REMAIN OCCUPIED THROUGHOUT THE EXECUTION
OF THE WORK. ALL AREAS SHALL BE WEATHER-TIGHT BETWEEN
WORK PERIODS TO PREVENT LEAKS DURING CONSTRUCTION.
4. THE CONTRACTOR SHALL NOT DEMO/TEAR OFF MORE ROOFING THAN
CAN BE REPLACED IN A SINGLE WORKING DAY.
5. THE CONTRACTOR SHALL PERFORM THE WORK ON THE BARREL
ROOF FIRST PRIOR TO COMMENCING WORK ON THE ADJACENT LOW
SLOPED ROOFS.
LEGEND
PHOTO #1
AREA OF WOOD DECK
PLUMBING VENT
RAISED PERIMETER EDGE METAL
RIDGE
SNOW GUARD SYSTEM
OVERFLOW SCUPPER
OF
ROOF DRAIN
AREA OF CONCRETE DECK
NOT IN SCOPE
SLOPE DIRECTION
ROOF CURB
OF
AWNING
ROOF
AWNING
ROOF
AWNING
ROOF
AWNING
ROOF
AWNING
ROOF
AWNING
ROOF
AWNING
ROOF
AWNING
ROOF
OF
OF OF
BA
R
R
EL
R O
O F
BA
R
R
EL
R O
O F
A501 A1
'-2
VI
F
2'
-0
VI
F
'-4
VI
F
9'
-6
VI
F
229'-4" +/- VIF
ELEV 25'-0"
ELEV 65'-0"
ELEV 25'-0"
A502 C1
A501 C1
UON
A501 C1
UON
A501 C3
A501 C1
UON
A501 C1
UON
A501 A4
A501 C3
A501 A4
A501 A1
A502 C3
TYP
A501 A2
A501 A1
A502 C1
A501 C1
A501 C1
UON
A501 C3
A501 C3
A502 C1
UON
TYP
A502 C3
A502 C1
A501 A1
A501 C3
A501 C1
A501 C1
UON
UON
TYP
A501 A2
TYP
TYP
TYP
A502 A2
TYP
A502 A4
TYP
A502 A4
TYP
C O
N
TR
AC
T
N O
FI
LE
N
AM
E:
D W
N B
Y:
C
KD
B
Y:
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
D
2 3
C
4 5
A
B
M
AR
K
AP
PR
N
TP
D
N U
M
BE
R
SI
ZE
SU
BM
IT
TE
D B
Y:
PL
O
T
SC
AL
E:
IS
SU
E D
AT
E:
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
D
EL
IV
ER
Y O
R D
ER
SHEET
IDENTIFICATION
D
AT
E
AP
PR
AN
SI
D
AS
N
O
TE
D
AP
R
IL
U .S
. A
IR
F O
R C
E R
ES
ER
VE
W es to ve r A R
B, C hi co pe e, M A
C O
M M
AN
D
YT
PM
4-
R
EP
AI
R
B
AR
R
EL
R O
O F
BL
D
G
1, H
AN
G
AR
W
ES
TO
VE
R
A R
B, C
H
IC
O
PE
E, M
A
A-101
R O
O F
PL
AN
D
JH
D
JH
EA
H
KEYED NOTES
NOT USED.
NOT USED.
REINSTALL SALVAGED SNOW GUARD SYSTEM IN ACCORDANCE WITH
MANUFACTURER'S REQUIREMENTS. ASSUME 5% REPLACEMENT OF
RAILS AND 1% FOR BRACKET SUPPORTS. DO NOT REUSE EXISTING
FASTENER PENETRATIONS IN DECK. OFFSET SUPPORTS TO FASTEN
THROUGH SOLID DECKING. PROVIDE MEMBRANE TARGET PATCH
BENEATH SUPPORT AND SET SUPPORT IN A GUN GRADE BUTYL
SEALANT OR MANUFACTURER APPROVED EQUAL.
PROVIDE A FALL PROTECTION SYSTEM IN ACCORDANCE WITH
MANUFACTURER'S DRAWINGS AND DETAILS. REFER TO SHEET S-101.
INSULATION SADDLES BETWEEN ROOF DRAINS, MINIMUM 1/4" PER
FOOT SLOPE.
PROVIDE FOLLOWING ROOFING SYSTEM OVER EXISTING ROOF DECK.
AT AREAS OF WOOD DECK ASSUME 5% REPLACEMENT OF DECK
PRIOR TO INSTALLATION OF NEW ROOFING SYSTEM:
80-MIL THERMOPLASTIC MEMBRANE
COVER BOARD
R-30 RIGID INSULATION
GENERAL NOTES
16'8'0 32'
SCALE: 1/16" = 1'-0"1 ROOF PLAN
PLAN
NORTH
TRUE
NORTH
1. CONTRACTOR SHALL FOLLOW UFGS 02 82 00: ASBESTOS
REMEDIATION AND ALL FEDERAL, STATE, AND LOCAL REGULATIONS
FOR ASBESTOS WORK AND DISPOSAL.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL FROM THE
SITE AND PROPER DISPOSAL OF ANY DEBRIS ACCUMULATED DURING
CONSTRUCTION ON A DAILY BASIS.
3. THE BUILDING WILL REMAIN OCCUPIED THROUGHOUT THE
EXECUTION OF THE WORK. ALL AREAS SHALL BE WEATHER-TIGHT
BETWEEN WORK PERIODS TO PREVENT LEAKS DURING
CONSTRUCTION.
4. THE CONTRACTOR SHALL NOT DEMO/TEAR OFF MORE ROOFING
THAN CAN BE REPLACED IN A SINGLE WORKING DAY.
5. THE CONTRACTOR SHALL PERFORM THE WORK ON THE BARREL
ROOF FIRST PRIOR TO COMMENCING WORK ON THE ADJACENT LOW
SLOPED ROOFS.
LEGEND
PLUMBING VENT
RAISED PERIMETER EDGE METAL
RIDGE
SNOW GUARD SYSTEM
OVERFLOW SCUPPER
OF
ROOF DRAIN WITH TAPERED SUMP
NOT IN SCOPE
SLOPE DIRECTION
ROOF CURB
FALL PROTECTION HORIZONTAL LIFELINE
FALL PROTECTION INDICATES END ANCHOR
FALL PROTECTION INTERMEDIATE ANCHOR
FALL PROTECTION INDICATES SINGLE POINT ANCHOR
8" M
IN
IM
U M
4" M
IN
. F
AC
E
2" M
IN
. O
R M
AT
C
H
EX
IS
TI
N G
E
LE
VA
TI
O N
W H
IC
H
EV
ER
IS
G
R
EA
TE
R
EQ
U
AL
-1 /2
" M
AX
1-1/2" MIN.
HOT AIR WELD
EQ
U
AL
-1 /2
" M
AX
COPING CAP JOINT PROFILE
SINGLE-LOCK STANDING SEAM; FOR USE WHERE
ADJACENT COPING CAPS ARE TO BE JOINED. AT STANDING
SEAM ENDS, CUT AT 45-DEGREE ANGLE, FOLD EAR OVER
END, AND CRIMP. LAP FASCIA JOINTS 4-INCH MINIMUM.
1"
SEALANT - SEAL BOTH ENDS
OF STANDING SEAM
METAL COPING CAP
METAL COPING CAP
METAL COPING CAP. TURN UP WALL
2-INCHES, MIN., INSTALL BUTYL TAPE
BEHIND TURN-UP, AND SECURE
FULLY-ADHERED FLASHING MEMBRANE
COPING CAP TERMINATION
AT END WALLS
FOR USE WHERE PARAPET WALLS AND
RELATED COPING CAPS TERMINATE
INTO VERTICAL WALLS.
METAL REGLETED COUNTERFLASHING.
SECURE TO SUBSTRATE WITH
GASKETED FASTENERS 12-INCHES
O.C., MIN. 2 FASTENERS
SEALANT
CUT REGLET INTO WALL
2" M
IN
1" M
IN
METAL COPING CAP, REFER TO ADJACENT COPING CAP
JOINT PROFILE ON THIS SHEET
PT BLOCKING
CONTINUOUS METAL CLEAT. SLOPED TOWARD INNER FACE
EXTEND FULLY-ADHERED FLASHING MEMBRANE UP AND
OVER PARAPET WALL, AND DOWN OUTSIDE FASCIA
R-30 RIGID INSULATION
EXISTING STRUCTURAL DECK
1/2" COVER BOARD
ROOFING MEMBRANE
SEALANT, SEE NOTE 1
MEMBRANE FASTENERS AND PLATES (LOCATION
APPLICABLE AT WOOD OR METAL DECK ONLY)
HOT-AIR WELD, 1-1/2" MINIMUM
FULLY-ADHERED FLASHING MEMBRANE
FASCIA EXTENSION
CONTINUOUS FASCIA
EXTENSION CLEAT
MEMBRANE FASTENERS AND PLATES (LOCATION
APPLICABLE AT CONCRETE DECK ONLY)
EXISTING MASONRY
GASKETED FASTENER
SEALANT
EXTEND MEMBRANE 1-1/2"
BEYOND FASTENER PLATE
R-30 RIGID INSULATION
EXISTING STRUCTURAL DECK
1/2" COVER BOARD
ROOFING MEMBRANE
HOT-AIR WELD, 1-1/2 INCH MIN.
1-1/2" MIN.
HOT AIR WELD
SLIP COUNTERFLASHING. SECURE TO
SUBSTRATE USING GASKETED FASTENERS
COUNTERFLASHING RECEIVER.
SECURE TO SUBSTRATE 12-INCHES O.C.
EXISTING METAL WALL PANEL - CUT USING A SHEARING
METHOD TO ALLOW FOR MINIMUM FLASHING HEIGHT
EXISTING WALL
EXISTING WEATHER RESISTIVE BARRIER, IF OCCURS -
LAP OVER STEEL COUNTERFLASHING RECEIVER
FULLY-ADHERED FLASHING MEMBRANE
MEMBRANE FASTENERS AND PLATES (LOCATION
APPLICABLE AT CONCRETE DECK ONLY)
CDX PLYWOOD SUBSTRATE, 1/2"
MIN. - SECURE WITH FASTENERS
SEALANT, SEE NOTE 1
MEMBRANE FASTENERS AND PLATES (LOCATION
APPLICABLE AT WOOD OR METAL DECK ONLY)
3"
1- 1/
2"
5/8"
3/4"
SIDING WIDTH PLUS 1/2"
8" M
IN
IM
U M
EXTEND MEMBRANE 1-1/2"
BEYOND FASTENER PLATE
EQ
U
AL
; 7
-1 /2
" M
AX
EQ
U
AL
; 7
-1 /2
" M
AX
2" M
IN
. O
R T
O M
AT
C
H E
XI
ST
IN
G
E
LE
VA
TI
O N
W H
IC
H
EV
ER
IS
G
R
EA
TE
R
1-1/2" MIN.
HOT AIR WELD
1/2" HUG
3"
1- 1/
2" R
IS
E
2" M
IN
H
T
VA
R
IE
S SEALANT, SEE NOTE 1
HOT-AIR WELD, 1-1/2" MIN.
FLASHING MEMBRANE, FULLY ADHERED TO CURB
METAL PERIMETER EDGE FASCIA
CONTINUOUS METAL CLEAT
R-30 RIGID INSULATION
EXISTING STRUCTURAL DECK
1/2" COVER BOARD
ROOFING MEMBRANE
PT BLOCKING - THICKNESS TO MATCH
MAXIMUM ROOF AREA INSULATION AND
COVER BOARD THICKNESS WITH A
CONSISTENT FINAL NAILER ELEVATION
SEALANT
MEMBRANE FASTENERS AND PLATES (LOCATION
APPLICABLE AT WOOD OR METAL DECK ONLY)
EXTEND MEMBRANE 1-1/2"
BEYOND FASTENER PLATE
EXTEND FLASHING MEMBRANE OVER AND
DOWN PERIMETER EDGE. APPLY SEALANT TO
BACKSIDE OF BOTTOM EDGE OF MEMBRANE
AS SHOWN, AND FASTEN MEMBRANE
1-1/2" MIN.
HOT AIR WELD
1/2" COVER BOARD
ROOFING MEMBRANE
MEMBRANE FASTENERS
AND PLATES, 12" O.C. MAX.
HOT-AIR WELD, 1-1/2" MIN.
R-30 RIGID INSULATION
EXISTING CONCRETE
STRUCTURAL DECK
SEALANT, SEE NOTE 1
ROOFING MEMBRANE,
EXTEND UPSLOPE 18" MIN.
EXISTING NAILER
EXISTING ANCHOR BOLT
EXISTING WOOD PLANK DECK
8" M
IN
FL
AS
H
IN
G H
EI
G
H T
CL
PIPE EXTENSION (IF NECESSARY) TO
ACHIEVE 8-INCH MIN. FLASHING HEIGHT.
PROVIDE SEALANT AT INTERSECTION
BETWEEN EXISTING TUBULAR
PENETRATION AND EXTENSION.
PRE-FABRICATED TUBULAR
PENETRATION FLASHING
CLAMPING BAND. SEAL TOP OF
FLASHING AND BAND AFTER
INSTALLATION
MIN. FOUR FASTENERS AND
PLATES AT BASE OF TUBULAR
PENETRATION
1-1/2" HOT-AIR WELD AT BASE
METAL STORM COLLAR INSTALL
BUTYL TAPE BEHIND COLLAR
PRIOR TO INSTALLATION OF
CLAMP. SEAL TOP OF HOOD
SEALANT - TYP
METAL CLAMPING BAND
FIELD-FABRICATED PRE-FABRICATED BOOT
NON-REINFORCED FLASHING
MEMBRANE; TWO PIECES, AS
SHOWN. FIELD FABRICATED
BOOT TO BE USED ONLY
WHEN PREMANUFACTURED
BOOT CAN NOT BE USED
HOT-AIR WELD BOTH PIECES OF
NON-REINFORCED FLASHING
MEMBRANE; MIN. 1-1/2" WELD
1/ 2"
M
IN
4" M
IN
R-30 RIGID INSULATIONEXISTING STRUCTURAL DECK
1/2" COVER BOARD
ROOFING MEMBRANE
SEALANT, SEE NOTE 1
EXISTING TUBULAR PENETRATION
EXTEND MEMBRANE 1-1/2"
BEYOND FASTENER PLATE
A-501
D
ET
AI
LS
SH
EE
T
O
F
D
JH
D
JH
EA
H
3" = 1' - 0" 1'6"3"0REF: A101
PARAPET WALL FLASHINGC1
3" = 1' - 0" 1'6"3"0REF: A101
ROOF TO WALL FLASHINGA1
3" = 1' - 0" 1'6"3"0REF: A101
RAISED PERIMETER FLASHINGC3
3" = 1' - 0" 1'6"3"0REF: A101
TUBULAR PENETRATION FLASHINGA2 3" = 1' - 0" 1'6"3"0REF: A101
MEMBRANE TRANSITION FLASHINGA4
NOTE 2: INSTALL INSIDE AND OUTSIDE FLASHING CORNERS FOLLOWING THE
RECOMMENDATIONS AND REQUIREMENTS OF THE ROOFING MEMBRANE
MANUFACTURER. PROVIDE "T-JOINT COVERS" AT THE BASE OF THE CURB
AT FLASHING PIECE INTERSECTIONS.
NOTE 1: MEMBRANE CUT EDGE SEALANT SHALL BE PROVIDED AFTER THE
MEMBRANE MANUFACTURER'S FIELD SERVICE REPRESENTATIVE HAS
INSPECTED AND APPROVED THE PROJECT FOR WARRANTY.
NOTE 6: PRIOR TO INSTALLATION OF NEW FLASHING AND COUNTERFLASHING,
INSPECT EXISTING WALLS FOR THE PRESENCE OF MASONRY WEEPS AND
OTHER WALL DRAINAGE MECHANISMS. DO NOT COVER WEEPS, OR IMPEDE
THE ABILITY OF MOISTURE TO EXIT WALL SYSTEMS.
NOTE 3: TAPERED INSULATION, IF SPECIFIED, IS NOT SHOWN FOR CLARITY.
NOTE 7: SECURE TOP EDGE OF FLASHING USING AN ALUMINUM TERMINATION BAR
SECURED 12-INCHES O.C., MAX., AND WITHIN 2-INCHES OF EACH END. PRIOR TO
TERMINATION BAR INSTALLATION, INSTALL MANUFACTURERS RECOMMENDED
SEALANT BEHIND FLASHING WHERE TERMINATION BAR WILL BE PLACED. SEAL
TOP EDGE OF FLASHING AND TERMINATION BAR AFTER INSTALLATION.
AT LOCATIONS WHERE THE FASCIA DIMENSION WILL BE GREATER
THAN 7-1/2 INCHES, FASCIA EXTENSION(S) ARE REQUIRED. EXPOSED
FASCIAS SHALL BE OF EQUAL LENGTH.
NOTE 5:
C O
N
TR
AC
T
N O
FI
LE
N
AM
E:
D W
N B
Y:
C
KD
B
Y:
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
D
2 3
C
4 5
A
B
M
AR
K
AP
PR
N
TP
D
N U
M
BE
R
SI
ZE
SU
BM
IT
TE
D B
Y:
PL
O
T
SC
AL
E:
IS
SU
E D
AT
E:
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
D
EL
IV
ER
Y O
R D
ER
SHEET
IDENTIFICATION
D
AT
E
AP
PR
AN
SI
D
AS
N
O
TE
D
U .S
. A
IR
F O
R C
E R
ES
ER
VE
W es to ve r A R
B, C hi co pe e, M A
C O
M M
AN
D
YT
PM
4-
R
EP
AI
R
B
AR
R
EL
R O
O F
BL
D
G
1, H
AN
G
AR
W
ES
TO
VE
R
A R
B, C
H
IC
O
PE
E, M
A
SHEET NOTES:
NOTE 4: A 4-INCH MINIMUM OVERLAP IS REQUIRED AT FLASHING JOINTS.
LCC
TAPERED INSULATION TO RESULT IN A 8-FOOT BY
8-FOOT MINIMUM TAPERED ROOF DRAIN SUMP AREA
WITH A MINIMUM SLOPE OF 1/2-INCH PER FOOT.
ROOF DRAIN ASSEMBLY
CAST IRON ROOF DRAIN STRAINER
CUT DRAINAGE HOLE IN MEMBRANE MIN. 1/2" GREATER
THAN DRAIN PIPE DIAM. ON ALL SIDES
EXTEND MEMBRANE 1" MIN.
BEYOND CLAMPING RING
MANUFACTURERS RECOMMENDED SEALANT. INSTALL ONE
TUBE, MINIMUM, UNDER ROOFING MEMBRANE AT CLAMPING
RING - TO ROOF DRAIN ASSEMBLY INTERSECTION.
APPROX. 4'-0" - REFER TO NOTE ABOVE REGARDING ROOF SUMP AREA CONSTRUCTION AND SLOPE REQUIREMENTS
ALIGN
ALIGN
R-30 RIGID INSULATION
EXISTING STRUCTURAL DECK
1/2" COVER BOARD
ROOFING MEMBRANE
H
EI
G H
T
VA
R
IE
S
1-1/2" MIN.
HOT AIR WELD
R-30 RIGID INSULATION
EXISTING STRUCTURAL DECK
1/2" COVER BOARD
ROOFING MEMBRANE
SEALANT, SEE NOTE 1
HOT-AIR WELD, 1-1/2" MINIMUM
FULLY-ADHERED FLASHING MEMBRANE - EXTEND
FULLY-ADHERED MEMBRANE UP AND OVER SCUPPER
OPENING AND DOWN OUTSIDE WALL. APPLY SEALANT
TO BACK SIDE OF MEMBRANE AND SECURE
METAL SCUPPER LINER - SECURE FLANGES TO SUBSTRATE
1-1/2" HOT AIR WELDS ON EACH EDGE OF STRIPPING
1- 1/
2" M
AX
RAISED PERIMETER EDGE BEYOND, LAP 4 INCHES
MINIMUM OVER FLANGE OF SCUPPER LINER
12" MIN.
4" MIN.
4" MIN.
4" MIN.
SCUPPER LINER DETAIL
SCALE: NONE
METAL SCUPPER LINER
SCUPPER OPENING
1-1/2" MAX.
SEALANT
SCUPPER FASTENER
FLASHING MEMBRANE STRIPPING AT SCUPPER
FLANGE FULLY ADHERED TO LINER
FIELD VERIFY SIZE OF
CONDUCTOR BOX. MINIMUM
SIZE OF CONDUCTOR BOX SHALL
MATCH EXISTING.
1" M
IN
FI
EL
D V
ER
IF
Y
SI
ZE
O
F C
O N
D U
C
TO
R B
O X.
M
IN
IM
U
M
SI
ZE
O
F C
O N
D U
C
TO
R B
O X
SH
AL
L M
AT
C
H E
XI
ST
IN
G
METAL DOWNSPOUT RECEIVER PIECE - SECURE AND
SEAL TO BOTTOM OF CONDUCTOR BOX AS SHOWN.
METAL DOWNSPOUT. TERMINATE BOTTOM OF DOWNSPOUT
WITH A METAL DOWNSPOUT ELBOW. LIQUIDS SHALL
DAYLIGHT AT SURFACE GRADE.
METAL CONDUCTOR BOX
7- 1/
2" M
AX
4"
R-30 RIGID INSULATION
EXISTING STRUCTURAL DECK
1/2" COVER BOARD
ROOFING MEMBRANE
SEALANT, SEE NOTE 1
HOT-AIR WELD, 1-1/2" MINIMUM
PRESSURE-SENSITIVE OUTER SEAM FLASHING
NOTE: PROVIDE AN ADDITIONAL 6" WIDE
MINIMUM REINFORCEMENT PIECE AT METAL
FASCIA JOINTS. REFER TO ROOFING
MEMBRANE MANUFACTURER FOR ADDITIONAL
REQUIREMENTS AND RECOMMENDATIONS AT
SHEET METAL FASCIA JOINTS
PT BLOCKING - THICKNESS TO MATCH
MAXIMUM ROOF AREA INSULATION AND
COVER BOARD THICKNESS
MEMBRANE FLASHING STRIP
METAL PERIMETER DRAINAGE
EDGE FASCIA
R-30 RIGID INSULATION
EXISTING STRUCTURAL DECK
1/2" COVER BOARD
ROOFING MEMBRANE
SEALANT, SEE
NOTE 1
HOT-AIR WELD,
1-1/2" MINIMUM
CONTINUOUS
METAL CLEAT
1-1/2" MIN.
HOT AIR WELD
PROVIDE 1/2" COVERBOARD, OVER
R-13.3 RIGID INSULATION AT
CONCRETE SUBSTRATE WALL FACE.
VIEW OF EXISTING
RAISED ROOF
FLASHING MEMBRANE,
FULLY ADHERED TO
WALL FACE
2" MIN. OR TO
MATCH EXISTING
ELEVATION
WHICHEVER IS
GREATER
EXTEND ROOFING
MEMBRANE OVER AND
DOWN PERIMETER
EDGE. APPLY
SEALANT TO BACK
SIDE OF MEMBRANE
AND SECURE
R30 RIGID INSULATION
EXISTING STRUCTURAL DECK
1/2" COVER BOARD
ROOFING MEMBRANE
SEALANT, SEE NOTE 1
MEMBRANE FASTENERS AND PLATES
HOT-AIR WELD, 1-1/2 INCH MIN.
PT BLOCKING
EXISTING ROOFTOP UNIT - TEMPORARILY
DISPLACE TO ALLOW FOR INSTALLATION OF
NEW ROOF SYSTEM. REINSTALL TO
ORIGINAL POSITION AFTER COMPLETION OF
WORK. RE-SECURE TO EXISTING CURB
WITH GASKETED FASTENERS
CURB INSULATION TO MATCH EXISTING.
METAL SLIP COUNTERFLASHING.
SECURE TO EXISTING CURB
COUNTERFLASHING AS SHOWN
USING GASKETED FASTENERS
EXISTING ROOFTOP UNIT
COUNTERFLASHING
FOR USE WHERE APPROVED AND WHERE EXISTING
ROOFTOP UNIT CANNOT BE DISPLACED TO ALLOW FOR
FLASHING, OR WHERE GAP BETWEEN EXISTING
ROOFTOP UNIT COUNTERFLASHING AND CURB IS TOO
NARROW TO ACCOMMODATE FLASHING
FLASHING MEMBRANE, FULLY
ADHERED TO CURB
4" M
IN
8" M
IN
4" M
IN
8" M
IN
FL
AS
H
IN
G H
EI
G
H T
1-1/2" MIN.
HOT AIR WELD
ALT. COUNTERFLASHING NO. 1
METAL SURFACE-MOUNTED
COUNTERFLASHING. SECURE
TO EXISTING CURB
COUNTERFLASHING AS SHOWN
USING GASKETED FASTENERS
SELF-ADHERING MEMBRANE
COMPATIBLE WITH EXISTING
SUBSTRATE(S)
ALT. COUNTERFLASHING NO. 2
FOR USE WHERE APPROVED AND WHERE
EXISTING CURB IS SEPARATED FROM THE
EXISTING ROOFTOP PENETRATION
BUTYL TAPE - INSTALL BEHIND
COUNTERFLASHING
SEALANT
4" M
IN
8" M
IN
FL
AS
H
IN
G H
EI
G
H T
SEALANT
EXTEND MEMBRANE 1-1/2"
BEYOND FASTENER
PLATE
EXISTING SLOPED 1-3/4" TONGUE AND
GROOVE WOOD STRUCTURAL DECK
REINSTALLED RAILS. REPLACE
DAMAGED RAILS TO MATCH EXISTING
REINSTALLED BRACKET. REPLACE DAMAGED
SNOW GUARD BRACKETS TO MATCH EXISTING.
SET BRACKETS IN GUN GRADE BUTYL SEALANT
HOT-AIR WELD,
1-1/2 INCH MIN.
SEALANT, SEE NOTE 1
R-30 RIGID INSULATION
PLYWOOD OVER CONTINUOUS PT WOOD
BLOCKING, ALIGN WITH TOP OF
ADJACENT COVERBOARD
4" MIN
ALL SIDES
WOOD SCREW, PREDRILL
HOLES IN WOOD BLOCKING
REINSTALLED STEEL BASE
PLATE SET IN SEALANT
THREADED BOLT WITH
LOCKING HEX NUT AND
GASKETED WASHER
EXISTING 2X6 CONTINUOUS
BATTEN SET ON PURLINS
EXISTING BEADBOARD AT UNDERSIDE OF
DECK. INSULATION FASTENERS SHALL NOT
PENETRATE EXISTING BEADBOARD.
ROOFING MEMBRANE
ROOFING MEMBRANE TARGET
PATCH, FULLY ADHERED
A-502
D
ET
AI
LS
SH
EE
T
O
F
D
JH
D
JH
EA
H
3" = 1' - 0" 1'6"3"0REF: A101
OVERFLOW SCUPPER FLASHINGC1 3" = 1' - 0" 1'6"3"0REF: A101
ROOF DRAIN FLASHINGC3
3" = 1' - 0" 1'6"3"0REF: A101
MEMBRANE TRANSITION FLASHINGA1 3" = 1' - 0" 1'6"3"0REF: A101
ROOF CURB FLASHINGA2
NOTE 2: INSTALL INSIDE AND OUTSIDE FLASHING CORNERS FOLLOWING THE RECOMMENDATIONS
AND REQUIREMENTS OF THE ROOFING MEMBRANE MANUFACTURER. PROVIDE "T-JOINT
COVERS" AT THE BASE OF THE CURB AT FLASHING PIECE INTERSECTIONS.
NOTE 1: MEMBRANE CUT EDGE SEALANT SHALL BE PROVIDED AFTER THE MEMBRANE
MANUFACTURER'S FIELD SERVICE REPRESENTATIVE HAS INSPECTED AND
APPROVED THE PROJECT FOR WARRANTY.
NOTE 3: TAPERED INSULATION, IF SPECIFIED, IS NOT SHOWN FOR CLARITY.
NOTE 5: AT LOCATIONS WHERE THE FASCIA DIMENSION WILL BE GREATER
THAN 7-1/2 INCHES, FASCIA EXTENSION(S) ARE REQUIRED.
EXPOSED FASCIAS SHALL BE OF EQUAL LENGTH.
NOTE 6: DIS-CONNECTIONS AND RE-CONNECTIONS OF ELECTRICAL, PLUMBING OR
MECHANICAL CONNECTIONS RELATED TO THE DISPLACEMENT AND
RE-INSTALLATION OF ROOFTOP UNITS SHALL BE PERFORMED BY A
CONTRACTOR LICENSED TO PERFORM SUCH WORK. COORDINATE THIS
WORK WITH THE COR.
C O
N
TR
AC
T
N O
FI
LE
N
AM
E:
D W
N B
Y:
C
KD
B
Y:
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
D
2 3
C
4 5
A
B
M
AR
K
AP
PR
N
TP
D
N U
M
BE
R
SI
ZE
SU
BM
IT
TE
D B
Y:
PL
O
T
SC
AL
E:
IS
SU
E D
AT
E:
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
D
EL
IV
ER
Y O
R D
ER
SHEET
IDENTIFICATION
D
AT
E
AP
PR
AN
SI
D
AS
N
O
TE
D
U .S
. A
IR
F O
R C
E R
ES
ER
VE
W es to ve r A R
B, C hi co pe e, M A
C O
M M
AN
D
YT
PM
4-
R
EP
AI
R
B
AR
R
EL
R O
O F
BL
D
G
1, H
AN
G
AR
W
ES
TO
VE
R
A R
B, C
H
IC
O
PE
E, M
A
4-
-2
PG
S
3" = 1' - 0" 1'6"3"0REF: A101
SNOW GUARD FLASHINGA4
SHEET NOTES:
NOTE 4: A 4-INCH MINIMUM OVERLAP IS REQUIRED AT FLASHING JOINTS.
C O
N
TR
AC
T
N O
FI
LE
N
AM
E:
D W
N B
Y:
C
KD
B
Y:
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
D
2 3
C
4 5
A
B
M
AR
K
AP
PR
N
TP
D
N U
M
BE
R
SI
ZE
SU
BM
IT
TE
D B
Y:
PL
O
T
SC
AL
E:
IS
SU
E D
AT
E:
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
D
EL
IV
ER
Y O
R D
ER
SHEET
IDENTIFICATION
D
AT
E
AP
PR
AN
SI
D
AS
N
O
TE
D
U .S
. A
IR
F O
R C
E R
ES
ER
VE
W es to ve r A R
B, C hi co pe e, M A
C O
M M
AN
D
YT
PM
4-
R
EP
AI
R
B
AR
R
EL
R O
O F
BL
D
G
1, H
AN
G
AR
W
ES
TO
VE
R
A R
B, C
H
IC
O
PE
E, M
A
4-
-2
PG
S
S-001
G
EN
ER
AL
N O
TE
S
JW D
G
P
EA
H
ST
R
U C
TU
R
AL
DESIGN CRITERIA:
1. THE DESIGN COMPLY WITH THE APPLICABLE REQUIREMENTS OF THE FOLLOWING STANDARDS:
a. UFC 1-200-01 “GENERAL BUILDING REQUIREMENTS”
b. UFC 3-301-01 STRUCTURAL ENGINEERING
c. INTERNATIONAL BUILDING CODE (IBC) 2018
d. INTERNATIONAL EXISTING BUILDING CODE (IEBC) 2018
e. ASCE/SEI 7-16 “MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES”
f. AISC 360-16 SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS
g. ACI 318-14 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE
h. AWC NDS-18 NATIONAL DESIGN SPECIFICATION FOR WOOD CONSTRUCTION
2. BUILDING OCCUPANCY CATEGORY II
3. DEAD LOADS: EXISTING / NEW
a. BARREL ROOF 13.8 PSF / 14.4 PSF
b. NORTH AND SOUTH WINGS 47.0 PSF / 48.1 PSF
4. LIVE LOADS:
a. ROOF 20 PSF
5. SNOW LOADS:
a. GROUND SNOW LOAD (PG) 35 PSF
b. IMPORTANCE FACTOR (IS) 1.0
c. EXPOSURE FACTOR (Ce) 1.0
d. THERMAL FACTOR (Ct) 1.1
e. FLAT ROOF SNOW LOAD (Pf) 27 PSF
6. WIND LOADS:
a. BASIC WIND SPEED, 3-SECOND GUST (V) 90 MPH
b. IMPORTANCE FACTOR (IW) 1.0
c. EXPOSURE C
d. INTERNAL PRESSURE COEFFICIENT (GCpi) +/- 0.18
e. COMPONENTS & CLADDING PRESSURES:
i BARREL ROOF +53.1/-111.5 PSF @ CORNERS
+53.1/-93.5 PSF @ EDGE
+53.1/60.0 PSF @ FIELD
ii NORTH AND SOUTH WINGS +15.6/-109.7 PSF @ CORNERS
+15.6/-80.5 PSF @ EDGE
+15.6/-61.0 PSF @ FIELD
7. SEISMIC LOADS:
a. SPECTRAL RESPONSE ACCELERATIONS: SS 0.168 S1 0.0.055
b. IMPORTANCE FACTOR (IE) 1.0
c. SITE CLASSIFICATION D (DEFAULT)
d. SEISMIC DESIGN CATEGORY B
e. SPECTRAL RESPONSE COEFFICIENTS: SDS 0.179
SD1 0.089
FALL PROTECTION NOTES:
1. FALL PROTECTION SYSTEM SHALL BE A MANUFACTURED AND ENGINEERED SYSTEM CONSISTING OF
CB-HYBRID PERMANENT HORIZONTAL LIFELINES. FALL PROTECTION SYSTEM MANUFACTURED BY
GUARDIAN. REFER TO FALL PROTECTION REFERENCE DRAWINGS INCLUDED IN BID SET.
2. MINIMUM LAYOUT REQUIREMENTS OF FALL PROTECTION ANCHORS ARE PROVIDED ON THE
DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR DESIGN OF A COMPLETE FALL PROTECTION
SYSTEM AND SHALL PROVIDE SHOP DRAWINGS AND CALCULATIONS PREPARED AND SEALED BY A
LICENSED ENGINEER. SHOP DRAWINGS SHALL INCLUDE SYSTEM LAYOUT AND ALL DETAILS
NECESSARY FOR CONNECTING SYSTEM TO THE BUILDING STRUCTURE.
3. FALL ARREST SYSTEM DESIGN AND INSTALLATION SHALL MEET ALL THE REQUIREMENTS OF THE
INTERNATIONAL BUILDING CODE AND ALL OHSA REGULATIONS.
4. INSTALLATION OF FALL COMPONENTS AND SYSTEMS SHALL BE CERTIFIED BY THE INSTALLING
CONTRACTOR.
GENERAL NOTES:
1. USE STRUCTURAL DRAWINGS IN CONJUNCTION WITH JOB SPECIFICATIONS AND ARCHITECTURAL
DRAWINGS. CONSULT THESE DRAWINGS FOR LOCATIONS AND DIMENSIONS OF OPENINGS,
CHASES, INSERTS, REGLETS, SLEEVES, DEPRESSIONS, AND OTHER DETAILS NOT SHOWN ON
STRUCTURAL DRAWINGS.
2. THE TERM “LICENSED ENGINEER” REFERS TO AN ENGINEER LICENSED IN ANY JURISDICTION
WITHIN THE UNITED STATES.
3. MAKE NO DEVIATIONS FROM THE DOCUMENTS WITHOUT WRITTEN DIRECTION FROM THE COR.
4. VERIFY ALL DIMENSIONS AND CONDITIONS IN THE FIELD. NOTIFY COR OF DISCREPANCIES
BETWEEN THE NOTES, DRAWINGS, SPECIFICATIONS, AND EXISTING CONDITIONS BEFORE
PROCEEDING WITH THE AFFECTED PORTIONS OF THE WORK.
5. COORDINATE ALL WORK WITH THE COR TO MINIMIZE DISRUPTION TO OPERATIONS, AND PROTECT
EXISTING FACILITIES, STRUCTURES, AND UTILITIES FROM DAMAGE.
6. SUBMIT COMPLETE SHOP DRAWINGS AND CALCULATIONS FOR ALL PARTS OF THE WORK,
INCLUDING DESCRIPTION OF SHORING, AND CONSTRUCTION METHODS AND SEQUENCING WHERE
APPLICABLE. NO PERFORMANCE OF THE WORK SHALL COMMENCE WITHOUT REVIEW OF THE
SHOP DRAWINGS BY THE COR.
7. ADHERE TO ALL APPLICABLE FEDERAL, STATE, AND MUNICIPAL LAWS, RULES, REGULATIONS, AND
ORDINANCES, INCLUDING THE FEDERAL DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND
HEALTH ACT (OSHA).
| Sheets and Views |
| G-001 |
| A-101.pdf |
| Sheets and Views |
| A-101 |
| A-501.pdf |
| Sheets and Views |
| A-501 |
| A-502.pdf |
| Sheets and Views |
| A-502 |
| AD101.pdf |
| Sheets and Views |
| AD101 |
| G-002.pdf |
| Sheets and Views |
| G-002 |
| S-001.pdf |
| Sheets and Views |
| S-101 |
| S-101.pdf |
| Sheets and Views |
| S-101 |
File details come from the government source that posted it. Updated .