Yellowstone Mill Project_Part3.pdf

PDF 1 MB Posted

Attached to
PKAA, 1000, Yellowstone Mill Project
Solicitation number
IFB1 PKAA 2015000199 2
Issued by
Huerfano County, Colorado

About this file

This is a pre-bid location map for the Yellowstone Mill Project Part 3. The document displays a geographic map identifying the project site in relation to nearby highways and local landmarks, specifically showing the project location at 210 Spencer Avenue in proximity to Highway 50 and Highway 135. The map includes a scale indicator measuring distances in miles (0 to 0.50 miles with 0.125-mile intervals), enabling potential bidders to understand the spatial context and accessibility of the project site prior to submitting bids.

The map serves as a visual reference document to assist prospective contractors in evaluating the project location and site conditions before the bidding process. No additional project specifications, timeline details, deliverables, or contractual terms are provided in this document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Yellowstone Project Pre-Bid Map

Pre-Bid Location 210 Spencer Avenue

Highway 50

Highway 135

0 0.25 0.50.125 Miles

File details come from the government source that posted it. Updated .